MAS ROOFING BENEFITS

1.
2.
3.
4.

Introduction

Provideacro
Insulation
on Roof.
Air Sabs is one of the
Light weight
and
easyforto install.
most efficient
material
roofing,
by meansagainst
of
Structural
savings
Roof Deck.
reducing heat as insulation it also
No
settlement
and can lastBenefits
for a life
time.
reduces
the energy consumption.
and Advantages:
1.
2.
3.
4.
5.

Easy to Install
Energy Efficient
Cost Efficient
Low Maintenance
Good for noise reduction

BUILD UP SYSTEM

MAS COATING

EXPANDED
POLYSTYRENE
P.U ADHESIVE

SYSTEM WEIGHT= 20kg/sq.m (100mm)

Product Data Sheet


Normal Thickness

100mm,125mm,150mm

Width

1200 mm

Length

2400 mm

Density Weight (EPS)

14.4 kg/m (0.90lb/f)

Density Weight (Coating)

1952 kg/m

Curing time

24 hrs

EPS R-Value

2.82

25 Kpa

Compression Resistance
at 1% deformation

Insulation Explanation

Convection

Convection

Conduction

Roofing Material

Heat Transfer

Conductiion
HEAT FLOW

Solar
Rays

Radiation
Radiation

Roofing Material (U-Value)

Metal Roof 0.4 mm


U = 8.5
R = 0.117

Expandable Polystyrene 100 mm


U = 0.357
R = 2.82

Roofing Material (U-Value)

Solar
Rays

Expandable
Polystyrene
100 mm
U = 0.357
R = 2.82

Solar
Rays

Metal Roof
0.4 mm
U = 8.5
R = 0.117

Higher
Radiation

Lower
Radiation

Normal Roofing Un-insulated

Heat Transfer
In order to maintain the
cool temperature
inside we need to have
additional cooler.
Radiation
12.5%
100%
efficient
cooler

cooler

Inside temperature
29 degrees
23

Solar rays
Outside radiant
temperature
32 degrees

Macro Air Sabs Roofing


Solar rays Reflected by the waterproofing

Heat Transfer
In order to
maintain cool
temperature
inside, we only
need to add a
4% Efficient
cooler
4%
cooler

cooler

Lower
Radiation

Inside temperature
23 degrees

Outside radiant
temperature
32 degrees

Maintenance Comparison

MAS ROOFING

SPF ROOFING

WATERPROOFING

MAS COATING
EXPANDABLE POLYSTYRENE
POLYURETHANE ADHESIVE

POLY URETHANE FOAM

EXISTING ROOFING

EXISTING ROOFING

AFTER FEW YEARS

Repair & Installation


Taal Vista Hotel Project

Old Roof with P.U Foam Insulation

METHODOLOGY

Removal of existing P.U. Foam

Application of Epoxy Primer

Preparation of EPS for Installation

Application of P.U. Adhesive

Laying of EPS

Macro Air Sabs Coating

Macro Air Sabs Coating

P U Foam Spray

Macro Air Sabs

Macro Air Sabs Roofing finish area

Applied Waterproofing