LoadingTest R
CONSTRUCTION PROJECT
2014/12/15
Rupsa Bridge
Main Bridge
Prestressed Concrete 7 Span Continuous Box Girder
: 70 m + 5 @ 100 m +70 m = 640 m
West and East Approach Bridges
Prestressed Concrete Simple I - Girders
: 2 - 12 @ 30 m = 2 - 360 m = 720 m
Pier Protections on the River Rupsa
Total length of Rupsa Bridge : 1,360 m
2014/12/15
2014/12/15
2014/12/15
Protection Pile
2014/12/15
Pier Pile
Casing
Drilling Bit
Piling Works
2014/12/15
Reinforcing Cage
River
Sand
Clay
Silt
10
2014/12/15
11
2014/12/15
12
550
1100
1650
2200
2750
3300
3850
0
50
100
150
Settlement (mm)
200
250
300
350
400
PLT No.1
450
500
550
600
650
2014/12/15
13
Shaft Grout
2014/12/15
Skin Grout
14
-3000
-2500
-2000
-1500
-1000
-500
0
-20
-25
Test Load
-30
-35
-40
Depth
Elevation (m)
3,100 ton
-45
2,700 ton
-50
-55
3,200 ton
-60
-65
-70
-75
-80
Load (ton)
15
2014/12/15
16
2014/12/15
17
2014/12/15
18
2014/12/15
19
Shaft Grout
Shaft Grout
Shaft Grout
Shaft Grout
2014/12/15
20