Both station transformers 3 &4 tripped.

Following actions to be taken:


S
NO
1
2
3

In unit 3 &4

Actions to be taken

Remarks

Charge ECW TANK with fire


water
Charge seal trough with
fire water
Close Hot well DM make up
valves

As ST # II,DM make up pumps


trip
As BALP trips
To avoid condenser make up
line taking air as DM make up
pumps trip

Shift APRDS Supply to


stage I
Stop CW Blow down pumps
to maintain CW level
Start standby IAC/PAC

Watch condenser vacuum

Inform Ash handling plant


to close Bottom ash hopper
gates
Isolate ECO Hoppers of
As Service water p/ps trips
u#3&4
Monitor ECW Temp & start
As CLCW inlet temp increases
CLCW Pumps if required
due to
any CT fans tripping
Check GT/UATs Fan/oil
pumps running healthiness
Close 6.6 kv breaker no:
For charging SF 1 bus/SE 1
6281(SB1 Bus) from u#1
bus/OCC
after clearing fault of ST#3

9
10

11
12

As CW Makeup pumps trips


As ST#3 IAC/PAC trips (ARCW
MCC fails)
As 9 ct fans each in u#3 &
u#4 trips if CT MCC 3&4 Bus
coupler did not close in auto.
Close manually
As BAHP trips

13

14

tripping.
Close 6.6 kv breaker no:
6288(SA2 Bus) from u#1
after clearing fault of ST#3
tripping.
Start all tripped pumps in
offsite

For charging SF 2 bus/SE 2


bus/OCA

ST # II: DM make up pumps,


CW Makeup pumps, CW Blow
down pumps ,AC ventilation
pumps, BALP, BAHP,Service
water pumps & start AC
compressors.