DAFTAR PERHITUNGAN KONVERSI BESI

#REF!
#REF!
#REF!
#REF!
#REF!

No.

Dimensi Beton / M

Uraian Pekerjaan
h

Luas
Bekisting / M

Jenis Besi

Berat Besi /
M

(Kg)

Besi Begel / M
Jarak M

Jumlah

Jml Besi

Pjg Besi

Berat Besi /
M

Batang

Kg

A. KOLOM
1

Kolom Praktis 12/12

B. Sloof
Sloof Beton 12/12

C. Ring Balk
Ring Balok 12/12

Ring Balok Gantung 12/12

Plat Lantai 8 Cm

0.15

0.15

0.02

44.44

0.15

0.15

0.02

44.44

0.12

0.12

0.01

69.44

0.12

0.12

0.01

69.44

0.12

0.12

0.01

69.44

0.12

0.12

0.01

69.44

0.12

0.12

0.01

69.44

0.12

0.12

0.01

69.44

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

13.33

16.67

16.67

25.00

1.00

10.00

0.617

6.00

0.222

4.000

177.78

109.600

0.150

6.67

3.333

148.15

32.880
142.480

10.00

0.617

6.00

0.222

4.00

277.78

171.250

0.15

6.67

2.533

175.93

39.045
210.295

10.00

0.617

6.00

0.222

4.00

277.78

171.250

0.15

6.67

3.200

222.22

49.320
220.570

10.00

0.617

6.00

4.00

277.78

171.250

0.222

0.15

6.67

3.200

222.22

49.320
220.570

8.00

0.395

0.15

13.33

14.333

14.33

5.655

8.00

0.395

0.15

13.33

14.333

14.33

5.655
11.311

Kolom Beton 50 x 60

Kolom Beton 25 x 25

Kolom Beton (K.3) 20 x 50

Footplat 1 - 72 x 110 Cm
T = 23 cm

Footplat 1 - 130 x 55 Cm
T = 20 cm

B. Sloof
Sloof - 15/20

Sloof Beton 20 x 35

C. Balok
Balok Beton (B1) 20/60

Balok Beton (B2) 15/20

Balok Beton Bordes (BB) 12/34

Ring Balok Balok Beton (RB1) 15/15

Ring Balok Balok Beton (RB2) 15/20

0.50
0.50
0.50

0.60
0.60
0.60

0.30
0.30
0.30

3.33
3.33
3.33

7.33

0.25
0.25
0.25

0.25
0.25
0.25

0.06
0.06
0.06

16.00
16.00
16.00

16.00

0.20
0.20
0.20

0.50
0.50
0.50

0.10
0.10
0.10

10.00
10.00
10.00

14.00

0.23

1.00

0.23

4.35

4.35

0.23

1.00

0.23

4.35

0.20

1.00

0.20

5.00

0.20

1.00

0.20

5.00

0.15
0.15
0.15

0.20
0.20
0.20

0.03
0.03
0.03

33.33
33.33
33.33

13.33

0.20
0.20
0.20

0.35
0.35
0.35

0.07
0.07
0.07

14.29
14.29
14.29

10.00

0.20
0.20
0.20

0.60
0.60
0.60

0.12
0.12
0.12

8.33
8.33
8.33

11.67

0.15
0.15
0.15

0.20
0.20
0.20

0.03
0.03
0.03

33.33
33.33
33.33

18.33

0.12
0.12
0.12

0.34
0.34
0.34

0.04
0.04
0.04

24.51
24.51
24.51

19.61

0.15
0.15
0.15

0.15
0.15
0.15

0.02
0.02
0.02

44.44
44.44
44.44

13.33

0.15
0.15
0.15

0.20
0.20
0.20

0.03
0.03
0.03

33.33
33.33
33.33

13.33

5.00

12.00
8.00

0.888
0.395

6.67

8.000
14.000

26.67
46.67

23.674
18.413
42.086

0.150

10.00
8.00

0.617
0.395

0.150

6.67

8.000
6.000

128.00
96.00

78.912
37.878
116.790

14.00
8.00

1.208
0.395

0.150

6.67

8.000
8.667

80.00
86.67

96.667
34.195
130.862

12.00

0.888

0.15

13.33

14.333

62.32

55.324

12.00

0.888

0.15

13.33

14.333

62.32

55.324
110.648

12.00

0.888

0.10

20.00

21.000

105.00

93.215

12.00

0.888

0.10

20.00

21.000

105.00

93.215
186.430

12.00
8.00

0.888
0.395

0.150

6.67

4.000
4.000

133.33
133.33

118.368
52.608
170.976

14.00
10.00
8.00

1.208
0.617
0.395

0.150

6.67

5.000
4.000
6.667

71.43
28.57
95.24

86.310
17.614
37.577
141.501

16.00
14.00
10.00

1.578
1.208
0.617

0.150

6.67

5.000
6.000
10.667

41.67
50.00
88.89

65.760
60.417
54.800
180.977

12.00
8.00

0.888
0.395

0.150

6.67

6.000
6.000
4.667

200.00
200.00
155.56

177.552
61.376
238.928

14.00
10.00
8.00

1.208
0.617
0.395

0.150

6.67

4.000
2.000
6.133

98.04
49.02
150.33

118.465
30.221
59.313
207.998

10.00
6.00

0.617
0.222

0.150

6.67

4.000
4.000

177.78
177.78

109.600
39.456
149.056

10.00
8.00

0.617
0.395

0.150

6.67

4.000
4.667

133.33
155.56

82.200
61.376

143.576
3

Ring Balok Balok Beton (RB3) 12/30

0.12
0.12
0.12

0.30
0.30
0.30

0.04
0.04
0.04

27.78
27.78
27.78

20.00

0.12

1.00

0.12

8.33

8.33

0.12

1.00

0.12

8.33

0.10

1.00

0.10

10.00

0.10

1.00

0.10

10.00

0.12

1.00

0.12

8.33

0.12

1.00

0.12

8.33

0.60
0.60
0.60

0.40
0.40
0.40

0.24
0.24
0.24

4.17
4.17
4.17

5.00

0.35
0.35
0.35

0.25
0.25
0.25

0.09
0.09
0.09

11.43
11.43
11.43

8.00

0.50
0.50
0.50

0.50
0.50
0.50

0.25
0.25
0.25

4.00
4.00
4.00

8.00

0.15
0.15
0.15

0.15
0.15
0.15

0.02
0.02
0.02

44.44
44.44
44.44

13.33

Strauss 30
L = 1/4 . 3.14 . D
K = 3.14 . D

0.30
0.30
0.30

0.30
0.30
0.30

0.07
0.07
0.07

14.15
14.15
14.15

13.33

Footplat 1 - 120 x 120 Cm


T = 40 cm

0.40

1.00

0.40

2.50

2.50

0.40

1.00

0.40

2.50

0.40

1.00

0.40

2.50

0.40

1.00

0.40

2.50

0.30

1.00

0.30

3.33

0.30

1.00

0.30

3.33

0.30
0.30
0.30

0.50
0.50
0.50

0.15
0.15
0.15

6.67
6.67
6.67

8.67

0.30
0.30
0.30

0.40
0.40
0.40

0.12
0.12
0.12

8.33
8.33
8.33

9.17

0.25
0.25
0.25

0.35
0.35
0.35

0.09
0.09
0.09

11.43
11.43
11.43

10.86

0.25
0.25
0.25

0.35
0.35
0.35

0.09
0.09
0.09

11.43
11.43
11.43

10.86

0.30
0.30
0.30

0.40
0.40
0.40

0.12
0.12
0.12

8.33
8.33
8.33

9.17

0.15
0.15
0.15

0.20
0.20
0.20

0.03
0.03
0.03

33.33
33.33
33.33

13.33

0.12

1.00

0.12

8.33

8.33

0.12

1.00

0.12

8.33

0.10

1.00

0.10

10.00

0.10

1.00

0.10

10.00

D. Plat Lantai
Plat Lantai 12 Cm

Plat Atap 10 Cm

Plat Lantai 12 Cm

A. SLOOF
Sloof (S1) - 60/40

Sloof (S2) - 35/25

B. KOLOM & FOOTPLAT


Kolom (K1) - 50/50
Hook

Kolom (K2) - 15/15

Footplat 1 - 120 x 170 Cm


T = 40 cm

Footplat Core
T = 30 cm

C. BALOK & PLAT


Balok Beton (B1) 30/50

Balok Beton (B2) 30/40

Balok Beton (B.a1) 25/35

Balok Beton (B.a2) 25/35

Balok Beton Kantilever (BK) 30/40

Balok Beton Latei (BL) 15/20

Lantai
T = 12 cm

Plat Atap
T = 10 cm

10.00

8.33

2.50

3.33

10.00

12.00
10.00
8.00

0.888
0.617
0.395

6.67

5.000
4.000
5.600

138.89
111.11
155.56

0.150

123.300
68.500
61.376
253.176

10.00

0.617

10.00

0.617

0.15

13.33

14.333

119.44

73.638

0.15

13.33

14.333

119.44

73.638
147.275

10.00
8.00

0.617

0.10

20.00

21.000

210.00

129.465

0.395

0.10

20.00

21.000

210.00

82.858
212.323

12.00

0.888

0.15

13.33

14.333

119.44

106.038

10.00

0.617

0.15

13.33

14.333

119.44

73.638
179.676

22.00
22.00
10.00

2.984
2.984
0.617

0.125

8.00

8.000
2.000
15.200

33.33
4.17
63.33

99.462
12.433
39.045
150.940

22.00
10.00
10.00

2.984
0.617
0.617

