Calculation Quantities of (Cement+Sand+C.Agg+Water) of RCC
Calculation Quantities of (Cement+Sand+C.Agg+Water) of RCC
AGG+WATER) OF RCC
TYPE OF WORK
Quantity
mixture
RCC
M3
FOOTING
NICKS
GROUND BEAM
COLUMN
LINTELS
FLOOR BEAM
91.06
5.65
21.76
12.52
2.32
21.3
31.8
4.77
RATIO
1.2.4
1.2.4
1.2.4
1.2.4
1.2.4
1.2.4
1.2.4
1.2.4
FLOOR SLAB
STAIR SLAB
cement
KG
317
317
317
317
317
317
317
317
/M3
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
sand
NO. BAG
606.2
37.6
144.9
83.3
15.4
141.8
211.7
31.8
TOTAL QAUNTITY
/M3
0.43
0.43
0.43
0.43
0.43
0.43
0.43
0.43
caorse agg
TOTAL
47.0
2.9
11.2
6.5
1.2
11.0
16.4
2.5
1272.7
/M3
0.86
0.86
0.86
0.86
0.86
0.86
0.86
0.86
98.6
water
TOTAL
94.0
5.8
22.5
12.9
2.4
22.0
32.8
4.9
/M3
15.2
0.9
3.6
2.1
0.4
3.5
5.3
0.8
197.3
63.6
STEEL
/L
TON
15155
940
3621
2083.6
386.1
3544.9
4.9
1.9
2.63
3.3
0.266
2.63
5292.3
2.77
793.8
1.21
63634.3
19.606
Quantity
mixture
cement
plain concrete
M3
RATIO
KG
/M3
under footing
under base stone
under ring beam
For the floors
16.938
1.52
1.2.4
1.2.4
1.2.4
1.2.4
317
317
317
317
0.2
0.2
0.2
0.2
4.3525
27.846
sand
NO OF
BAG
112.8
10.1
29.0
185.4
337.2
TOTAL QAUNTITY
caorse agg
water
/M3
TOTAL
/M3
TOTAL
/M3
PER LITTER
0.43
0.43
0.43
0.43
8.7
0.8
2.2
14.4
26.14
0.86
0.86
0.86
0.86
17.5
1.6
4.5
28.7
52.3
3.1
0.3
0.8
5.1
9.3
3100.8
278
796.8
5097.7
9273.6
Gallon
productive
Total Gallon
TYPE OF WORK
m2
23 (kg)
m2
NO
primary layers
1506.219
70
21.5
second layers
1506.219
100
15
950.256
30
31.5
950.256
45
21.2
950.256
250
3.8
950.256
250
3.8