Professional Documents
Culture Documents
Bailey Bridges
Bailey Bridges
GRSE AT A GLANCE
UNITS OF GRSE
ENGINE
SHIPBUILDING
ENGINEERING PRODUCTS
Modular Portable Steel
Bridges
Deck Machinery
Naval Pumps
PRODUCT PROFILE
PORTABLE STEEL
BRIDGES
Maximum clear span
- Single lane - 60.1m (220 ft)
- Double lane - 45.7m (140 ft)
SUSPENSION
BRIDGE
Maximum clear span
- 61m (200 ft) to 122m (400ft)
British Military Load Classification
Class 24(360 ft) & Class 18(400 ft)
The load class can be increased to
40 MT with reinforcement
PRODUCT RANGE
S.
No
TYPE OF BRIDGE
ROAD
WIDTH (m)
IRC* LOAD
CLASS
MAX.
SPAN (ft)
1.
3.32
i) UPTO 30R
ii) UPTO 40R
iii) UPTO 70R
200
190
140
2.
4.25
i) UPTO 30R
ii) UPTO 40R
iii) UPTO 70R
200
180
140
3.
SUSPENSION BRIDGE
(WOODEN / STEEL DECK)
3.277
Class 24/18#
(Normally)
360/400
4.
4.25
UPTO 70R
220
5.
7.00
UPTO 70R
140
classification
LAUNCHING METHODS
PUSH METHOD
STAGING METHOD
Parameter
Design
Sub-structure weight
Quality of Bridge
Construction Time
Proven
Very Heavy
Light
Site Controlled
Shop controlled
Uncertain
Possible irrespective
of the depth of gap
Up-gradation at later
stage
Not Possible
Possible
Disaster Management
Not possible
Possible with
stockpiling of items
Life Span
25 Year normally
Residual Value
It costs to demolish /
salvage
10
Population satisfaction
Time taking
Quick
NEW DEVELOPMENT
SINGLE LANE (EXTRA WIDE) BRIDGE USING
7 ft PANEL
ADVANTAGES:
LONGER SPANS
PATENT
RECEIVED
FOR
STIFFENED STEEL
DECK
PATENT
RECEIVED
(FOR DOUBLE
LANE BRIDGE)
For more details please contact : Garden Reach Shipbuilders & Engineers Ltd
61,Garden Reach Road, Kolkata-700024
Website: www.grse.nic.in
Email: engg.gm@grse.co.in; bbgrse@gmail.com
Mobile:+919007138296
PUSH METHOD
STAGING METHOD
110FT SPAN BAILEY BRIDGE 30KM FROM GIRIDIH ON GIRIDIH -DUMRI ROAD ON
RIVER BARGKAR IN HAZARIBAG, BIHAR