0.125

8.00

5.000
2.000
8.800

57.14
22.86
100.57

170.506
14.091
62.002
246.600

22.00
10.00
10.00

2.984
0.617
0.617

0.175

5.71

12.000
10.857
10.857

48.00
43.43
43.43

143.225
26.774
26.774
196.773

10.00
8.00

0.617
0.395

0.175

5.71

4.000
2.857

177.78
126.98

109.600
50.103
159.703

10.00
10.00
8.00

0.617
0.617
0.395

0.13

8.00

8.000
7.536

113.23
106.67

69.809
42.086
111.895

22.00

2.984

0.10

20.00

21.000

52.50

156.653

22.00

2.984

0.10

20.00

21.000

52.50

156.653
313.305

22.00

2.984

0.10

20.00

21.000

52.50

156.653

22.00

2.984

0.10

20.00

21.000

52.50

156.653
313.305

14.00

1.208

0.15

13.33

14.333

47.78

57.732

14.00

1.208

0.15

13.33

14.333

23.89

28.866
86.598

22.00
10.00
10.00

2.984
0.617
0.617

0.125

8.00

9.000
2.000
12.800

60.00
13.33
85.33

179.032
8.220
52.608
239.860

22.00
10.00
10.00

2.984
0.617
0.617

0.125

8.00

9.000
2.000
11.200

75.00
16.67
93.33

223.790
10.275
57.540
291.605

22.00
10.00
10.00

2.984
0.617
0.617

0.125

8.00

5.000
2.000
9.600

57.14
22.86
109.71

170.506
14.091
67.639
252.237

22.00
10.00
10.00

2.984
0.617
0.617

0.125

8.00

5.000
2.000
9.600

57.14
22.86
109.71

170.506
14.091
67.639
252.237

22.00
10.00
10.00

2.984
0.617
0.617

0.125

8.00

9.000
2.000
11.200

75.00
16.67
93.33

223.790
10.275
57.540
291.605

12.00
10.00

0.888
0.617

0.150

6.67

4.000
4.667

133.33
155.56

118.368
95.900
214.268

12.00

0.888

0.10

20.00

21.000

175.00

155.358

12.00

0.888

0.10

20.00

21.000

175.00

155.358
310.716

10.00

0.617

0.15

13.33

14.333

143.33

88.365

10.00

0.617

0.15

13.33

14.333

143.33

88.365
176.730

Dinding Core
T = 20 cm

Dinding + Lantai 10 Cm
T = 10 cm
Dinding + Lantai 8 Cm
T = 10 cm

Lantai
T = 12 cm

Balok Beton (B.a1) 40/60

Balok Beton (B.a1) 25/45

0.20

1.00

0.20

5.00

0.20

1.00

0.20

5.00

0.10

1.00

0.10

10.00

0.10

1.00

0.10

0.08

1.00

0.08

12.50

0.08

1.00

0.08

0.12

1.00

0.12

8.33

0.12

1.00

0.12

8.33

0.40
0.40
0.40

0.60
0.60
0.60

0.24
0.24
0.24

4.17
4.17
4.17

6.67

0.25
0.25
0.25

0.45
0.45
0.45

0.11
0.11
0.11

8.89
8.89
8.89

10.22

25/45

10.00

10.00

0.617

0.15

13.33

14.333

71.67

44.183

14.00

1.208

0.15

13.33

14.333

71.67

86.598
130.780

10.00

0.617

0.15

13.33

14.333

143.33

88.365

0.15

13.33

14.333

10.00

0.617

0.15

13.33

14.333

179.17

88.365
110.456

0.15

13.33

14.333

110.456

10.00

0.617

0.10

20.00

21.000

175.00

107.888

10.00

0.617

0.15

13.33

14.333

119.44

73.638
181.525

22.00
10.00
10.00

2.984
0.617
0.617

0.125

8.00

5.000
2.000
16.000

20.83
8.33
66.67

62.164
5.138
41.100
108.401

16.00
19.00
8.00

1.578
2.226
0.395

0.150

6.67

12.000
2.000
9.333

106.67
17.78
82.96

168.346
39.566
32.734
240.645

54.00
33.00
32.00

1.15
1.60
0.65

62.10
52.80
20.80

25,000.00
25,000.00
25,000.00

212.00
25.44

25,000.00
4,618.00

1,100.00

10.00

12.50

8.33

240.65

########
########
########

########
########
########

bakesting
Besi Plat

########
########

D. LANTAI & LISPLANK


8

Lisplank 8/50

0.50
0.50
0.50

0.10
0.10
0.10

0.05
0.05
0.05

20.00
20.00
20.00

22.00

E. KOLOM BULAT
Kolom Bulat 30
L = 1/4 . 3.14 . D
K = 3.14 . D

0.30
0.30
0.30

0.30
0.30
0.30

0.07
0.07
0.07

14.15
14.15
14.15

13.33

Kolom Bulat 25
L = 1/4 . 3.14 . D
K = 3.14 . D

0.25
0.25
0.25

0.25
0.25
0.25

0.05
0.05
0.05

20.38
20.38
20.38

16.00

Kolom Bulat 20
L = 1/4 . 3.14 . D
K = 3.14 . D

0.20
0.20
0.20

0.20
0.20
0.20

0.03
0.03
0.03

31.85
31.85
31.85

20.00

12.00
10.00
8.00

0.888
0.617
0.395

0.15

8.00

4.000
8.000
9.600

80.00
160.00
192.00

71.021
98.640
75.756
245.416

14.00
14.00
8.00

1.208
1.208
0.395

0.15

6.67

4.000
4.000
6.280

56.62
56.62
88.89

68.413
68.413
35.072
171.897

12.00
12.00
8.00

0.888
0.888
0.395

0.15

6.67

4.000
4.000
5.233

81.53
81.53
106.67

72.378
72.378
42.086
186.842

12.00
12.00
8.00

0.888
0.888
0.395

0.15

6.67

2.000
2.000
4.187

63.69
63.69
133.33

56.545
56.545
52.608
165.698

Gording C 150 . 70 . 20 . 7 mm

Gording C 150 . 70 . 20 . 7 mm
Contoh Soal Pelat Baja 1 m x 1 m x 1mm = ?
1 M3 Besi = 7850 Kg
=
1.00 x
1.00 x 0.001 x
7,850
=
=
0.150 +
0.140 + 0.040
0.33
=
=

0.33

0.007

7,850

18.13 Kg/M1

0.012

1.00

0.006

7,850

0.350
0.350

x
x

0.011
0.007

=
=

0.004
0.002
0.006

7,850

49.46

Pelat Baja 1 m x 1 m x 1mm = ?


1.00
x
1.00

7.85 Kg

x
L
D

1 M3 Besi = 7850 Kg
0.012
x
7,850
= 800 mm
=0.8 m
= 120 mm

Kuda-Kuda Baja Horisontal IWF 200 . 150 . 6 . 9 mm

Kuda-Kuda Baja Vertikal IWF 350 . 175. 7 . 11 mm

0.57 Kg

3.50

1.98

=0.12 m

sehingga (R) = 0.06

Kuda-Kuda Baja Vertikal IWF 350 . 175. 7 . 11 mm

Kuda-Kuda Baja Vertikal IWF 350 . 175. 7 . 11 mm

0.350
0.350

0.350
0.350

x
x

x
x

0.011
0.007

0.011
0.007

=
=

=
=

0.004
0.002
0.006

7,850

49.46

0.004
0.002
0.006

7,850

49.46

Kuda-Kuda Baja Vertikal IWF 350 . 175. 7 . 11 mm

0.350
0.350

x
x

0.011
0.007

=
=

0.004
0.002
0.006

7,850

49.46

0.001
0.003
0.004

7,850

30.62

49.46 Kuda-Kuda Baja Vertikal IWF 350 . 175. 7 . 11 mm


30.62 Kuda-Kuda Baja Horisontal IWF 200 . 150 . 6 . 9 mm
0.200
0.300

x
x

0.006
0.009

=
=

Kuda-Kuda Baja Horisontal IWF 200 . 150 . 6 . 9 mm


=

0.006

1.00

0.003

7,850

0.14 Kg

3.50

0.49

0.012

1.00

0.006

7,850

0.57 Kg

3.50

1.98

3.00

1.48

22500
33382.125

=
D

= 120 mm

=0.12 m

94.20 Kg

sehingga (R) = 0.06 m

KEGIATAN
LOKASI

:
:

PEMBANGUNAN RUMAH TINGGAL

NO.

URAIAN PEKERJAAN

JUMLAH HARGA

I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X.
XII.
A.

PEKERJAAN PERSIAPAN
PEKERJAAN TANAH DAN PASIR
PEKERJAAN PASANGAN
PEKERJAAN BETON
PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI
PEKERJAAN KAP, ATAP DAN PLAFOND
PEKERJAAN PENGECETAN
PEKERJAAN ALAT PENGGANTUNG
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN SANITASI
PEKERJAAN AKHIR

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,970,800.00
3,236,078.03
57,124,463.93
31,185,414.31
2,700,000.00
10,144,846.95
5,084,922.78
576,141.00
5,095,270.00
7,192,264.28
500,000.00

REAL COST

Rp

126,810,201.28

Terbilang

: #NAME?

