Inventory of Departmental Key Performance Indicators(KPIs)

Mining
Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

1 Profit variance

Measures the percentage variance in the actual profit amount and


the budgeted profit amount.
Following rating scale to be adhered :
5- 100% and above achievement
4- Between 86%-99% achievement
3- Between 76%-85% achievement
2- Between 61%-75% achievement
1- Below 60% achievement

Actual profit (in Rs.)


x 100
Budgeted profit (in Rs.)

2 Profit variance per tonne

Measures the percentage variance in the actual profit amount per


tonne and the budgeted profit amount per tonne.
Following rating scale to be adhered :
5- 100% and above achievement
4- Between 86%-99% achievement
3- Between 76%-85% achievement
2- Between 61%-75% achievement
1- Below 60% achievement

Actual profit
(in Rs. per tonne)
x 100
Budgeted profit
(in Rs. per tonne)

3 Selling price per tonne

Measures the variance in the actual selling price per tonne and the
budgeted selling price for the year.
Following scale to be adhered to for rating:
5- if the actual selling price per tonne is 100% of the budget
4- if the actual selling price per tonne is between 91 to 99% of the
budget
3- if the actual selling price per tonne is between 81 to 90% of the
budget
2- if the actual selling price per tonne is between 61 to 80% of the
budget
1- if the actual selling price per tonne is below 60% of the budget

Actual selling price


(in Rs. per tonne)
x 100
Budgeted selling price
(in Rs. per tonne)

Financial

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

4 Production cost per tonne

Measures the expenditure registered at the end of the reporting


period per ton of coal mined.
Following scale to be adhered to for rating:
5- if the actual production cost is less than or equal to 90%the
budget
4- if the actual production cost is between 91 to 95% of the budget
3- if the actual production cost is between 96 to 100% of the
budget
2- if the actual production cost is between 101% to 105% of the
budget
1- if the actual production cost is above 105% of the budget

Actual cost
(in Rs. per tonne)
x 100
Budgeted cost
(in Rs. per tonne)

5 OB Removal cost per cubic metre

Measures the expenditure registered at the end of the reporting


period per cubic metre of mineral rocks or coal mined.
Following scale to be adhered to for rating:
5- if the actual OB removal cost is less than or equal to 90% the
budget
4- if the actual OB removal cost is between 91 to 95% of the budget
3- if the actual OB removal cost is between 96 to 100% of the
budget
2- if the actual OB removal cost is between 101% to 105% of the
budget
1- if the actual OB removal cost is above 105% of the budget

Financial

Explosive consumption per cubic


metre of OBR

Measures the amount of explosives measured in kilograms used for


dislocating one cubic metre of spoil broken from the solid rock.
Following scale to be adhered to for rating:
5- if the actual OB removed is 91% or above of the budget
4- if the actual OB removed is between 81 to 90% of the budget
3- if the actual OB removed is between 71 to 80% of the budget
2- if the actual OB removed is between 61 to 70% of the budget
1- if the actual OB removed is less than 60% of the budget

Actual cost
(in Rs. per cubic metre)
x 100
Budgeted cost
(in Rs. per cubic metre)

Actual cubic metre of OB removed


per kg of explosives consumed
x 100
Budgeted cubic metre of OB
removed per kg of explosives
consumed

Mining\2

Quadrant

No.

Key Performance Indicator

Formula

Wagon Under & Over loading


charges per tonne

Measures the actual charges of under and over loading incurred


relative to the budgeted under and over loading charges to be
incurred.
Following scale to be adhered to for rating:
5- if the actual under & over loading cost is less than or equal to
Actual under & over loading
90% the budget
charges incurred (in Rs. per tonne)
4- if the actual under & over loading cost is between 91 to 95% of
x 100
Budgeted under & over loading
the budget
charges incurred (in Rs. per tonne)
3- if the actual under & over loading cost is between 96 to 100% of
the budget
2- if the actual under & over loading cost is between 101% to 105%
of the budget
1- if the actual under & over loading cost is over 105% of the budget

