Electrified Double Track Project Between Rawang and Ipoh: Offset: Tested by

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

ELECTRIFIED DOUBLE TRACK PROJECT

BETWEEN RAWANG AND IPOH

FM - CONS - (S1/ S2/ S3) - 030 - Rev. 1

SERIAL NO.-(S1/S2/S3)-MP

MACKINTOSH PROBE
Offset :

Tested by :

Date Tested :
Test No. :
Sector/ Package :
Location/ Chainage :
Purpose of Test :
Reduced Level :

Depth
(m)

Time :

Position No.
Number of Blows per 0.3 meter
MP.
MP.
MP.

0.0 - 0.3
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
1.2 - 1.5
1.5 - 1.8
1.8 - 2.1
2.1 - 2.4
2.4 - 2.7
2.7 - 3.0
3.0 - 3.3
3.3 - 3.6
3.6 - 3.9
3.9 - 4.2
4.2 - 4.5
4.5 - 4.8
4.8 - 5.1
5.1 - 5.4
5.4 - 5.7
5.7 - 6.0
6.0 - 6.3
6.3 - 6.6
6.6 - 6.9
6.9 - 7.2
7.2 - 7.5
7.5 - 7.8
7.8 - 8.1
8.1 - 8.4
8.4 - 8.7
8.7 - 9.0
9.0 - 9.3
9.3 - 9.6
9.6 - 9.9
9.9 - 10.2
10.2 - 10.5
10.5 - 10.8

Depth
(m)

Position No.
Number of Blows per 0.3 meter.
MP.
MP.
MP.

0.0 - 0.3
0.3 - 0.6
0.6 - 0.9
0.9 - 1.2
1.2 - 1.5
1.5 - 1.8
1.8 - 2.1
2.1 - 2.4
2.4 - 2.7
2.7 - 3.0
3.0 - 3.3
3.3 - 3.6
3.6 - 3.9
3.9 - 4.2
4.2 - 4.5
4.5 - 4.8
4.8 - 5.1
5.1 - 5.4
5.4 - 5.7
5.7 - 6.0
6.0 - 6.3
6.3 - 6.6
6.6 - 6.9
6.9 - 7.2
7.2 - 7.5
7.5 - 7.8
7.8 - 8.1
8.1 - 8.4
8.4 - 8.7
8.7 - 9.0
9.0 - 9.3
9.3 - 9.6
9.6 - 9.9
9.9 - 10.2
10.2 - 10.5
10.5 - 10.8

Note :

When probe sinks under weight of hammer record 0 blows;


count number of blows to next depth increment and record.
INSPECTED BY: CONTRACTOR Rep.

APPROVED/ VERIFIED BY : S.E Rep

Name & Date :


Time :

Name & Date :


Time :

You might also like