ENGINEER ESTIMATE (EE)


KEGIATAN
LOKASI

: PEMBANGUNAN RUMAH TINGGAL TYPE 45


:

NO

URAIAN PEKERJAAN

VOLUME

1
I.
1
2

PEKERJAAN PERSIAPAN
Pek. Pembersihan Lokasi
Pek. Pengukuran dan Pemasangn Bowplank

II.
1
2
3
4
5
6

PEKERJAAN TANAH DAN PASIR


Pek. Galian Tanah Pondasi
Pek. Urugan Tanah Bekas Galian
Pek. Urugan Pasir Dibawah Pondasi
Pek. Urugan Sirtu Dibawah Lantai
Pek. Pemadatan Urugan Sirtu
Pek. Urugan Pasir Dibawah Lantai

III.
1
2
3
4
5
6
7
8
8
9

PEKERJAAN PASANGAN
Pek. Pasangan Batu Kosong
Pek. Pasangan Pondasi Batu Kali 1 : 5
Pek. Pas. Dinding Batu Bata 1 : 3
Pek. Pas. Dinding Batu Bata 1 : 5
Pek. Plesteran Dinding Batu Bata 1 : 5
Pek. Plesteran Pondasi 1 : 3
Pek. Acian Dinding, Pondasi
Pek. Pas. Dinding Keramik 20 x 25 cm WC
Pek. Pas. Lantai Keramik 20 x 20 cm
Pek. Pas. Lantai Keramik 30 x 30 cm

HARGA
SATUAN
(Rp)
4

JUMLAH HARGA
(Rp.)
5

180.000 m2
54.000 m1

8,500.00
45,200.00

1,530,000.00
2,440,800.00
3,970,800.00

8.435
2.109
1.205
14.175
14.175
4.253

m3
m3
m3
m3
m3
m3

39,250.00
13,060.00
135,700.00
122,250.00
28,500.00
135,700.00

331,073.75
27,540.28
163,518.50
1,732,893.75
403,987.50
577,064.25
3,236,078.03

2.41
9.113
8.175
180.750
361.500
361.500
8.175
2.625
47.250

m3
m3
2
m
m2
m2
m2
m2
m2
1
m
m2

275,205.00
538,705.00
116,781.00
111,284.00
36,784.20
39,793.80
20,870.00
162,325.00
165,405.00
166,765.00

663,244.05
4,909,117.66
954,684.68
20,114,583.00
13,297,488.30
7,544,505.00
1,327,006.88
434,188.13
7,879,646.25
57,124,463.93

1
IV.
1
2
3
4
5

PEKERJAAN BETON
Pek. Cor Beton 1 : 3 : 5 (Cor Lantai)
Pek. Sloof Beton Bertulang 12 x 12 cm
Pek. Kolom Beton Bertulang 12 x 12 cm
Pek. Ring Balk Bertulang 12 x 12 cm
Pek. Plat Atap Beton Bertulang T = 8 cm

4.725
1.808
1.742
1.356
0.608

m3
3
m
m3
3
m
m3

654,957.02
5,376,550.91
4,989,982.06
6,628,119.43
1,146,921.78

3,094,671.94
9,718,115.78
8,690,053.76
8,985,244.40
697,328.44
31,185,414.31

V.
1
2

PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI


Pek. Pintu Panil
Pek. Jendela

6.000 Bh
2
m

450,000.00
119,750.00

2,700,000.00
2,700,000.00

VI.
1
2
3
4
5

PEKERJAAN KAP, ATAP DAN PLAFOND


Pek. Atap Genteng Metal Multiroof
Pek. Bubungan Atap Multiroof
Pek. Plafond Ggypsum
Pek. List Profil Gypsum
Pek. Lisplank Wood Plank

m2
m1
2
m
m1
m1

74,400.00
72,684.00
88,050.00
16,311.00
24,525.00

4,426,800.00
421,567.20
4,160,362.50
770,694.75
365,422.50
10,144,846.95

361.500 m2
47.250 m2
3.725 m2

12,214.50
12,214.50
24,764.00

4,415,541.75
577,135.13
92,245.90
5,084,922.78

5.000 Bh
6.000 Bh

86,910.00
23,598.50

434,550.00
141,591.00
576,141.00

VII. PEKERJAAN PENGECETAN


1 Pek. Pengecetan Dinding Tembok
2 Pek. Pengecetan Plafond
3 Pek. Pengecetan Lisplank
VIII. PEKERJAAN ALAT PENGGANTUNG
1 Pek. Pas. Kunci Pintu
2 Pek. Pas. Engsel Pintu

59.500
5.800
47.250
47.250
14.900

1
IX.
1
2
3
4
5
6
7
8
9

PEKERJAAN INSTALASI LISTRIK


Pek. Pas. Instalasi Titik Mata Lampu + Kabel NYY 2,5
Pek. Pas. Instalasi Titik Stop Kontak + Kabel NYY 2,5
Pek. Pas. Lampu xl 18 watt
Pek. Pas. Lampu xl 11 watt
Pek. Pas. Stop Kontak
Pek. Pas. Saklar Tunggal
Pek. Pas. Saklar Ganda
Pek. Pas. Panel Box
Pek. Pas. Daya Listrik 900 Watt

7.000 Ttk
5.000 Ttk
5.000 Bh
3.000 Bh
5.000 Bh
4.000 Bh
2.000 Bh
1.000 Bh
1.000 Ls

135,000.00
135,000.00
90,413.50
60,413.50
23,413.50
22,413.50
24,913.50
85,413.50
2,500,000.00

945,000.00
675,000.00
452,067.50
181,240.50
117,067.50
89,654.00
49,827.00
85,413.50
2,500,000.00
5,095,270.00

X.
1
2
3
4
5
6

PEKERJAAN SANITASI
Pek. Pasangan Closet Duduk INA
Pek. Kran Dinding
Pek. Floor Drain
Pek. Bak Kamar Mandi
Pek. Septic Tank + Peresapan
Pek. Pas. Pompa Air

1.000 Bh
1.000 Bh
1.000 Bh
1.000 Bh
1.000 Unit
1.000 Ls

181,165.00
16,793.75
40,660.00
373,145.00
4,080,500.53
2,500,000.00

181,165.00
16,793.75
40,660.00
373,145.00
4,080,500.53
2,500,000.00
7,192,264.28

500,000.00

500,000.00
500,000.00

XII. PEKERJAAN AKHIR


1 Pek. Pembersihan Akhir

1.000

Ls

DAFTAR ANALISA HARGA SATUAN MATA PEMBAYARAN UTAMA


KEGIATAN
LOKASI

: PEMBANGUNAN RUMAH TINGGAL TYPE 45


:

1. 1 M MEMBERSIHKAN LAPANGAN DAN PERALATAN


Tenaga
0.100
Oh
Pekerja
0.050
Oh
Mandor

Rp.
Rp.

50,000.00
70,000.00
Jumlah

= Rp.
= Rp.
Rp.

5,000.00
3,500.00
8,500.00

Rp.
Rp.
Rp.

1,700,000.00
15,000.00
1,700,000.00

= Rp.
= Rp.
= Rp.

20,400.00
300.00
11,900.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
6,500.00
750.00
350.00
45,200.00

3. 1M3 GALIAN TANAH BIASA SEDALAM 1 METER


Tenaga
0.750
Oh
Pekerja
0.025
Oh
Mandor

Rp.
Rp.

50,000.00
70,000.00
Jumlah

= Rp.
= Rp.
Rp.

37,500.00
1,750.00
39,250.00

4. 1M GALIAN TANAH BIASA SEDALAM 2 METER


Tenaga
0.900
Oh
Pekerja
0.045
Oh
Mandor

Rp.
Rp.

50,000.00
70,000.00
Jumlah

= Rp.
= Rp.
Rp.

45,000.00
3,150.00
48,150.00

Rp.
Rp.

50,000.00
70,000.00
Jumlah

= Rp.
= Rp.
Rp.

12,500.00
560.00
13,060.00

2. 1 MPENGUKURAN DAN PEMASANGAN BOWPLANK


Bahan
0.012
M3
Kayu 5/7
0.020
Kg
Paku 2,5" - 3,5"
0.007
M3
Papan 3/20
Tenaga
0.100
Oh
Pekerja
0.100
Oh
Tukang
0.010
Oh
Kepala Tukang
0.005
Oh
Mandor

5. 1 M URUGAN KEMBALI
Tenaga
0.250
0.008

Oh
Oh

Pekerja
Mandor

6. 1 M URUGAN PASIR
Bahan
1.200

Pasir Urug

Rp.

100,000.00 =

Rp.

120,000.00

Rp.
Rp.

50,000.00 =
70,000.00 =
Jumlah

Rp.
Rp.
Rp.

15,000.00
700.00
135,700.00

Tenaga
0.300
0.010

Oh
Oh

Pekerja
Mandor

7. 1 M TANAH URUG/ TIMBUNAN


Bahan
1.200

Sirtu

Rp.

90,000.00 =

Rp.

108,000.00

Rp.
Rp.

50,000.00 =
70,000.00 =
Jumlah

Rp.
Rp.
Rp.

12,500.00
1,750.00
122,250.00

Rp.
Rp.

50,000.00 =
70,000.00 =
Jumlah

Rp.
Rp.
Rp.

25,000.00
3,500.00
28,500.00

Rp.

225,000.00 =

Rp.

270,000.00

Rp.
Rp.

50,000.00 =
70,000.00 =
Jumlah

Rp.
Rp.
Rp.

12,500.00
1,750.00
284,250.00

Rp.

135,000.00 =

Rp.

162,000.00

Rp.
Rp.

50,000.00 =
70,000.00 =
Jumlah

Rp.
Rp.
Rp.

39,000.00
2,730.00
203,730.00

= Rp.
= Rp.

162,000.00
43,200.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

39,000.00
25,350.00
2,925.00
2,730.00
275,205.00

= Rp.
= Rp.
= Rp.

162,000.00
176,800.00
65,280.00

Tenaga
0.250
0.025

Oh
Oh

Pekerja
Mandor

8. 1 M MEMADATKAN TANAH URUG/ TIMBUNAN (PER 20 CM)


Tenaga
0.500
Oh
Pekerja
0.050
Oh
Mandor

9. 1 M URUGAN KERIKIL
1.200

M3

0.250
0.025

Oh
Oh

Bahan
Kerikil Sungai
Tenaga
Pekerja
Mandor

10. 1 M URUGAN BATU KALI


1.200

0.780
0.039

Oh
Oh

Bahan
Batu Kali / Batu Gunung
Tenaga
Pekerja
Mandor

11. 1 M PASANGAN BATU KOSONG


Bahan
1.200
0.432

M3
M3

Batu Kali
Pasir Urug

Rp.
Rp.

