Software Requirements List For Project

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 10

1

1
2
3
4
5
6
7
8
9
10
11
12
13Distribution List:
14[1]
15

16

17

18

19

Software Requirements List


for
Project

31.1 Project Overview


61.2 References
71.3 Definitions and Acronyms
8Refer to the Standard List in the Error: Reference source not found. Below are definitions specific to this
9project.

5 December 2014
2

popi classification

12. Customer Inputs


162.1 Requirements
17This section states the customer requirements. Those requirements that have been added or changed since the
18Statement of Work has been signed are highlighted with Italic font.
19 2.1.1 Architectural
21 2.1.2 Business
23 2.1.3 Design
25 2.1.4 Features/Functions
27 2.1.5 Target Platform
29 2.1.6 Host Platform
31 2.1.7 Implementation
33 2.1.8 Interfaces
35 2.1.9 Installation
37 2.1.10 Legal
39 2.1.11 Each document shall have a copyright that reads:
40 2.1.12 Each product shall have an invocation copyright
41 2.1.13 Performance
43 2.1.14 Test
45 2.1.15 Documentation

13. Development and Testing Environment Requirements


23.1 Hardware Requirements
4 3.1.1 Development Machine Configuration
5 3.1.2 Test Machine Configuration
6 3.1.3 Other Boards and Boxes
133.2 Software Requirements
15 3.2.1 Development Machine Configuration
16 3.2.2 Test Machine Configuration
213.3 Customer Delivered Hardware and Software

5 December 2014
2

popi classification

14. Target Environment Requirements

15. Special Development Considerations


25.1 Customer Participation Requirements
45.2 Communication Requirements
75.3 Other Development Considerations

5 December 2014
2

popi classification

16. Post Development Requirements


26.1 Training Requirements
46.2 Technology Transfer Requirements
66.3 Maintenance Policy
7 Maintenance Process is provided in Error: Reference source not found.

17. Technical Risks and Risk Abatement Procedures


2Refer to Risk Status Log and Issue Status Log for information about identified risks and occurred risks. Refer to
3Risk Management Forms and Issue Management Forms for more information about corrective actions for High
4risks and Red issues.

5 December 2014
2

popi classification

18. List of Deliverables to the Customer

You might also like