Networking Presentation 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Waxahachie Global High School

Networking Proposal
Ira Mascardo
Penelope Cox
Shay Townson
Telecommunications & Networking
12.03.14

Floor Plan:
First Floor

Floor Plan:
Second Floor

Floor Plan:
Third Floor

Materials List
Materials required to re-wire the Waxahachie Global High School campus:

1,814.48 ft of RJ-45 STP Cat5e cable


1,648.26 ft of fiber-optic cable
34 media converters
31 switch 6 ports
3 switch 40 ports

Cost of Materials and Installation

Network Capabilities

Current capability

Approximately 250-300 computers

Does not include devices connecting wirelessly

Future capability

Fiber-optic cable can support 1460 nodes (given the server has enough
room)

Conclusion
Thank you for listening!

You might also like