Professional Documents
Culture Documents
Incremental Launched Bridge: Main Span
Incremental Launched Bridge: Main Span
Main Span
40 m
F = a+2d
Depth
Top Flange Width
Top Flange thickness
Bot Flange Width (44% of F)
Web thickness
No of Webs
B
H
tt
B
tb
tw
N
Efficiency pf = I/(yu.yl.A)
A
I
Yup
Ylow
pf
Span
Min axial prestressing
Fmin = kg.A.L2/(pf.H)
k
(specific weight of concrete) g =
Fmin
Check H = 0.94 + L/22.7
Top slab tt = a /(25 to 30)
(min 220 to 260)
H
Span to Depth
a
tt
2700
14000
300
6160
340
240
2
7283200
8.45E+12
994.6
1705.4
0.684
mm
mm
mm
mm
mm
mm
Theoretical value
2702 mm
288 mm
336 mm
241 mm
mm2
mm4
mm
mm
40000 mm
(0.16 to 0.22 for deck
0.22
front zone
25 kN/m3
34720 kN
2702 mm
14.8
7500 mm
288 mm
(value)
241 mm
bott slab tb = (b-tw)(0.07-L/3700) with min value of 180mm or 240mm with long
prestresssing tendons
b=B-tw
5920 mm
tb
336 mm
26
Section
Width
1
2
3
4
5
6
Sum
14000
480
6160
0
0
Depth
300
2060
340
0
0
2700
Existing
Area
Dist to centroid
A
y
4200000
150
988800
1330
2094400
2530
0
2700
0
2700
7283200
9410
xcentroid = SumAy/Sum A
xcenttop =
Ixx= Sum(Ay2)+Sum(Ixxlocal)-xcent2*Sum(Area)
Ay
6.3E+08
1.32E+09
5.3E+09
0
0
0
7.24E+09
994.6 mm
Ixx section =
4
8.45E+12 mm
Ztop
Zbot
3
8.49E+09 mm
3
4.95E+09 mm
Ay2
9.45E+10
1.75E+12
1.34E+13
0
0
0
1.52E+13
xcentbot
rxx (mm) =
Ixxlocal
3.15E+10
3.50E+11
2.02E+10
0.00E+00
0.00E+00
4.01E+11
1705.4
1077