135,000.00
100,000.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

Rp.
Rp.
Rp.

135,000.00
1,300.00
120,000.00

Tenaga
0.780
0.390
0.039
0.039

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala Tukang
Mandor

12. 1 M PASANGAN PONDASI BATU KALI 1 PC : 5 PSR


Bahan
1.200
Batu Kali
M3
136.000
Kg
Semen Portland (50 Kg)
3
0.544
Pasir Pasang
M

1.500
0.750
0.075
0.075

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

13. 1 M PASANGAN DINDING BATU BATA TEBAL 1/2 BATA CAMPURAN 1 PC : 3 PSR
Bahan
70.000
Buah
Batu Bata Ukuran
Rp.
1,000.00
14.370
Kg
Semen Portland (50 Kg)
Rp.
1,300.00
0.040
Pasir Pasang
Rp.
120,000.00
M3
Tenaga
0.300
Oh
Pekerja
Rp.
50,000.00
0.100
Oh
Tukang
Rp.
65,000.00
0.010
Oh
Kepala Tukang
Rp.
75,000.00
0.015
Oh
Mandor
Rp.
70,000.00
Jumlah
14. 1 M PASANGAN DINDING BATU BATA TEBAL 1/2 BATA CAMPURAN 1 PC : 5 PSR
Bahan
70.000
Buah
Batu Bata Ukuran
Rp.
1,000.00
9.680
Kg
Semen Portland (50 Kg)
Rp.
1,300.00
3
0.045
Pasir
Pasang
Rp.
120,000.00
M
Tenaga
0.300
Oh
Rp.
50,000.00
Pekerja
0.100
Oh
Rp.
65,000.00
Tukang
0.010
Oh
Rp.
75,000.00
Kepala Tukang
0.015
Oh
Rp.
70,000.00
Mandor
Jumlah
15. 1 M PEKERJAAN PLESTERAN 1 PC : 3 PSR TEBAL 15 MM
Bahan
7.776
Kg
Semen Portland (50 Kg)
0.023
Pasir Pasang
M3
Tenaga
0.300
Oh
Pekerja
0.150
Oh
Tukang
0.015
Oh
Kepala Tukang
0.015
Oh
Mandor

16. 1 M PEKERJAAN PLESTERAN 1 PC : 5 PSR TEBAL 15 MM


Bahan
5.184
Kg
Semen Portland (50 Kg)
0.026
Pasir Pasang
M3

Rp.
Rp.

1,300.00
120,000.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

Rp.
Rp.

1,300.00
120,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
48,750.00
5,625.00
5,250.00
538,705.00

= Rp.
= Rp.
= Rp.

70,000.00
18,681.00
4,800.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
6,500.00
750.00
1,050.00
116,781.00

= Rp.
= Rp.
= Rp.

70,000.00
12,584.00
5,400.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
6,500.00
750.00
1,050.00
111,284.00

= Rp.
= Rp.

10,108.80
2,760.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
9,750.00
1,125.00
1,050.00
39,793.80

= Rp.
= Rp.

6,739.20
3,120.00

0.300
0.150
0.015
0.015

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

Rp.

1,300.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

Rp.
Rp.
Rp.

150,000.00
1,300.00
120,000.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
9,750.00
1,125.00
1,050.00
36,784.20

= Rp.

4,225.00

17. 1 M PEKERJAAAN ACIAN


3.250

Kg

0.200
0.100
0.001
0.001

Oh
Oh
Oh
Oh

Bahan
Semen Portland (50 Kg)
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

18. 1 M PEKERJAAN MEMASANG DINDING BATU ALAM


Bahan
2
1.100
Batu Alam
M
11.750
Kg
Semen Portland (50 Kg)
0.035
Pasir Pasang
M3
Tenaga
0.700
Oh
Pekerja
0.350
Oh
Tukang
0.035
Oh
Kepala Tukang
0.035
Oh
Mandor

19. 1 M PEKERJAAN PLESTERAN CIPRAT/KOMPROTAN 1 PC : 2 PSR


Bahan
4.320
Kg
Semen Portland (50 Kg)
Rp.
0.006
Pasir Pasang
Rp.
M3
Tenaga
0.300
Oh
Pekerja
Rp.
0.100
Oh
Tukang
Rp.
0.010
Oh
Kepala Tukang
Rp.
0.015
Oh
Mandor
Rp.

20. 1 M PASANG LANTAI KERAMIK 40 X 40 CM


Bahan
6.630
Bh
Tegel Keramik 30 x 30 cm
9.800
Kg
Semen Portland (50 Kg)
0.045
Pasir Pasang
M3
1.300
Kg
Nat / Mortar Flex
Tenaga
0.700
Oh
Pekerja
0.350
Oh
Tukang
0.035
Oh
Kepala Tukang
0.035
Oh
Mandor

1,300.00
120,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

10,000.00
6,500.00
75.00
70.00
20,870.00

= Rp.
= Rp.
= Rp.

165,000.00
15,275.00
4,200.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

35,000.00
22,750.00
2,625.00
2,450.00
247,300.00

= Rp.
= Rp.

5,616.00
720.00

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
6,500.00
750.00
1,050.00
29,636.00

Rp.
Rp.
Rp.
Rp.

10,000.00
1,300.00
120,000.00
15,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

66,300.00
12,740.00
5,400.00
19,500.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

35,000.00
22,750.00
2,625.00
2,450.00
166,765.00

21. 1 M PASANG LANTAI KERAMIK 20 X20 CM


Bahan
26.500
Bh
Tegel Keramik 20 x 20 cm
10.400
Kg
Semen Portland (50 Kg)
0.045
Pasir Pasang
M3
1.620
Kg
Nat / Mortar Flex
Tenaga
0.700
Oh
Pekerja
0.350
Oh
Tukang
0.035
Oh
Kepala Tukang
0.035
Oh
Mandor

22. 1 M PASANG DINDING KERAMIK 20 X25 CM


Bahan
20.000
Bh
Tegel Keramik 20 x 20 cm
9.300
Kg
Semen Portland (50 Kg)
3
0.018
Pasir Pasang
M
1.500
Kg
Nat / Mortar Flex
Tenaga
0.900
Oh
Pekerja
0.450
Oh
Tukang
0.045
Oh
Kepala Tukang
0.045
Oh
Mandor

23. 1 M MEMBUAT BETON 1 PC : 3 PSR : 5 KRK


Bahan
230.000
Kg
Semen Portland
0.638
Pasir Pasang
M3
0.761
Kerikil Sungai
M3
Tenaga
1.650
Oh
Pekerja
0.275
Oh
Tukang
0.028
Oh
Kepala Tukang
0.083
Oh
Mandor

24. 1 M MEMBUAT BETON BERTULANG 1 PC : 2 PSR : 3 KRK


Bahan
326.000
Kg
Semen Portland
0.543
Pasir Pasang
M3
0.735
Kerikil Sungai
M3
Tenaga
1.650
Oh
Pekerja
0.275
Oh
Tukang
0.028
Oh
Kepala Tukang
0.083
Oh
Mandor

Rp.
Rp.
Rp.
Rp.

2,240.00
1,300.00
120,000.00
15,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

59,360.00
13,520.00
5,400.00
24,300.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

35,000.00
22,750.00
2,625.00
2,450.00
165,405.00

Rp.
Rp.
Rp.
Rp.

2,240.00
1,300.00
120,000.00
15,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

44,800.00
12,090.00
2,160.00
22,500.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

45,000.00
29,250.00
3,375.00
3,150.00
162,325.00

Rp.
Rp.
Rp.

1,300.00
120,000.00
225,000.00

= Rp.
= Rp.
= Rp.

299,000.00
76,542.86
171,166.67

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

82,500.00
17,875.00
2,062.50
5,810.00
654,957.02

Rp.
Rp.
Rp.

1,300.00
120,000.00
225,000.00

= Rp.
= Rp.
= Rp.

423,800.00
65,142.86
165,375.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

82,500.00
17,875.00
2,062.50
5,810.00
762,565.36

Rp.
Rp.
Rp.
Rp.
Rp.

25. 10 KG PEMBESIAN DENGAN BESI POLOS / ULIR


Bahan
10.500
Kg
Besi Beton Polos
0.150
Kg
Kawat Bendrat
Tenaga
0.070
Oh
Pekerja
0.070
Oh
Tukang
0.0070
Oh
Kepala Tukang
0.0040
Oh
Mandor

Rp.
Rp.

10,000.00
20,000.00

= Rp.
= Rp.

105,000.00
3,000.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,500.00
4,550.00
525.00
280.00
116,855.00
11,685.50

Rp.
Rp.
Rp.

1,700,000.00
15,000.00
17,250.00

= Rp.
= Rp.
= Rp.