% Technical accuracy of NIT


specifications

Measures the percentage of contracts which are re-tendered


because of technical discrepancies in NIT specifications.
Following scale to be adhered to for rating:
5- if no contracts were re-tendered due to technical discrepancies
4- if the number of contracts that were re-tendered is less than 5%
of the total number of contracts
3- if the number of contracts that were re-tendered is between 6 to
10% of the total number of contracts
2- if the number of contracts that were re-tendered is between 11
to 15% of the total number of contracts
1- if the number of contracts that were re-tendered is more than
15% of the total number of contracts

Number of contracts re-tendered


due to technical discrepancies in NIT
specifications

Addition of new legal case (Mining


related)

Measures the number of legal cases added during the year because
of the discrepancies caused by Mining department.
Following scale to be adhered to for rating:
5- if the number of legal cases added during the year is zero
4- if the number of legal cases added during the year is upto 2
3- if the number of legal cases added during the year is between 3
to 4
2- if the number of legal cases added during the year is between 4
to 5
1- if the number of legal cases added during the year is more than 5

Number of Mining related cases added


during the year

Financial
8

KPI Definition

Mining\3

Quadrant

No.

10

Key Performance Indicator

KPI Definition

Formula

% Technical accuracy in scrutiny of


bid documents

Measures the percentage of repair contracts which are re-tendered


because of technical discrepancies in scrutiny of bid documents.
Following scale to be adhered to for rating:
5- if no contracts were re-tendered due to technical discrepancies
4- if the number of contracts that were re-tendered is less than 5%
of the total number of contracts
3- if the number of contracts that were re-tendered is between 6 to
10% of the total number of contracts
2- if the number of contracts that were re-tendered is between 11
to 15% of the total number of contracts
1- if the number of contracts that were re-tendered is more than
15% of the total number of contracts

Number of contracts re-tendered due to


technical discrepancies in scrutiny of bid
documents

Production manshifts loss due to


accidents

Measures the total number of productive manshifts lost because of


accidents or fatalities.
Following scale to be adhered to for rating:
5- if the number of shifts in which production could not be done
because of accidents is zero
4- if the number of shifts in which production could not be done
because of accidents is upto 1% of the total shifts
3- if the number of shifts in which production could not be done
because of accidents is between 1 to 2% of the total shifts
2- if the number of shifts in which production could not be done
because of accidents is between 2 to 3% of the total shifts
1- if the number of shifts in which production could not be done
because of accidents is more than 3% of the total shifts

Financial
11

12 Store cost per tonne

Measures the store cost incurred for per ton in the current year
relative to the budgeted store cost.
Following scale to be adhered to for rating:
5- if the actual store cost is less than or equal to 90% the budget
4- if the actual store cost is between 91 to 95% of the budget
3- if the actual store cost is between 96 to 100% of the budget
2- if the actual store cost is between is between 101% to 105% of
the budget
1- if the actual store cost over 105% of the budget

Number of shifts in which


production could not be done
because of accidents
x 100
Total number of manshifts

Actual store cost


(In Rs. per tonne)
x 100
Budgeted store cost
(in Rs. per tonne)

Mining\4

Quadrant

Financial

No.

Key Performance Indicator

KPI Definition

Formula

13 Coal sales realization per ton

Measures the percentage variation in the realization amount of per


tonne of coal relative to the estimated realization for that year.
Following scale to be adhered to for rating:
5- if the actual coal sale realization per tonne is 100% of the
projected realization per tonne
4- if the actual coal sale realization per tonne is between 91 to 99%
of the projected realization per tonne
3- if the actual coal sale realization per tonne is between 81 to 90%
of the projected realization per tonne
2- if the actual coal sale realization per tonne is between 61 to 80%
of the projected realization per tonne
1- if the actual coal sale realization per tonne is below 60% of the
projected realization per tonne

Actual realization (In Rs. per


tonne) from the sale of coal
during the year
x 100
Projected realization (in Rs. per
tonne) from the sale of coal for
the year

Bonus earned against coal quantity


14
despatched

Measures the total amount of bonus which is earned for


despatching additional coal vis a vis threshhold .
Following scale to be adhered to for rating:
5- if the bonus received is 91% or above of the target
4- if the bonus received is between 81 to 90% of the target
3- if the bonus received is between 71 to 80% of the target
2- if the bonus received is between 61 to 70% of the target
1- if the bonus received is less than 60% of the target

Actual bonus (in Rs.) received


during the year
x 100
Targeted bonus (in Rs.) to be
received during the year

15 Cash against sales realized

Measures the percentage of cost realisation in current year.


