FAZAL REHMAN FABRICS LIMITED (EXTENSION)

Rev. 'A' Feb. 25, 2014

COAL FIRED BOILER FOUNDATION, CONTROL ROOM, COAL ROOM & COAL PLATFORM

S.No.

Description

Feb. 24, 2014

Quantity.

Unit.

Rate

Amount

CIVIL WORKS
Excavation.
1

a.

Upto 1500mm depth i.c. backfill/disposal.

102.00

cu.m.

241.00

24,582.00

b.

Below 1500mm depth i.c. backfill/disposal.

47.00

cu.m.

265.00

12,455.00

15.00

cu.m.

530.00

7,950.00

32.00

sq.m.

217.00

6,944.00

131.00

sq.m.

313.00

41,003.00

C.C. 1:4:8 in foundations.

Arrange,fabricate and fix formwork:


a.

Column foundation,ducts & trenches bases


bases and walls. (Ordinary).

b.

Walls of boiler foundation (Fair face finish).

c.

Roof Beams (Fair face).

21.00

sq.m.

313.00

6,573.00

d.

Slab, Projection & Pardi (Fair face finish).

66.00

sq.m.

313.00

20,658.00
50,624.00

Fixing of steel reinforcement.


a.

Deformed steel bars.

7.00

M.Ton.

7,232.00

b.

Mild steel bars.

0.00

M.Ton.

7,232.00

Mix & place 1:2:4 in:


a.

Column foundations.

23.00

cu.m.

779.00

17,917.00

b.

Walls of boiler foundation.

28.00

cu.m.

820.00

22,960.00

c.

Beams, lintels, air washer walls.

2.00

cu.m.

849.00

1,698.00

d.

Slab, projection and pardi.

8.00

cu.m.

849.00

6,792.00

Lay solid brick masonry upto FFL.


a.

345mm thick.

31.00

sq.m.

205.00

6,355.00

b.

230mm thick.

87.00

sq.m.

213.00

18,531.00

10.00

sq.m.

123.00

1,230.00

Lay 40mm thick D.P.C.

Lay solid brick masonry above FFL.


104.00

sq.m.

213.00

22,152.00

a.

Mix and apply 20mm thick internal plaster.

230mm thick.

109.00

sq.m.

107.00

11,663.00

10

Mix and apply 20mm thick external plaster.

18.00

sq.m.

144.00

2,592.00

11

Mix & apply deep groove pointing.

83.00

sq.m.

107.00

8,881.00

12

Fix steel hinged shutter door.

5.00

sq.m.

574.00

2,870.00

13

Fix steel windows / ventilators.

3.00

sq.m.

820.00

2,460.00

14

S/C in plinth approved fill material.

295.00

cu.m.

164.00

48,380.00

15

Mix & lay 1:4:8 sub floor 150mm. thick

58.00

sq.m.

184.00

10,672.00

16

Mix, place and finish smooth 100mm 1:2:4 floor.

28.00 sq.m.

282.00

7,896.00

17

Mix & place and finish smooth 65mm 1:1:3.

34.00

241.00

8,194.00

Laying 115mm thick brick on edge sand grouting


18

Waterproofing with Jute felt+mud+tile

19

Apply S. P. D.

20

Apply enamel paint to doors


TOTAL ESTIMATED COST OF CIVIL WORKS.

sq.m.

437.00

sq.m.

75.00

32,775.00

66.00

sq.m.

212.00

13,992.00

143.00

sq.m.

62.00

8,866.00

21.00

sq.m.

66.00

1,386.00
429,051.00

429,051.00

FAZAL REHMAN FABRICS LIMITED (EXTENSION)

Rev. 'A' Feb. 25, 2014


COAL FIRED BOILER FOUNDATION, CONTROL ROOM, COAL ROOM & COAL PLATFORM

STATEMENT SHOWING BREAKDOWN OF MATERIALS REQUIRED FOR CONSTRUCTION


Material
Tor Steel

Rate

Unit

Quantity

M.ton

7.00

Kg.

70.00

Cement

Bags

639.00

Bricks

Nos.

77,184.00

Brick Tiles

Nos.

2,652.00

Sakhi Srawar Sand

Cu.ft.

1,084.00

Local Sand

Cu.ft.

2,402.00

Crush

Cu.ft.

2,950.00

Kassu

Cu.ft.

12,502.00

Steel hinged shutter door

Sq.ft.

54.00

Louv. Vent.

Sq.ft.

32.00

SPD Paint

4.00 Kg.

9.00

Enamel Paint

3.64 ltr.

1.00

Paint Primer.

Sq.ft.

226.00

Paint Filling Material

Sq.ft.

1,765.00

Binding Wire

Bitumen 10/20

Kg.

144.00

Bitumen 80/100

Kg.

69.00

Polythene

Kg.

13.00

Jutoid felt 70lbs.

Sq.ft.

818.00

Earth for insulation over roof.

Cu.ft.

178.00

Red oxide powder

Cu.ft.

1.00

Misc. & Others 10% of total cost