76,500.00
4,500.00
1,725.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

26,000.00
16,900.00
1,950.00
1,820.00
129,395.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
15,000.00
17,250.00
1,700,000.00
15,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

68,000.00
6,000.00
3,450.00
25,500.00
30,000.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

33,000.00
21,450.00
2,475.00
2,310.00
192,185.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
15,000.00
17,250.00
1,700,000.00
15,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

68,000.00
6,000.00
3,450.00
30,600.00
30,000.00

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

33,000.00
21,450.00
2,475.00
2,310.00
197,285.00

UNTUK 1 KG PEMBESIAN = (ANALISA NO.25 / 10 KG)


26. 1 M PASANG BEKISTING UNTUK SLOOF
0.045
0.300
0.100

M3
Kg
Liter

0.520
0.260
0.026
0.026

Oh
Oh
Oh
Oh

Bahan
Kayu Terentang / Mall ( Kelas III )
Paku 2,5" - 3,5"
Minyak Bekisting
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

27. 1 M PASANG BEKISTING UNTUK KOLOM


0.040
0.400
0.200
0.015
2.000

M3
Kg
Liter

0.660
0.330
0.033
0.033

Oh
Oh
Oh
Oh

M3
Btg

Bahan
Kayu Terentang / Mall ( Kelas III )
Paku 2,5" - 3,5"
Minyak Bekisting
Balok Kayu
Dolken Kayu Galam 8 - 10 P = 4 m
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

28. 1 M PASANG BEKISTING UNTUK BALOK


3

0.040
0.400
0.200
0.018
2.000

M
Kg
Liter

0.660
0.330
0.033
0.033

Oh
Oh
Oh
Oh

M3
Btg

Bahan
Kayu Terentang / Mall ( Kelas III )
Paku 2,5" - 3,5"
Minyak Bekisting
Balok Kayu
Dolken Kayu Galam 8 - 10 P = 4 m
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

29. 1 M PASANG BEKISTING UNTUK PLAT LANTAI


Bahan
0.040
Kayu Terentang / Mall ( Kelas III )
M3
0.400
Kg
Paku 2,5" - 3,5"
0.200
Liter
Minyak Bekisting
0.015
Balok Kayu
M3
6.000
Btg
Dolken Kayu Galam 8 - 10 P = 4 m
Tenaga
0.660
Oh
Pekerja
0.330
Oh
Tukang
0.033
Oh
Kepala Tukang
0.033
Oh
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
15,000.00
17,250.00
1,700,000.00
15,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.

68,000.00
6,000.00
3,450.00
25,500.00
90,000.00
0.00
33,000.00
21,450.00
2,475.00
2,310.00

Rp.

252,185.00

30. 1 M PEKERJAAN SLOOF BETON BERTULANG 12 x 12


1.000
Beton
M3
210.295
Kg
Besi Beton
M
16.667
Bekisting Sloof

Rp.
Rp.
Rp.

762,565.36
11,685.50
129,395.00
Jumlah

= Rp.
= Rp.
= Rp.
Rp.

762,565.36
2,457,402.22
2,156,583.33
5,376,550.91

31, 1 M PEKERJAAN
1.000
142.480
13.333

M3
Kg
M

KOLOM BETON BERTULANG 12 x 12


Beton 1 : 2 : 3
Besi Beton
Bekisting Kolom

Rp.
Rp.
Rp.

762,565.36
11,685.50
192,185.00
Jumlah

= Rp.
= Rp.
= Rp.
Rp.

762,565.36
1,664,950.04
2,562,466.67
4,989,982.06

32. 1 M PEKERJAAN
1.000
209.728
18.000

M3
Kg
M

KOLOM BETON BERTULANG 20 x 20


Beton 1 : 2 : 3
Besi Beton
Bekisting Kolom

Rp.
Rp.
Rp.

762,565.36
11,685.50
192,185.00
Jumlah

= Rp.
= Rp.
= Rp.
Rp.

762,565.36
2,450,780.84
3,459,330.00
6,672,676.20

33. 1 M PEKERJAAN
1.000
220.570
16.667

M3
Kg
M

BALOK BETON BERTULANG 12 x 12


Beton 1 : 2 : 3
Besi Beton
Bekisting Balok

Rp.
Rp.
Rp.

762,565.36
11,685.50
197,285.00
Jumlah

= Rp.
= Rp.
= Rp.
Rp.

762,565.36
2,577,470.74
3,288,083.33
6,628,119.43

34. 1 M PEKERJAAN
1.000
158.140
18.333

M3
Kg
M

BALOK BETON BERTULANG 15X 20


Beton 1 : 2 : 3
Besi Beton
Bekisting Balok

Rp.
Rp.
Rp.

762,565.36
11,685.50
197,285.00
Jumlah

= Rp.
= Rp.
= Rp.
Rp.

762,565.36
1,847,940.86
3,616,891.67
6,227,397.88

35. 1 M PEKERJAAN
1.000
11.311
1.000

PLAT ATAP BETON BERTULANG T = 10 CM


Beton 1 : 2 : 3
Rp.
M3
Kg
Besi Beton
Rp.
M
Bekisting Plat
Rp.

762,565.36
11,685.50
252,185.00
Jumlah

= Rp.
= Rp.
= Rp.
Rp.

762,565.36
132,171.42
252,185.00
1,146,921.78

36. 1 M3 PEKERJAAN
1.000
130.000
12.000

PLAT PENUTUP SEPTIKTANK BETON BERTULANG T = 8 Cm

M3
Kg
M2

Beton 1 : 2 : 3
Besi Beton
Bekisting Lantai

Rp.
Rp.
Rp.

37. 1 M PASANG KONSTRUKSI KUDA-KUDA KAYU Kls. II (SNI 3434:2008)


Bahan
1.100
M
Kayu Kelas II, Balok
Rp.
15.000
Kg
Besi Strip
Rp.
5.600
Kg
Paku Biasa 2"-5"
Rp.

762,565.36 =
11,685.50 =
252,185.00 =
Jumlah

Rp.
Rp.
Rp.
Rp.

762,565.36
1,519,115.00
3,026,220.00
5,307,900.36

11,685.50 =
25,000.00 =
70,000.00 =

Rp.
Rp.
Rp.

12,854.05
375,000.00
392,000.00

Rp.
Rp.
Rp.
Rp.

37,000.00
58,000.00
62,000.00
65,000.00
Jumlah

Rp.
Rp.
Rp.
Rp.
Rp.

148,000.00
696,000.00
74,400.00
13,000.00
1,711,254.05

Rp.
Rp.

17,500.00
27,500.00

= Rp.
= Rp.

70,000.00
1,375.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
555.00
754.00
72,684.00

Rp.
Rp.

15,000.00
27,500.00

= Rp.
= Rp.

16,500.00
2,750.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
925.00
4,350.00
24,525.00

Rp.
Rp.

12,350.00
27,500.00

= Rp.
= Rp.

12,967.50
412.50

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

0.00
0.00
925.00
580.00
14,885.00

Tenaga
4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

38. 1 M PASANG BUBUNGAN ATAP MULTIROOF


Bahan
4.000
Bh
Bubungan Genteng Metal
0.050
Kg
Besi Strip
Tenaga
0.250
Oh
Pekerja
0.150
Oh
Tukang
0.015
Oh
Kepala Tukang
0.013
Oh
Mandor

=
=
=
=

39. 1 M1 PASANG LISPLANK WOOD PLANK


Bahan
1.100
0.100

M1
Kg

Wood Plank
Paku Sekrup
Tenaga

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala Tukang
Mandor

40. 1 M1 PASANG TALANG AIR


1.050
0.015

M1
Kg

0.200
0.400
0.025
0.010

Oh
Oh
Oh
Oh

Bahan
Seng Plat Lebar 30 cm
Paku Sekrup
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

41. 1 M PASANG LIST GYPSUM PROFIL


1.050
0.150

M1
Kg

0.060
0.060
0.006
0.003

Oh
Oh
Oh
Oh

Bahan
List Gypsum Profil
Tepung Gypsum
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

42. 1 M2 PASANG RANGKA PLAFON KAYU KELAS II


Bahan
3
0.0163
Kayu Klas II
M
0.250
Kg
Paku 1" - 2"
Tenaga
0.200
Oh
Pekerja
0.300
Oh
Tukang
0.030
Oh
Kepala Tukang
0.010
Oh
Mandor

Rp.
Rp.

12,300.00
20,000.00

= Rp.
= Rp.

12,915.00
3,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
222.00
174.00
16,311.00

Rp.
Rp.

2,400,000.00
15,000.00

= Rp.
= Rp.

39,120.00
3,750.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
1,110.00
580.00
44,560.00

Rp.
Rp.

85,000.00
27,500.00

= Rp.
= Rp.

31,875.00
825.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
290.00
33,360.00

Rp.
Rp.

70,000.00
27,500.00

= Rp.
= Rp.

26,250.00
825.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
290.00
27,735.00

Rp.
Rp.
Rp.

85,000.00
2,100.00
40,000.00

= Rp.
= Rp.
= Rp.

93,500.00
4,200.00
2,400.00

43. 1 M2 PASANG PLAFON GYPSUM BOARD


0.375
0.030

Lembar
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Bahan
GRC Board 2440 x 1220 x 9 mm
Paku Sekrup
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

44. 1 M2 PASANG PLAFON KALSI BOARD


0.375
0.030

Lembar
Kg

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Bahan
GRC Board 2440 x 1220 x 6 mm
Paku Sekrup
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

45. MEMASANG 1 M1 KUSEN PINTU ALUMINIUM


Bahan
1.100
M1
Profil Aluminum
2.000
Bh
Sekrup Fixer
0.060
Tube
Sealant

0.043
0.043
0.004
0.002

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
159.10
121.80
100,380.90

Rp.
Rp.
Rp.

2,040
121,000
3,076

Rp.
Rp.
Rp.
Rp.
Rp.

29,600
116,000
12,400
2,600
286,716.20

= Rp.
= Rp.
= Rp.

2,880,000.00
18,750.00
19,500.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
66,600.00
17,400.00
3,002,250.00

= Rp.
= Rp.

96,000.00
9,750.00

46. 1 M PASANG BINGKAI JENDELA KAYU Kls. II + Kaca Polos (SNI 3434:2008)

Bahan
0 M
1 Lbr
0 Kg

Kayu Kelas II, Papan


Kaca Bening T= 5 mm
Paku 1/2-1 cm

1
2
0
0

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Rp.
Rp.
Rp.

