Professional Documents
Culture Documents
Prices List
Prices List
13 Ppt4#
f7r/ ~ ,~
rAPR24"_
DEPARTMENTORDER
NO.
SERIESOF 2006)
XXXXXXXXXXXXXXX
2 5)
SUBJECf
REVISED SCHEDULEOF
FEESAND CHARGESFOR
LABORATORYTESTING
OF
CONSTRUCTION
MATERIALS
-----~~::::_~
~~---------------------------------------------------------------------------By virtue of Executive Order 197 dated 13 January 2000, directing all
Departments, Bureaus, Commissions, Offices and instrumentalities of the
National Government, including Government-owned or controlled Corporations,
to increase their fees and charges by not less than 20 percent, subject to certain
exception, the attached Revised Schedule of Fees and Charges for Testing of
Construction Materials and Other Services is hereby prescribed, and shall take
effect fifteen (15) days after the last publication in a newspaper of general
circulation.
111111" III
WI N 6U 00082
Attachment: As stated
2..5.
. Attachment
Page 1 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
NEW RATE
OLD RATE
KIND OF TEST/SERVICE
2002
I. SOil
1 Grading
2 Liquid Limit
3 Plastic Limit
4 Shrinkage Limit
5 Moisture Content
6 Compaction (Proctor)
7 Compaction (Modified)
8 Field Density
9 California Bearing Ratio (CBR)
10 Penetration (CBR), per molded specimen
11 Swell (CBR) , per molded specimen
12 Specific Gravity
13 Unit Weight
Disturbed Samples
Undisturbed Samples
14 Combined Sieve and Hydrometer
15 Consolidation
16 Consolidation of wet and dry specimen
under a 10 psi unit load
(correction factor for "k" value)
17 Direct Shear
18 Direct Shear one loading
19 Triaxial Compression
20 Triaxial Compression one loading
21 Unconfined Compression per Test
22 Compression including molding
(Soil-Stabilization) per molded specimen
23 Absorption (Soil-Stabilization)
24 Wash loss
160.00
100.00
100.00
120.00
50.00
470.00
530.00
310.00
1,160.00
70.00
70.00
130.00
200.00
120.00
120.00
150.00
60.00
570.00
640.00
380. 00
1,160.00
90.00
90.00
160.00
100.00
100.00
500.00
1,100.00
1,300.00
120.00
120.00
500.00
1,320.00
1,560.00
2,080.00
1060.00
3,120.00
2,080.00
360.00
160.00
2,080.00
1,280.00
3,120.00
2,500.00
360.00
200. 00
160.00
100.00
200.00
120.00
160.00
140.00
500. 00
160.00
120.00
100.00
200.00
170.00
500.00
200.00
150.00
120.00
Grading
Material Finer than No. 200 Sieve
Combined Sieve and Hydrometer
Crushing
~~it
Weight, loose and Rodded
6 iQuid Limit
2.5
Attachment
Page 2 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
KIND OF TEST/SERVICE
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
Plastic Limit
Specific Gravity and Absorption
Absorption
Specific Gravity
Moisture Content
Abrasion
California Bearing Ratio (CBR)
Stripping
Triaxial Mix with Asphalt, complete with
Laboratory Compacted Density. Absorption
Swell and stability Characteristics
a) First Trial
b) Each Extra Trial
Swell characteristics with bituminous materials
% Fractured Face
Soundness
Organic Impurities
Trial Mix (Concrete Design) given cement factor
Trial Mix (Concrete Design) given strength:
a) First Trial
b) Each extra Trial
Air Content of Fresh Mixed Concrete
Mortar Strength, 7 days
Trial Mix with asphalt for Marshall
Particles with specific gravity less than 2.00
Clay Lumps in Aggregates
OLD RATE
2002
100.00
200. 00
100.00
110.00
70.00
350.00
1,160.00
280.00
NEW RATE
120.00
200. 00
120.00
140.00
90.00
420.00
1,160.00
340.00
1,300.00
820.00
28000
100.00
330.00
200.00
920.00
1,570.00
990.00
340.00
120.00
400.00
240.00 .
