The document discusses optimizing the pipe spooling process at L&T Power's piping facility in Hazira, India. It notes that timely delivery of pipe spools is important but current processes face interruptions and low productivity. Studying the facility and proposing process changes considering relevant factors could help optimize the process and increase production rates. As the largest pipe spooling facility in South Asia, improvements would benefit a key facility for the company.
The document discusses optimizing the pipe spooling process at L&T Power's piping facility in Hazira, India. It notes that timely delivery of pipe spools is important but current processes face interruptions and low productivity. Studying the facility and proposing process changes considering relevant factors could help optimize the process and increase production rates. As the largest pipe spooling facility in South Asia, improvements would benefit a key facility for the company.
The document discusses optimizing the pipe spooling process at L&T Power's piping facility in Hazira, India. It notes that timely delivery of pipe spools is important but current processes face interruptions and low productivity. Studying the facility and proposing process changes considering relevant factors could help optimize the process and increase production rates. As the largest pipe spooling facility in South Asia, improvements would benefit a key facility for the company.
The document discusses optimizing the pipe spooling process at L&T Power's piping facility in Hazira, India. It notes that timely delivery of pipe spools is important but current processes face interruptions and low productivity. Studying the facility and proposing process changes considering relevant factors could help optimize the process and increase production rates. As the largest pipe spooling facility in South Asia, improvements would benefit a key facility for the company.
yard and installation site is important. However, studies showed that pipe spool fabrication shops are faced with various interruptions and often not operating at an optimal productivity. Hence studying a piping facility and proposing changes to the process by considering the relevant factors can help in optimizing it and increasing the production rate. RELEVANCE: L&T Powers Piping Center at Hazira is the largest Pipe Spooling facility in South Asia. We believe this case study will help in optimizing a key facility in Our Company.
Green Building Why
To study and explore the scope of Green Building concept
How
Protecting land by using flyash bricks instead of standard red
brick and introduction of multilevel parking. Conservation of water resource by Greywater Recycling, percolating wells and rainwater harvesting. Conservation of electricity by use of sandwich wall panels, double glazed aluminum windows
Relevance
L&T is 4th around the globe in Green Building construction.