COAL FIRED BOILER FOUNDATION, CONTROL ROOM, COAL ROOM & COAL PLATFORM
S.No.
Description
Quantity.
Unit.
Rate
Amount
CIVIL WORKS
Excavation.
1
a.
102.00
cu.m.
241.00
24,582.00
b.
47.00
cu.m.
265.00
12,455.00
15.00
cu.m.
530.00
7,950.00
32.00
sq.m.
217.00
6,944.00
131.00
sq.m.
313.00
41,003.00
b.
c.
21.00
sq.m.
313.00
6,573.00
d.
66.00
sq.m.
313.00
20,658.00
50,624.00
7.00
M.Ton.
7,232.00
b.
0.00
M.Ton.
7,232.00
Column foundations.
23.00
cu.m.
779.00
17,917.00
b.
28.00
cu.m.
820.00
22,960.00
c.
2.00
cu.m.
849.00
1,698.00
d.
8.00
cu.m.
849.00
6,792.00
345mm thick.
31.00
sq.m.
205.00
6,355.00
b.
230mm thick.
87.00
sq.m.
213.00
18,531.00
10.00
sq.m.
123.00
1,230.00
sq.m.
213.00
22,152.00
a.
230mm thick.
109.00
sq.m.
107.00
11,663.00
10
18.00
sq.m.
144.00
2,592.00
11
83.00
sq.m.
107.00
8,881.00
12
5.00
sq.m.
574.00
2,870.00
13
3.00
sq.m.
820.00
2,460.00
14
295.00
cu.m.
164.00
48,380.00
15
58.00
sq.m.
184.00
10,672.00
16
28.00 sq.m.
282.00
7,896.00
17
34.00
241.00
8,194.00
19
Apply S. P. D.
20
sq.m.
437.00
sq.m.
75.00
32,775.00
66.00
sq.m.
212.00
13,992.00
143.00
sq.m.
62.00
8,866.00
21.00
sq.m.
66.00
1,386.00
429,051.00
429,051.00
Rate
Unit
Quantity
M.ton
7.00
Kg.
70.00
Cement
Bags
639.00
Bricks
Nos.
77,184.00
Brick Tiles
Nos.
2,652.00
Cu.ft.
1,084.00
Local Sand
Cu.ft.
2,402.00
Crush
Cu.ft.
2,950.00
Kassu
Cu.ft.
12,502.00
Sq.ft.
54.00
Louv. Vent.
Sq.ft.
32.00
SPD Paint
4.00 Kg.
9.00
Enamel Paint
3.64 ltr.
1.00
Paint Primer.
Sq.ft.
226.00
Sq.ft.
1,765.00
Binding Wire
Bitumen 10/20
Kg.
144.00
Bitumen 80/100
Kg.
69.00
Polythene
Kg.
13.00
Sq.ft.
818.00
Cu.ft.
178.00
Cu.ft.
1.00
Material Cost