Gantt Chart For Electrical Sensor For Scale Deposition Detection Using Graphene
Gantt Chart For Electrical Sensor For Scale Deposition Detection Using Graphene
Gantt Chart For Electrical Sensor For Scale Deposition Detection Using Graphene
Literature Review
COMSOL model for MPX100
Build required circuit for sensor
Thesis Proposal
Update COMSOL model for tested sensor
Decide type of graphene needed
Test graphene sensor created
Thesis Report and presentation preperation
Starting date
10/20/2013
3/30/2014
3/15/2014
6/1/2014
7/1/2014
7/14/2014
8/1/2014
9/1/2014
Duration (days)
425
7
12
15
12
16
12
80
Ending date
12/18/2014
4/5/2014
3/26/2014
6/15/2014
7/12/2014
7/29/2014
8/12/2014
11/19/2014
Literature Review
Thesis Proposal
Thesis Proposal
Literature Review
9/23/2013
Duration (days)
1/1/2014
10/20/2013
425
12
Literature Review
8/1/2014 9/1/2014
11/12/2013
Chart Title
1/1/2014
Build required circuit for
sensor
3/15/2014
2/20/2014
4/11/2014
5/31/2014
7/20/2014
9/8/2014
6/1/2014
15
12
16
12
Thesis Proposal
10/28/2014
Test graphene sensor