Professional Documents
Culture Documents
Unit Testing / User Manual Production Planning
Unit Testing / User Manual Production Planning
ENVIRONMENT
SYSTEM
CLIENT
: 200
: BPML PP - 13
DESCRIPTION
: Bill of Material
PREPARED BY
NAME
: ASJ
DATE
: 01/01/2009
TEAM
: Production Planning
DATE
TEAM
: Production Planning
Page 1 of 11
T.Code
CS01
2. Input Data
1. Before creating BOM, ensure all materials available in material master of your plant.
2. Bill of material number ( Header ) & Child parts of Header should be entered in material
master with T code MM01 as per plant requirement.
3. For following material we have to create BOM,
- ZFRT ( Finish Product )
- ZSFG ( Semi finished Product ) : Sub Assemblies Or Having raw material as child part.
- ZSRP ( Spare Parts ) : Sub Assemblies Or Having raw material as child part.
NOTE: TO CREATE A RELATION OF MATERIAL BOM MODULE IS USED IN SAP.
IN SAP BOM MASTER IS CREATED & MAINTAINED PLANT WISE.
2.1
Page 2 of 11
Page 3 of 11
- Alternative BOM :
This provision is given to create production version for same header material.
If nothing is entered, by default system is generating alternative 1.
NOTE : If second time bom is open with CS01 system will create alternative
2 for
same Header material.
Steps for creating production versions :
For same header material create different alternative BOMs & create relation of all
alternative BOMs ( Production Version ) in MRP4 view of material master.
-
Change Number : If ECN is released to change the BOM, ECN number to be entered
in change number. After ECN number system will give valid date & next revision level
for BOM.
Description of
the Field
Material
BOM Usage
Plant
Tab
2.2
Input Screen Name Create Material: Overview
Screen 1:
Page 4 of 11
Description of
the Field
Base Quantity
Nature of
the Field
Mandatory
BOM text
Alt Text.
BOM Status
Authorisation
Group
Mandatory
01
Not to be used.
Tab
Page 5 of 11
Description
of the Field
Nature of
the Field
Item
ICT
Mandatory
Component
Mandatory
Quantity
Mandatory
After component entry if you press enter, system will open given below window to enter quantity of
component.
Page 6 of 11
Description of Nature of
the Field
the Field
Quantity
Mandatory
Fixed Qty.
Operation
Scrap
Component
Scrap
Net ID
Co-Product
Alternative
Group
Priority
Mandatory
for alt item
Strategy
Mandatory
for alt item
Usage Prob.
Mandatory
for alt item
MRP Data
Page 7 of 11
For Rework / Conversion BOM, separate Prod. Stor. Location will be defined for negative qty
marked Components, so that track could be kept for transactions done with these type of
Confirmation.
Basic data:
Page 8 of 11
Description of the
Field
Line 1
Line 2
Spares part indicator
Costing Relevancy
Material Provision
Indicator
Bulk Material
Production stork.
location
Supply Area
Nature of the
Field
Page 9 of 11
After completion of all entries, click on save button to save the document.
COPY OPTION :
If BOM is already available in different plant, use COPY FROM icon to transfer / copy BOM
contents in required branch plant.
Page 10 of 11
Page 11 of 11