1110.00
880.00
680.00
140.00
160.00
470.00
140.00
80.00
1060.00
820 00
170.00
200.00
570.00
170.00
100.00
70.00
110.00
70.00
60.00
60.00
230. 00
110.00
110.00
110.00
110.00
90.00
140.00
90.00
80.00
80.00
280.00
140.00
140.00
140.00
140.00
Attachment
Page 3 of 10
SCHEDULE OF FEES AND CHARGES
FOR LASORA TORY TESTING OF CONSTRUCTION MATERIALS
KIND OF TEST/SERVICE
8
9
10
11
12
13
14
15
16
Air Content
Loss on Ignition
Insoluble Residue
Sulfur Trioxide (Cement)
Magnesium Oxide
Silicon Dioxide
Aluminum Oxide
Ferric Oxide
Calcium Oxide
OLD RATE
2002
NEW RATE
110.00
120.00
160.00
160.00
160.00
160.00
160.00
160.00
160.00
140.00
150.00
160.00
160.00
160.00
160.00
200.00
200.00
200.00
110.00
230.00
160.00
160.00
160.00
140.00
280.00
200.00
200.00
200.00
310.00
380.00
120.00
70.00
120.00
380.00
460.00
150.00
90.00
150.00
160.00
160.00
170.00
120.00
120.00
120.00
230.00
220.00
70.00
160.00
230.00
180.00
200.00
200.00
210.00
150.00
150.00
150.00
280.00
270.00
90.00
200.00
280.00
220.00
IV BITUMINOUS MATERIALS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Penetration
Ductility
Softening Point
Float Test
Viscosity
Distillation
a) Emulsified Asphalt
b) Cut-back, Tar and petroleum products
Storage Stability
Specific Gravity
Loss on Heating
% Bitumen
a) Solubility in Carbon Disulfide
b) Solubility in Carbon Tetrachloride
Spot Test
Flash and Fire Point
Cement Mixing
Sieve Test
Modified Miscibility
Water Content
Stone Coating
Settlement Test
Residue of Specified Penetration
Particle Charger Tester
25
Attachment
Page 4 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
KIND OF TE~ T/SERVICE
V.
VI.
MISCELLANEOUS
220. 00
800. 00
270.00
970.00
110.00
220.00
220.00
140.00
270.00
270.00
160.00
140.00
120.00
70.00
200.00
170.00
150.00
90.00
120.00
230.00
250.00
280.00
790.00
230.00
950.00
280.00
1,160.00
790.00
1,220.00
1,400.00
950.00
1,470.00
2,320.00
2,560.00
1,860.00
2,090.00
2,790.00
3,080.00
2,240;00
2,510.00
190.00
270.00
70.00
70.00
70.00
60.00
230.00
330.00
90.00
90.00
90.00
80.00
MATERIALS (CHEMICAL)
(
~
NEW RATE
BITUMINOUS MIXTURES
(Including Rock Asphalt)
1 Extraction
2 Swell and Stability Characteristics with
Laboratory Compacted Density and Absorption
3 Density of % Voids of Compacted Mixtures
4 Marshall Stability
5 Field Density
OLD RATE
2002
Attachment
Page 5 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
OLD RATE
NEW RATE
KIND OF TEST/SERVICE
2002
1,340.00
1,110.00
g.7) Vehicle Binder (%m)
410.00
500.00
g.8) Glass Beads Content (%m)
100.00
80.00
g.9) Glass Beads Grading
1,500.00
1,250.00
h) Red Lead and Red Oxide Primer
1230.00
1020.00
I) Latex, Flatwall and Quick Dry Enamel
4 Water
a) Suitability for Concreting
b) Special Determination per Constituents
c) pH Test
d) Total Solid
e) Sulfate
f) Chloride
5 Galvanized Iron and Steel Sheets
a) Zinc Coating
1. For the firstsample
2. For each additional sample
b) Gauge Determination
c) Bend and Flaking Test
6 Reflective Sheetings
a) Thickness
b) Adhesion
c) Heat Resistance
d) Solvent Resistance
e) Reflectivity
7 Curing Compound
VII.
970.00
190.00
190.00
190.00
190.00
190.00
1,170.00
230.00
230.00
230.00
230.00
230.00
160.00
100.00
70.00
70.00
200.00
120.00
90.00
90.00
100.00
180.00
370.00
370.00
100.00
1,200.00
120.00
220.00
450.00
450.00
.120.00
1,440.00
8.0.00
.100.00
80.00
100.00
100.00
120.00
120.00
120.00
320.00
320.00
NEW RATE
150.00
200.00
90.00
90.00
350.00
460.00
520.00
660.00
870 00
1,440.00
1280.00
120.00
150.00
150.00
200.00
90.00
150.00
200.00
240.00
120.00
150.00
180.00
220.00
70.00
230.00
90.00
280.00
70.00
90.00
Attachment
Page 7 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
OLD RATE
KIND OF TEST/SERVICE
2002
b) Water Absorption
1. For 3 standard test specimen
2. For each additional standard test specimen
7 Asbestos Cement Pipes
a) Crushing strength
1. 10" nominal size and under
2. Over 10" to 18" nominal size
3. Over 18" to 30" nominal size
b) Flexural strength for pipes 8" nominal size
and under
VIII.