85,000 =
110,000 =
20,508 =

Tenaga
Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

37,000
58,000
62,000
65,000
Jumlah

47. 1 M MEMBUAT DAN MEMPASANG KUSEN PINTU DAN JENDELA, KAYU KELAS II
Bahan
3
1.200
Balok
Kayu
Rp.
2,400,000.00
M
1.250
Kg
Paku 2,5" - 3,5"
Rp.
15,000.00
1.000
Kg
Lem Kayu
Rp.
19,500.00
Tenaga
6.000
Oh
Pekerja
Rp.
0.00
18.000
Oh
Tukang
Rp.
0.00
1.800
Oh
Kepala Tukang
Rp.
37,000.00
0.300
Oh
Mandor
Rp.
58,000.00
Jumlah
48. M MEMBUAT DAN MEMASANG DAUN PINTU PANEL, KAYU KELAS II
Bahan
0.040
Papan Kayu
Rp.
M3
0.500
Kg
Lem Kayu
Rp.
Tenaga
1.000
Oh
Pekerja
Rp.
3.000
Oh
Tukang
Rp.
0.300
Oh
Kepala Tukang
Rp.
0.050
Oh
Mandor
Rp.

49. 1 M PASANG KACA BENING TEBAL 5 MM


Bahan
1.100
Kaca Bening 5 mm
M2
Tenaga
0.015
Oh
Pekerja
0.150
Oh
Tukang
0.015
Oh
Kepala Tukang
0.00075
Oh
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

2,400,000.00
19,500.00
0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

=
=
=
=

110,000.00 =
0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
11,100.00
2,900.00
119,750.00

Rp.

121,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
555.00
43.50
121,598.50

50. 1 M PASANG KACA BENING TEBAL 8 MM


Bahan
2
1.100
Kaca
Bening
8
mm
M
Tenaga
0.015
Oh
Pekerja
0.150
Oh
Tukang
0.015
Oh
Kepala Tukang
0.00075
Oh
Mandor

Rp.

130,000.00 =

Rp.

143,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
555.00
43.50
143,598.50

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,500.00
19,700.00
17,250.00
17,250.00
15,000.00
6,500.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,825.00
2,955.00
2,932.50
5,175.00
7,500.00
422.50

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
1,258.00
696.00
24,764.00

Rp.
Rp.
Rp.

10,500.00 =
22,750.00 =
15,000.00 =

Rp.
Rp.
Rp.

1,050.00
10,692.50
150.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
148.00
174.00
12,214.50

Rp.

86,250.00 =

Rp.

86,250.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
290.00
86,910.00

51. 1 M PENGECETAN BIDANG KAYU


Bahan
0.170
0.150
0.170
0.300
0.500
0.065

Kg
Kg
Kg
Kg
Ltr
Bh

0.225
0.335
0.034
0.012

Oh
Oh
Oh
Oh

Meni
Plamir Kayu
Cat Kayu ( Dasar )
Cat Kayu ( Penutup 2 x )
Minyak Cat
Kuas
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

52. 1 M PENGECETAN BIDANG TEMBOK DAN PLAFON


Bahan
0.100
Kg
Plamir Tembok
0.470
Kg
Cat Penutup ( Penutup 2 x )
0.010
Bh
Kuas Roll
Tenaga
0.060
Oh
Pekerja
0.040
Oh
Tukang
0.004
Oh
Kepala Tukang
0.003
Oh
Mandor

53. 1 BUAH PASANG KUNCI PINTU 2 SLAGG


1.000

Bh

0.010
0.500
0.010
0.005

Oh
Oh
Oh
Oh

Bahan
Kunci Pintu 2 Slagg
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

=
=
=
=

54. 1 BUAH PASANG ENGSEL PINTU


Bahan
1.000

Bh

Engsel Pintu

Rp.

23,000.00 =

Rp.

23,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
555.00
43.50
23,598.50

Rp.

15,000.00 =

Rp.

15,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
29.00
15,399.00

7,500.00 =

Rp.

7,500.00

Tenaga
0.015
0.150
0.015
0.00075

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala Tukang
Mandor

55. 1 BUAH PASANG ENGSEL JENDELA


1.000

Bh

0.010
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

Bahan
Engsel Jendela
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

56. 1 BUAH PASANG GRENDEL JENDELA


1.000

Bh

0.010
0.100
0.010
0.0005

Oh
Oh
Oh
Oh

Bahan
Grendel Jendela
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

57. 1 BUAH PASANG GRENDEL TANAM PINTU DOUBLE


Bahan
1.000
Bh
Grendel Pintu Double
Tenaga
0.010
Oh
Pekerja
0.100
Oh
Tukang
0.010
Oh
Kepala Tukang
0.0005
Oh
Mandor

58. 1 BUAH PASANG HAK KAIT ANGIN U/ JENDELA BUKA


Bahan
1.000
Bh
Hak Kait Angin
Tenaga
0.015
Oh
Pekerja
0.150
Oh
Tukang
0.015
Oh
Kepala Tukang
0.00075
Oh
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
29.00
7,899.00

Rp.

75,000.00 =

Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
29.00
75,399.00

8,500.00 =

Rp.

8,500.00

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
555.00
43.50
9,098.50

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

59. 1 BUAH PASANG LAMPU TL 2 x 20 WATT


1.000

Bh

0.010
0.100
0.010
0.001

Oh
Oh
Oh
Oh

Bahan
Lampu RM TL 2 x 20 Watt
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Rp.

Rp.

195,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
43.50
195,413.50

90,000.00 =

Rp.

90,000.00

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
43.50
90,413.50

Rp.

60,000.00 =

Rp.

60,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
43.50
60,413.50

Rp.

22,000.00 =

Rp.

22,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
43.50
22,413.50

Rp.

24,500.00 =

Rp.

24,500.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
43.50
24,913.50

Rp.
Rp.
Rp.
Rp.

60. 1 BUAH PASANG LAMPU DOWN LIGHT 18 WATT


Bahan
1.000
Bh
Lampu Down Light 20 Watt(Sistem Fhotoseel)
Rp.
Tenaga
0.010
Oh
Pekerja
Rp.
0.100
Oh
Tukang
Rp.
0.010
Oh
Kepala Tukang
Rp.
0.001
Oh
Mandor
Rp.

61. 1 BUAH PASANG LAMPU DOWN LIGHT 11 WATT


Bahan
1.000
Bh
Lampu Down Light 20 Watt
Tenaga
0.010
Oh
Pekerja
0.100
Oh
Tukang
0.010
Oh
Kepala Tukang
0.001
Oh
Mandor

195,000.00 =
0.00
0.00
37,000.00
58,000.00
Jumlah

62. 1 BUAH PASANG SAKLAR TUNGGAL


1.000

Bh

0.010
0.100
0.010
0.001

Oh
Oh
Oh
Oh

Bahan
Saklar Tunggal
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

63. 1 BUAH PASANG SAKLAR GANDA


1.000

Bh

0.010
0.100
0.010
0.001

Oh
Oh
Oh
Oh

Bahan
Saklar Ganda
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

=
=
=
=

64. 1 BUAH PASANG STOP KONTAK


Bahan
1.000

Bh

Stop kontak

Rp.

23,000.00 =

Rp.

23,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
43.50
23,413.50

Rp.

85,000.00

= Rp.

85,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
43.50
85,413.50

Rp.
Rp.

5,250.00
1,531.25

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
333.00
1,566.00
8,680.25

Tenaga
0.010
0.100
0.010
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala Tukang
Mandor

=
=
=
=

65. 1 BUAH PASANG BOX PANEL


Bahan
1.000

Bh

Box Panel
Tenaga

0.010
0.100
0.010
0.001

Oh
Oh
Oh
Oh

Pekerja
Tukang
Kepala Tukang
Mandor

66. 1 M PASANG PIPA PVC 1/2"


1.200
35.000

M1
%

0.054
0.090
0.009
0.027

Oh
Oh
Oh
Oh

Bahan
PVC 1/2" P = 4 m
Harga Pipa ( Perlengkapan )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,375.00 =
4,375.00 =
0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

67. 1 M PASANG PIPA PVC 3"


1.200
35.000

M1
%

0.081
0.135
0.135
0.004

Oh
Oh
Oh
Oh

Bahan
PVC 3" P = 4 m
Harga Pipa ( Perlengkapan )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

28,750.00
28,750.00

34,500.00
10,062.50

0.00
0.00
37,000.00
58,000.00
Jumlah

Rp.

0.00
0.00
4,995.00
237.80
49,795.30

Rp.
Rp.

33,750.00 =
33,750.00 =

Rp.
Rp.

40,500.00
11,812.50

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
4,995.00
237.80
57,545.30

68. 1 M PASANG PIPA PVC 4"


1.200
35.000

M1
%

0.081
0.135
0.135
0.004

Oh
Oh
Oh
Oh

Bahan
PVC 4" P = 4 m
Harga Pipa ( Perlengkapan )
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

=
=
=
=

69. 1 BUAH CLOSED DUDUK


1.000
6.000

Bh
%

3.300
1.100
0.001
0.016

Oh
Oh
Oh
Oh

Bahan
Closet Jongkok
Perlengkapan
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

Rp.
Rp.

170,000.00 =
170,000.00 =

Rp.
Rp.

170,000.00
10,200.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
37.00
928.00
181,165.00

Rp.

40,000.00 =

Rp.

40,000.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
370.00
290.00
40,660.00

Rp.
Rp.

12,500.00 =
5,500.00 =

Rp.
Rp.

12,500.00
13.75

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
3,700.00
580.00
16,793.75

Rp.
Rp.
Rp.
Rp.
Rp.

