Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

DOCUMENT NO.

: QC 106/002

Date: 13/02/2006
1
Rev.: 1
2
Sheet 1 of 1

DOCUMENT TITLE :
PAINT SHOP ENVIRONMENT REPORT
Job No.: 50718

Job Title: Fabrication of Poles

Date

Time

Air Temp.
(C)

Steel Temp
(C)

Relative Humidity
(% RH)

Dew Point Temp.


(C)

14.03.2014

08:00

27.5

26.7

69.1

15.4

14.03.2014

11:00

25.1

24.9

70.5

13.6

14.03.2014

14:00

24.1

24.3

68.1

14.7

15.03.2014

08:00

29.7

28.5

67.3

16.1

15.03.2014

11:00

29.0

28.1

66.0

16.4

15.03.2014

14:00

25.1

24.0

67.7

15.6

17.03.2014

08:00

23.9

21.7

49.7

5.3

17.03.2014

11:00

22.0

20.5

51.3

6.1

17.03.2014

14:00

24.2

22.9

31.0

7.8

17.03.2014

17:00

23.9

22.7

40.5

8.8

28.03.2014

8:00

23.1

21.3

48.7

10.5

28.03.2014

11:00

22.1

19.7

41.8

5.3

28.03.2014

14:00

22.4

21.2

47.9

12.0

THE PERSON WHO


EXECUTES THE
WORK
COMPANY
TITLE
NAME
DATE
SIGNATURE

MQS
Paint Inspector
Mehman Nasibov
10.06.2010

APPROVED BY
(CONTRACTOR)

APPROVED BY
(CLIENT)

You might also like