Czech Technical University in Prague

Department of Microenvironmental and Building Services Engineering


http://tzb.fsv.cvut.cz
125BEE2 Ventilation, MK
Air handling unit design

TE

TI

Example:
Air handling unit design (summer + winter)
Office room max 40 person (no smoking), room-south wall 20m, west wall 20m, height 3,5m
Heat loss: 10 W/m3,
Heat gains:
south windows 20m2, internal blind, electrical equipments 4kW
(Calculation without moisture production)
Air parameters:
Winter
Te=-12C, rh=80%
Ti=20C, rh=60%
Summer
Te=30C, rh=40%
Ti=26C, rh=60%
Calculation:
Heat loss:
QL=15*20*3,5*10= 10,5kW
Heat gains:
External
QGE=20*185=3,7kW
QGEwall=50*10=0,5kW
Internal
QI PERSON=40*150=6kW
QI ELECTRICAL=4kW
QG=3,7+0,5+6+4=14,2kW

Czech Technical University in Prague


Department of Microenvironmental and Building Services Engineering
http://tzb.fsv.cvut.cz
125BEE2 Ventilation, MK
Summer
Summer dT=5C = supply air T=26-5=21C
Supply air flow VSA in accord with Gains:
Q
VSA =
=14200 / (1010*1,2*5)=2,343m3/s=8436m3/h
c. .T
Voutside air in accord with Persons:
VOA=40*50=2000m3/h
Recirculated air
VCA=8436-2000=6436m3/h
Winter
Supply air temperature TSA
QLOSS
TSA =
+ T =(10500 / (2,343*1,2*1010))+20=23,7 => 24C
(VSA . SA .c ) I
Air preheating
TE1=5C
QH 1 = VOA . .c.(TE1 TE ) =0,556*1,2*1010*(5+12)=11,5kW
or
Energy recovery
TSA = TE + (TI TE ) .
TSA=-12+(20+12)*0,7=10,4C
Mixing
T .V + T .V
Tmix = I CA E1 OA =(20*6436+5*2000) / (6436+2000)=16,44 =>16,5C
VCA + VOA
Air heating
QH 2 = VOA . .c. (TSA TMIX ) =2,343*1,2*1010*(24-16,5)=21,5kW

Czech Technical University in Prague


Department of Microenvironmental and Building Services Engineering
http://tzb.fsv.cvut.cz
125BEE2 Ventilation, MK
Moisture production (persons):
Mw=m*n=116*40=4640g/h=4,64kg/h
Air moisture change :
M
x =
=6960 / (1,2*8436)=0,69 g/kg
.VSA