NEW RATE
230.00
70.00
280.00
90.00
160.00
230.00
320.00
160.00
200. 00
280.00
390.00
200.00
650.00
740.00
140.00
100.00
100.00
70.00
780.00
890.00
170.00
100.00
100.00
90.00
320.00
470.00
390.00
570.00
230.00
230.00
280.00
280.00
70.00
90.00
320.00
230.00
390.00
280.00
470.00
570.00
70.00
70.00
METAL
Attachment
Page 8 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
OLD RATE
KIND OF TEST/SERVICE
NEW RATE
2002
c) Weight Determination
d) Weight of Zinc coating
e) Thickness or uniformly of coating by
Preece test method
4 Wire and Wire ropes
a) Tensile properties for wire from gage 10 up
b) Ductility of wire
c) Adherence of coating
d) Uniformly of coating by Preece Test Method
e) Weight of linc coating
f) Breaking strength of wire ropes
1. !/2" nominal size and under
2. Over 'Yz" to 1" nominal size
g) Dimension measurement
5 Standard Test Specimens and Miscellaneous
Metal Products
a) Tensile properties of prepared test specimen
b) Hardness test, Brinnel or Rockwell:
1. For the first specimen
2. For each additional specimen
c) Impact test, Charpy, Izad or Tensile
prepared test specimen
1. For the first test specimen
2. For each additional test specimen
d) Wheelborrow check test
e) Cast iron manhole frame and cover
check test
f) Load test, hydraulic jacks, not over
50 tones capacity
g) Chemical analysis per element sulfur
h) Reflective Pavement Studs (Flexural Strength)
IX.
MISCELLANEOUS MA TERfALS
(MECHANICAL)
1 fiber rope
a) tensile strength
1. For ropes 1" in nominal size and under
2. Over 1" up to 2" in nominal size
3. Over 2" up to 3" in nominal size
70.00
470.00
320.00
90.00
570.00
390.00
160.00
160.00
160.00
160.00
230.00
200.00
200.00
200.00
200. 00
280.00
320.00
470.00
7000
390.00
570.00
90.00
350.00
420.00
160.00
70.00
200.00
90.00
160.00
70.00
470.00
200.00
90.00
570.00
470.00
2,320.00
570.00
2,790.00
230.00
350.00
280.00
420.00
230 00
280 00
390.00
570.00
320.00
470.00
2.5..
Page 9 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
OLD RATE
KIND OF TEST/SERVICE
NEW RATE
2002
SPECIAL TESTS
X.
1
XI.
MISCELLANEOUS
1,620.00
1,950.00
3,710.00
4,460.00
6,960.00
8,360.00
9,280.00
11,140.00
320.00
390.00
470.00
570.00
790.00
950 00
3,710.00
4,460.00
6,490.00
7,790.00
790.00
950. 00
420.00
510.00
790.00
950.00
SERVICES
Attachment
Page 10 of 10
SCHEDULE OF FEES AND CHARGES
FOR LABORATORY TESTING OF CONSTRUCTION MATERIALS
OLD RATE
KIND OF TEST/SERVICE
2002
XII.
SUBSURFACE
NEW RATE
EXPLORA TfON
1. Mobilization
2. Demobilization
3. Drilling through
a) Ordinary Soil, per Linear Meter
b) Gravel/Rocks, using DiamondfTungsten bit,
per Linear Meter
c) Standard Penetration Test (SPT), per SPT
4. Hole to Hole Transfer, per move
5. Core Box, per box
6. Miscellaneous Expenses (During Operation)
a) Diesel oil for Drilling MachinelWater
Pump (per day)
b) Diesel/Gasoline for Service Vehicle,
(per day)
c) Water Supply Source, per day
d) Plastic bags, Pentel pen, etc
5,230.00
5,230.00
6,280.00
6,280.00
880.00
1,740.00
1,060.00
2,090.00
1,740.00
50.00
2,090.00
1,000.00
460.00
230.00
200.00
1,000.00
APPROVED:
111111111111
WI N 6U 00082