GENERAL ASSEMBLY
General condition satisfactory
Bolting/grouting satisfactory
OK
NO
N/A
COMMENT
ACTION
OK
NO
N/A
COMMENT
ACTION
Check leaking
Check pressure
Vibration satisfactory
Noise satisfactory
Sealing satisfactory
NOTE:
TECHNICAL DEPT
CONTRACTOR / VENDOR
CHECKED BY:
CHECKED BY:
FOR:
CHECKED BY:
FOR:
TITLE:
DATE:
TITLE:
DATE:
TITLE:
DATE:
PRODUCTION DEPT
PROJECT TITLE:
DATE:
OK
NO
N/A
COMMENT
ACTION
5
6
7
Handrail availability
Protection availability (cover, etc)
Access availability (platform, stair, ladder, walkway,
etc)