their indicated 1 million tonnes per year (m tpy) is only about 63% of our
expected requirement @ 3000 tonnes per day (tpd) cement, limestone = 1.584 m
tpy.
We will need THREE drills to work simultaneously at THREE areas in order to
achieve the required chemistry.
As these drills come with the compressor-engine, this should to be taken into
account when comparing cost with separate providers.
The overburden does not require blasting? The geologists logs indicate no
such possibility.
there is one response from Sandvik being replied to u in a separate mail. this is
Hausher's. may we inquire if u got no response from Ingersol Rand and/or Atlascopco..
Suggested response to Hausher's queries, please.
Haushers queries
Our Response
1.)
15-30 meters
2.)
104 milimeters
3.)
by
attached
three most
/ blasted?
Please describe the geological
Notes on Physiography,
detailed!
attached
Sorry. No photos.
attached
dewatering holes?
4.)
material (limestone,
5.)
Regards,
Zulfiqar Haider
Manager Mining
Mid 2015