1,000.00
1,300.00
120,000.00
2,240.00
15,000.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

45,000.00
71,500.00
19,920.00
138,880.00
69,345.00

Rp.
Rp.
Rp.
Rp.

0.00
0.00
37,000.00
58,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
11,100.00
17,400.00
373,145.00

70. 1 BUAH PASANG FLOOR DRAIN


Bahan
1.000

Bh

Floor Drain
Tenaga

0.010
0.100
0.010
0.005

Oh
Oh
Oh
Oh

Tenaga
Pekerja
Tukang
Kepala Tukang

71. 1 BUAH PASANG KRAN DINDING 1/2" ATAU 3/4"


Bahan
1.000
Bh
Kran Dinding 3/4 "
0.003
Bh
Seal Tape
Tenaga
0.010
Oh
Pekerja
0.005
Oh
Tukang
0.100
Oh
Kepala Tukang
0.010
Oh
Mandor

72. 1 BUAH BAK MANDI BATU BATA


45.000
55.000
0.166
62.000
4.623

Bh
Kg
M3
Bh
Kg

6.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

Bahan
Batu Bata Ukuran
Semen Portland (50 Kg)
Pasir Pasang
Tegel Keramik 20 x 20 cm
Nat / Mortar Flex
Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor

73. 1 M2 PEMASANGAN LAPISAN IJUK TEBAL 10 CM UNTUK BIDANG RESAPAN (0.1 M)


Bahan
6.000
Kg
Ijuk
Rp.
12,500.00 =
Tenaga
0.150
Oh
Pekerja
Rp.
50,000.00 =
0.015
Oh
Mandor
Rp.
70,000.00 =
Jumlah
UNTUK 1 M PASANG LAPISAN IJUK = (ANALISA NO. 68 x 10)

Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.

7,500.00
1,050.00
83,550.00
835,500.00

74. 1 UNIT SEPTICTANK DAN PERESAPAN


Septictank
3.896
0.288
10.860
11.640
11.640
0.221
1.000
1.000

M3
M3
M2
M2
M2
M3
M1
Bh

Galian Tanah
Lantai Beton 1: 3 : 5 T = 5 cm
Pas. 1/2 Bata 1 Pc : 3 Psr
Plesteran 1 Pc : 3 Psr
Acian Semen
Beton Plat Penutup T = 8 cm
PVC 4"
Pipa Penguapan
Peresapan

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,150.00
654,957.02
116,781.00
39,793.80
20,870.00
5,307,900.36
57,545.30
17,500.00

=
=
=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

187,610.46
188,627.62
1,268,241.66
463,199.83
242,926.80
1,174,107.56
57,545.30
17,500.00

1.800
0.630
0.540
0.094
0.180
0.180

M3
M3
M3
M3
M3
M3

Galian Tanah
Lapisan Kerikil
Lapisan Batu Kali
Lapisan Ijuk
Lapisan Pasir
Urugan Kembali

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,150.00
284,250.00
203,730.00
835,500.00
135,700.00
13,060.00
Jumlah

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,670.00
179,077.50
110,014.20
78,202.80
24,426.00
2,350.80
4,080,500.53

Rp.
Rp.
Rp.

3,500.00 = Rp.
1,300.00 = Rp.
120,000.00 = Rp.

87,500.00
18,200.00
3,840.00

75. 1 M2 PASANG DINDING ROSTER 1PC : 3PSR


Bahan
25.000
Bh
Roster Beton 20 x 20 cm
14.000
Kg
Semen Portland (50 Kg)
0.032
Pasir Pasang
M3
Tenaga
0.300
Oh
Pekerja
0.100
Oh
Tukang
0.010
Oh
Kepala Tukang
0.015
Oh
Mandor

Rp.
Rp.
Rp.
Rp.

50,000.00
65,000.00
75,000.00
70,000.00
Jumlah

=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
6,500.00
750.00
1,050.00
132,840.00

DAFTAR HARGA DASAR BAHAN


KEGIATAN
#REF!
LOKASI
#REF!

:
:
:
:

PEMBANGUNAN RUMAH TINGGAL TYPE 45


#REF!
0
#REF!

No

URAIAN

SATUAN

HARGA

KETERANGAN

1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32

Pasir Urug
Pasir Pasang
Sirtu
Kerikil Sungai
Batu Kali / Batu Gunung
Batu Bata Ukuran
Batu Alam
Roster Beton 20 x 20 cm
Semen Portland (50 Kg)
Kayu Klas II
Kayu Terentang / Mall ( Kelas III )
Dolken Kayu Galam 8 - 10 P = 4 m
Ijuk
Besi Beton Polos
Kawat Bendrat
Tegel Keramik 30 x 30 cm
Tegel Keramik 20 x 20 cm
Tegel Keramik 20 x 25 cm
Nat / Mortar Flex
Kuda-kuda Baja Ringan
Seng Gelombang BJLS 20
Seng Plat Lebar 30 cm
Genteng Metal Multiroof
Bubungan Genteng Metal
Wood Plank
Paku Sekrup
Paku Gypsum
List Gypsum Profil
Tepung Gypsum
GRC Board 2440 x 1220 x 6 mm
GRC Board 2440 x 1220 x 9 mm
Paku 1" - 2"

M
M3
3
M
M3
3
M
Bh
M2
Bh
Zak
3

M
M3
Btg
Kg
Kg
Kg
Dos
Dos
Dos
Kg
M2
Lembar
M1
Lembar
Bh
M1
Kg
Kg
M1
Kg
Lembar
Lembar
Kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
120,000.00
90,000.00
225,000.00
135,000.00
1,000.00
150,000.00
3,500.00
65,000.00
2,400,000.00
1,700,000.00
15,000.00
12,500.00
10,000.00
20,000.00
60,000.00
56,000.00
58,000.00
15,000.00
140,000.00
48,000.00
12,350.00
52,500.00
17,500.00
15,000.00
27,500.00
27,500.00
12,300.00
20,000.00
70,000.00
85,000.00
15,000.00

1,300.00 /kg

10,000.00 /bh
2,240.00 /bh
2,900.00 /bh

1
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
68
69
70
71

2
Paku 2,5" - 3,5"
Kaca Bening 5 mm
Kaca Bening 8 mm
Kunci Pintu 2 Slagg
Engsel Pintu
Engsel Jendela
Grendel Jendela
Grendel Pintu Double
Hak Kait Angin
Minyak Cat
Meni
Plamir Kayu
Lem Kayu
Cat Kayu
Kuas
Plamir Tembok
Cat Tembok
Kuas Roll
Minyak Bekisting
Closet Jongkok
Floor Drain
Kran Dinding 3/4 "
Seal Tape
PVC 1/2" P = 4 m
PVC 3/4" P = 4 m
PVC 3" P = 4 m
PVC 4" P = 4 m
Pipa Penguapan
Profil Aluminum
Sekrup Fixer
Sealant
Instalasi Titik Lampu
Instalasi Stop Kontak
Lampu RM TL 2 x 20 Watt
Lampu Down Light 20 Watt(Sistem Fhotoseel)
Lampu Down Light 20 Watt
Saklar Tunggal
Saklar Ganda
Stop kontak
Box Panel

3
Kg
2

M
2
M
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Bh
Kg
Kg
Bh
Ltr
Bh
Bh
Bh
Bh
Btg
Btg
Btg
Btg
Bh
M1
Bh
Tube
Ttk
Ttk
Bh
Bh
Bh
Bh
Bh
Bh
Bh

4
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
110,000.00
130,000.00
86,250.00
23,000.00
15,000.00
7,500.00
75,000.00
8,500.00
15,000.00
22,500.00
19,700.00
19,500.00
17,250.00
6,500.00
10,500.00
22,750.00
15,000.00
17,250.00
170,000.00
40,000.00
12,500.00
5,500.00
17,500.00
21,000.00
115,000.00
135,000.00
17,500.00
85,000.00
2,100.00
40,000.00
135,000.00
135,000.00
195,000.00
90,000.00
60,000.00
22,000.00
24,500.00
23,000.00
85,000.00

4,375.00
5,250.00
28,750.00
33,750.00

/btg
/btg
/btg
/btg

DAFTAR HARGA DASAR UPAH


KEGIATAN
LOKASI

: PEMBANGUNAN RUMAH TINGGAL TYPE 45


:
-

NO.

TENAGA

UPAH

SATUAN

1
2
3
4

Pekerja
Tukang Batu / Kayu / Besi
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp

50,000.00
65,000.00
75,000.00
70,000.00

Org/Hari
Org/Hari
Org/Hari
Org/Hari

100,000.0

120,000.0

90,000.0

225,000.0

135,000.0

1,000.0

150,000.0

3,500.0

65,000.0

2,400,000.0

1,700,000.0

15,000.0

12,500.0

1.0

10,000.0

1.0

20,000.0

60,000.0

56,000.0

58,000.0

15,000.0

140,000.0

48,000.0

12,350.0

52,500.0

17,500.0

15,000.0

27,500.0

27,500.0

12,300.0

20,000.0

70,000.0

85,000.0

15,000.0

15,000.0

110,000.0

130,000.0

86,250.0

23,000.0

15,000.0

7,500.0

75,000.0

8,500.0

15,000.0

22,500.0

19,700.0

19,500.0

17,250.0

6,500.0

10,500.0

22,750.0

15,000.0

17,250.0

170,000.0

40,000.0

12,500.0

5,500.0

17,500.0

21,000.0

115,000.0

135,000.0

17,500.0

85,000.0

2,100.0

40,000.0

115,000.0

115,000.0

195,000.0

90,000.0

60,000.0

22,000.0

24,500.0

23,000.0

85,000.0

Enter the amont

#REF!

