Professional Documents
Culture Documents
Strategic Planning 2012
Strategic Planning 2012
Strategic Planning 2012
PLANNING 2012
PHIL ECOLOGY SYSTEMS
CORP
Definition of Service
Engineering
Gathering of Data
Analysis of Data
Implementation
Management
Target
1st QTR
2nd QTR
3rd QTR
Ramp 3 @ VMLS
Temporary Stockpile
4th QTR
Ramp 3
ISABEL
Sea Wall
Sea Bed
Cost=P3M
Proposed VMLS Ramp 3
R AMP 3
RAMP 3
Road @ Ramp 3
R AMP 2
R AMP 1
P roposed
Road @ VM LS EXit
A. ROADWAY
AREA (SQ.M.)
= 1,108
= Php 2,396
= Php 2,654,602
B. RAMP COST
= Php 220,000
C. CONTINGENCY (10%)
= Php 132,730
TEMPORARY STOCKPILE
R AMP 3
Road @ Ramp 3
R AMP 2
R AMP 1
COST = Php1.70M
P roposed
Road @ VM LS EXit
Php 200
TOTAL AMOUNT =
Php 740,000
B. MATERIAL
HDPE LINER
MATERIAL & LABOR COST = Php 300
SURFACE AREA =
SUB TOTAL COST =
2,600 sq.m.
Php 780,000
PROPOSED BUDGET
= Php 1.70 M
PROPOSED MATERIAL
RECOVERY FACILITIES
COST = Php. 10.0 M
STRUCTURE
COST =Php. 4.0M
General Requirements
145,000
Site Works
192,000
Concreting Works
870,000
Steel Works
1,500,000
Arch. Finishes
115,000
Roofing Works
485,000
Contingencies
661,400
3,968,400
4,000,000
FACILITIES
Details:
2012 Requirements
MRF Conveyor System
Description
Qty.
Unit
Unit Cost
Amount
Debagging Feeder
ea
880,000
2,640,000
Sorting Conveyor
ea
692,420
2,077,260
Transverse Conveyor
ea
263,684
1,054,736
ea
294,660
294,660
Sifter
ea
236,896
236,896
ea
220,740
220,740
ea
272,132
816,396
20
ea
5,632
112,640
lot
503,360
503,360
Delivery/Installation/Testing
lot
423,753
423,753
10
person
404
1,163,520
Power Consumption
12
mos.
15,000
180,000
9,723,961
= Php 10.0 M (APPROX.)
TOTAL PROJEC COST =
BUILDING + FACILITES
Php 14.0 M
PROPOSED
STEEL GATE @ VMLS
MAINTENANCE @ VMLS
(CHB FENCE, PAINTING)
R AMP 3
Road @ Ramp 3
R AMP 2
R AMP 1
P roposed
Road @ VM LS EXit
Access Road
Cost = P16.0M
PHASE 2
161.2418
159.9029
PHASE 3
169.4008
168.0315
49.6842
56.1695
PHASE 1
Development of
Phase 2;
Cell 5 & 6
Cost = P20.2M
Cost=Php. 5.0 M
Maintenance Work Including
Dredging and Diking
Cost=Php. 6 M
Maintenance Work Including
Dredging and Diking
BUDGET
PLEASE SEE EXCEL PRESENTATION
The End