Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Table 1

Details of P(W)PAs MIS

Plant

Contracted
Capacitya

Contract
Type

Plant
Owner

Plant
Status

Plant
Type

Contract
Expiryb

Ghubrah

430MW*
167,000 m3/d

PWPA

Al Ghubrah Power
and Desalination
Co. (SAOC)

Operational

OCGT/Steam
MSF Desalination
Natural gas fired
(Fuel oil as back-up)

2018

Rusail

687 MW

PPA

Rusail Power Co.


(SAOC)

Operational

OCGT
Natural gas fired
(Fuel oil as back-up)

2022

Wadi Jizzi

325 MW

PPA

Wadi Al-Jizzi Power


Co. (SAOC)

Operational

OCGT
Natural gas fired
(Fuel oil as back-up)

2020

Manah

273 MW

PPA

United Power Co.


(SAOG)

Operational

OCGT
Natural gas fired
(Fuel oil as back-up)

2020

Al Kamil

282 MW

PPA

Al Kamil Power Co.


(SAOG)

Operational

OCGT
Natural gas fired
(Fuel oil as back-up)

2017

Barka I

435 MW
91,000 m3/d

PWPA

ACWA Power Barka


(SAOG)

Operational

CCGT
MSF Desalination
Natural gas fired
(Fuel oil as back-up)

2018

45,000 m3/d

WPA

ACWA Power Barka


(SAOG)

Under
Construction

RO

2018

Sohar I

590 MW
150,000 m3/d

PWPA

Sohar Power Co.


(SAOG)

Operational

CCGT
MSF Desalination
Natural gas fired
(Fuel oil as back-up)

2022

Barka II

679 MW
120,000 m3/d

PWPA

SMN Barka Power


Co. (SAOC)

Operational

CCGT
RO Desalination
Natural gas fired
(Fuel oil as back-up)

2024

Sohar II

745 MW

PPA

Al Batinah Power
Co. (SAOC)

Operational

CCGT
Natural gas fired
(Fuel oil as secondary
fuel and back-up)

2028

Barka III

745 MW

PPA

Al Suwadi Power
Co. (SAOC)

Operational

CCGT
Natural gas fired
(Fuel oil as secondary
fuel and back-up)

2028

Sur

2000 MW

PPA

Phoenix Power Co.


(SAOC)

Under
Construction

CCGT
Natural gas fired
(Fuel oil as back-up)

2029

Contracted capacities are shown as of 2014, at reference condition 50oC.The contracted capacities are reported as net of plant
auxiliaries except for Ghubrah, Rusail, and Wadi Jizzi which are contracted at gross capacity. Plant capacities are shown elsewhere in this
report as evaluated at 45oC, which is more in line with peak demand conditions, and as net output rather than gross output.
b In all cases the contracts expire prior to the summer period of the year indicated.
*GT11 & ST4 at Ghubrah have been retired.

A summary of the generation capacity that is expected to be provided under these P(W)PAs over the 20142020 period is set out in Figure 2 below. This shows total contracted capacity of 7193 MW in 2014 before

7-Year Statement (2014-2020)

Page 8

You might also like