#REF!
ratus trilyun

In words

rupiah

Rab

15
ratus trilyun

14
-

puluh trilyun

13

11

10

trilyun
ratus milyardpuluh milyard

milyar

ratus juta

12
-

8
-

puluh juta

juta ratus ribu puluh ribu

ribu

ratus

puluh

6
-

1
-

rupiah
rupiah

PEMBERIHAN
PENGUKURAN
PANJANG PONDASI

18

X
8
8
1.2
4
3
8
3
4

Y
18
4
5.5
4
3
1.5
18

39.2

P1

JMLH
3.000

P2
P3
J1
J2
J3
J4
J5
J6
V1
V2
V3
V4

9.000
3.000
2.000
6.000
1.000
1.000
6.000
1.000
3.000
9.000
1.000
2.000

54

231
60

93.2
76

KUSEN
KAYU ALUM
18.72
49.86
16.32

GALIAN
UR. PSR. PON
PAS. BA. KOS
PAS. BA. KALI
TIMBN. LANT
PSR. BWH LANT
COR LANTAI
COR CARPOT
SLOOF 15/20
KOLOM 15/15
KOLOM 15/30
RING BALOK 15/20

37.28
3.728
11.184
29.358
77
30.86
9.258
6.172
4.9041
2.4232
1.2771
0.2985
97.2

PLAT BTON
SUNSCREE
BALOK 15/15

2.4752 0.4725
2.16
9.6

P
10.789

JB

28.8 16.384
4.7952
25.6
45.8
12.5
17.5
75.2
7.6
9.6
47.7
15.4
25.0

KUNCI
ENSEL PINTU
ENSEL JENDEL

15.000
54.000
34.000

8.986

21.622

3.744
0.312
1.5252

21.542 12.352

310.76
31.968
33.973
37.310

96.000

VB
2.4648

9.984
6.398
2.064
3.096

11.664
0.972

GRENDEL PINTU
62

40.6

4.3056

84.9
0.978

KUSEN KAYU
KUSEN ALUM
PINTU PANIL
JENDELA, VENTILASI BUKA ALUMINI
JENDELA, VENTILASI MTI

JM

2.048
0.128
0.512
0.4648
20
6.4
0.2028
0.1352
2.7463

PENGECTAN KUSEN PINTU

pembesian kolom 20/20


4D12
4D10
D8 - 15

25.000
0.888
0.617
0.395

100.000
88.776
61.650
59.302
209.728

166.67
150.3

pembesian kolom 15/15


4D12
D8 - 15

44.444
0.888
0.395

177.778
157.824
44.191
202.01

222.22
112

pembsian balok 15/20


4D12
D8 - 15

33.333
0.888
0.395

pembsian sloof 15/20


4D12
D8 - 20

33.333
0.888
0.395

133.333
166.67
118.368
100.8
39.772 39.772
158.140
166.67
100.8
133.333 166.667
168
118.368 100.80
39.772
158.140

pembsian balok 15/15


4D10
D8 - 20

44.444
0.617
0.222

PLAT 12/100
D12

8.333
0.888
1.000
0.888

177.778 222.222
109.600 134.40
29.829
139.429

224

55.556

57

6.667
59.184 66.667
109.786

50.60

7.3333
219.57264 164.68

39.328
3.856
11.696
29.823

ATAP
BUBUN
GYPSUM
KALSIBO
LI PROFL
LISPLAK
TALANG

6.2976 43.5576
9.4608
6.3072

KERMIK LANTAI
KERAMIK WC
1.2771 DINDING WC

1.2771
137.8

0.29
9.6

0.866 107.5 107.5


8.8
200
91
91.46
88.2 36.54 124.7
99.58
7
7

3.5828
0
3.5828
3.2377

87
4.8
17.4

PAS.DINDIN
PAS.DINDIN

304
41

PLSTR POND
DINDING TAMAN

51

82
17.4
304 180.608
20.5
30.6
7.350

9.500

0.16224
GALIAN
60.60 14.54
PAS.
60.60
PLESTERN
112.1
URG PASR
1.06
COR SALU
1.48
3.64
URG PASR
COR KELILIG
4.24

VM

3.8688
0.624
0.9672
BATU ALAM

12.00 12.15

PLESERAN CIPRAT

34.02

0.36
4.432
5.876

PIPA 2"
PIPA 3"
PIPA 4"

42.75
39.85
26.50

15.768
PARTISI KACA
102.892

33.96 63.936

97.896

21

1.600

50.45

0.76
8.64
9.4

159.608

167

18

224

7.5

13.33
27
9

168

18.3333333

46

66
17
5.67

168
39.77 100.8

168
13.3333

#REF!
132

17.7778

#REF!
132

7.33333
8.33333

192.13

I.
1
2

PEKERJAAN PERSIAPAN
Pek. Pembersihan Lokasi
Pek. Pengukuran dan Pemasangn Bowplank

II.
1

PEKERJAAN TANAH DAN PASIR


Pek. Galian Tanah Pondasi

Pondasi A

2
3

Pek. Urugan Tanah Bekas Galian


Pek. Urugan Pasir Dibawah Pondasi

Pondasi A

4
5
6

Pek. Urugan Sirtu Dibawah Lantai


Pek. Pemadatan Urugan Sirtu
Pek. Urugan Pasir Dibawah Lantai

III.
1

PEKERJAAN PASANGAN
Pek. Pasangan Batu Kosong

Pondasi A

Pek. Pasangan Pondasi Batu Kali 1 : 5

Pondasi A

3
4

Pek. Pas. Dinding Batu Bata 1 : 3


Pek. Pas. Dinding Batu Bata 1 : 5

Pek. Plesteran Dinding Batu Bata 1 : 5

6
7
8
9

Pek. Acian Dinding, Pondasi


Pek. Pas. Dinding Keramik 20 x 25 cm WC
Pek. Pas. Lantai Keramik 20 x 20 cm
Pek. Pas. Lantai Keramik 40 x 40 cm

1
IV.
1
2
3
4

2
PEKERJAAN BETON
Pek. Cor Beton 1 : 3 : 5 (Cor Lantai)
Pek. Sloof Beton Bertulang
Pek. Kolom Beton Bertulang
Pek. Balok Beton Bertulang

Pek. Plat Atap Beton Bertulang T = 8 cm

V.
1

PEKERJAAN KUSEN PINTU, JENDELA, VENTILASI


Pek. Kusen Pintu, Jendela, Roster, Kayu Kelas II

2
3

Pek. Pintu Panil Kayu Kelas II


Pek. Jendela, Ventilasi Kaca Bening Buka 5 mm

VI.
1

PEKERJAAN KAP, ATAP DAN PLAFOND


Pek. Kuda-kuda Baja Ringan

2
3
4
5
6
7
8

Pek. Atap Genteng Metal Multiroof


Pek. Bubungan Atap Multiroof
Pek. Rangka Plafond Kayu Kelas II
Pek. Plafond GRC Board T = 6 mm (Area Luar)
Pek. List Profil Gypsum
Pek. Lisplank Wood Plank
Pek. Talang Atap

VII.
1
2
3
4

PEKERJAAN PENGECETAN
Pek. Pengecetan Dinding Tembok
Pek. Pengecetan Plafond
Pek. Pengecetan Kusen, Pintu Kayu
Pek. Pengecetan Lisplank

VIII.
1
2
3
4
5

PEKERJAAN ALAT PENGGANTUNG


Pek. Pas. Kunci Pintu
Pek. Pas. Engsel Pintu
Pek. Pas. Engsel Jendela
Pek. Pas. Haq Angin
Pek. Pas. Grendel Jendela

1
IX.
1
2

2
PEKERJAAN INSTALASI LISTRIK
Pek. Pas. Instalasi Titik Mata Lampu + Kabel NYY 2,5
Pek. Pas. Instalasi Titik Stop Kontak + Kabel NYY 2,5

P1
J1
J2
J3
V

3
4
5
6
7
8
9
10

Pek. Pas. Lampu RM TL 2 x 20 Watt


Pek. Pas. Lampu DL 20 Watt (Sistem Fhotosheel)
Pek. Pas. Lampu DL 20 Watt
Pek. Pas. Stop Kontak
Pek. Pas. Saklar Tunggal
Pek. Pas. Saklar Ganda
Pek. Pas. Panel Box
Pek. Pas. Daya Listrik 1200 Watt

X.
1
2
3
4
5
6
7
8
9

PEKERJAAN SANITASI
Pek. Pasangan Closet Duduk INA
Pek. Kran Dinding
Pek. Floor Drain
Pek. Bak Kamar Mandi
Pek. Pipa Air Bersih PVC 1/2"
Pek. Pipa Air/Kotoran PVC 3"
Pek. Pipa Air/Kotoran PVC 4"
Pek. Septic Tank + Peresapan
Pek. Pas. Pompa Air

XII.
1

PEKERJAAN AKHIR
Pek. Pembersihan Akhir

20
38

9
16

60.25

0.4

60.25

180.00 M2
54.00 M1

0.35

0.4

0.05

47.25

0.3

47.25

0.09

60.25

0.4

60.25

0.1
0.15125

5.45
60.25

1.5
4

5.45
1.5

1.5
1.75
47.25

47.25
60.25
4.3
60.25

VOL

0.15
0.15
0.15

0.1
0.2
0.15
0.15

8.435
8.435
2.109
1.205
1.205
14.175
14.175
4.253

m3
m3
m3
m3
m3
m3

2.410
2.410 m3
9.113
9.113 m3
8.175 M2
180.750
180.750
361.500
361.500
8.175 M2
2.625 M2
47.250 M2

4.725
1.808
1.742
1.356

M3
M3
M3
M3

Lubang
0.000

7.6

0.608 M3

59.500
59.500 M2
5.800 M1

5.8
47.250
47.250
14.9

47.250
14.900

361.500
47.250
0
14.9

0.25

3.725