Professional Documents
Culture Documents
Induced Overvoltage Withstand Test: Purpose of The Test
Induced Overvoltage Withstand Test: Purpose of The Test
UntitledDocument
INDUCEDOVERVOLTAGEWITHSTANDTEST
PURPOSEOFTHETEST
Theobjectofthetestistosecurethattheinsulationbetweenthephasewindings,turn,coils,
tappingleadsandterminals,withstandthetemporaryovervoltagestowhichthetransformermay
besubjectedduringitslifetime.
PERFORMANCE
Theexcitationvoltageisappliedtotheterminalsofthelowvoltagewinding.Theotherwindings
areleftopencircuited.
Thedurationofthetestis:
ratedfrequency.120seconds
testfrequency
Thetestissuccessfulifnocollapseofthetestvoltageoccurs.
Thetestvoltageconnectionisessentiallythesameasinservice.Athreephasewindingistested
withsymmetricalthreephasevoltageinducedinthephasewindings.Ifthewindinghasaneutral
terminal,maybeitisearthedduringthetest.
Thetestvoltageistwicetheratedvoltage.However,thevoltagedevelopedbetweenline
terminalsofanywindingshallnotexceedtheratedshortdurationpowerfrequencywithstand
voltage.
Thevoltageismeasuredbetweenterminalsofthelowvoltagewindingusingavoltmeterat
r.s.m.value.Thevoltageissoadjusted,thattheaveragetothevoltagevaluemeasuredbetween
terminalsisequaltotherequiredtestvoltagevalue.
Fig.5.1
Testcircuitforinducedovervoltagewithstandtestonthreephase
transformer.
G 1supplygenerator, T1transformerundertest, T2currenttransformer,
P 1ammeter, P 2voltmeter(r.s.m.value).
TESTREPORT
Thetestvoltage,frequencyandtestdurationarestatedinthereport.
http://www.ocrev.com/transformers/overvoltage.html
1/1