Following scale to be adhered to for rating:
5- if the realization amount is 91% or above of the total billed
amount
4- if the realization amount is between 81 to 90% of the total billed
amount
3- if the realization amount is between 71 to 80% of the total billed
amount
2- if the realization amount is between 61 to 70% of the total billed
amount
1- if the realization amount is less than 60% of the total billed
amount

Total amount realized (in Rs.)


x 100
Total billed amount (in Rs.)
in the current year

Mining\5

Quadrant

No.

16

Key Performance Indicator

Stone / Shale / Extraneous material


compensation

Financial

17 Demurrage free despatch

KPI Definition
Measures the reduction in the total amount of Stone / Shale /
Extraneous material compensation which has been paid to the
customers.
Following scale to be adhered to for rating:
5- if no Stone / Shale / Extraneous material compensation has been
paid
4- if the Stone / Shale / Extraneous material compensation per
tonne is less than the last year's Stone / Shale / Extraneous
material compensation
3- if the Stone / Shale / Extraneous material compensation per
tonne is equal to the last year's Stone / Shale / Extraneous
material compensation
2- if the Stone / Shale / Extraneous material compensation per
tonne is more than the last year's Stone / Shale / Extraneous
material compensation per tonne by 1%
1- if the Stone / Shale / Extraneous material compensation per
tonne is more than the last year's Stone / Shale / Extraneous
material compensation per tonne by more than 1%
Measures the percentage of dispatch schedule without any
demurrage levied on it.
Following scale to be adhered to for rating:
5- if the proportional number of demurrage levied is 0 to 5% of
total number of times demurrage levied on the subsidiary during
the year
4- if the proportional number of demurrage levied is 6 to 10% of
total number of times demurrage levied on the subsidiary during
the year
3- if the proportional number of demurrage levied is 11 to 15% of
total number of times demurrage levied on the subsidiary during
the year
2- if the proportional number of demurrage levied is 16 to 20% of
total number of times demurrage levied on the subsidiary during
the year
1- if the proportional number of demurrage levied is 20% or more
than 20% of total number of times demurrage levied on the
subsidiary during the year

Formula

Stone / Shale / Extraneous


material compensation paid
(Rs./per tonne) in the
previous year
x 100
Stone / Shale / Extraneous
material compensation paid
(Rs./per tonne) in the previous
year in the current year

Proportional number of times


demurrage levied due to non
- availability of coal
x 100
Total number of times
demurrage levied on the
subsidiary during the year

Mining\6

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

18 Variable Cost Index

Measures the difference between the standard variable overheads


absorbed in production and the actual variable overheads incurred.
Note: Variable cost includes overtime, sunday deployment, power
and POL.
Following scale to be adhered to for rating:
5- if the actual variable cost per tonne is less than or equal to 90%
the budget
4- if the actual variable cost per tonne is between 91 to 95% of the
budget
3- if the actual variable cost per tonne is between 96 to 100% of the
budget
2- if the actual variable cost per tonne is between 101% to 105% of
the budget
1- if the actual variable cost per tonne is over 105% of the budget"

Actual variable cost


(in Rs. per tonne)
Budgeted variable cost x 100
(in Rs. per tonne)

Production manshifts loss due to IR


19
problems

Measures the total number of productive manshifts lost because of


IR problems
Following scale to be adhered to for rating:
5- if the number of shifts in which production could not be done
because of IR problems is zero
4- if the number of shifts in which production could not be done
because of IR problems is upto 1% of the total shifts
3- if the number of shifts in which production could not be done
because of IR problems is between 1 to 2% of the total shifts
2- if the number of shifts in which production could not be done
because of IR problems is between 2 to 3% of the total shifts
1- if the number of shifts in which production could not be done
because of IR problems is more than 3% of the total shifts

Financial

20

Dispatch target achievement


overall (Rs.) %

Measures the sector wise despatch against the sector wise target.
Following scale to be adhered to for rating:
5- if the actual dispatch value is 91% or above of the target value
4- if the actual dispatch value is between 81 to 90% of the target
value
3- if the actual dispatch value is between 71 to 80% of the target
value
2- if the actual dispatch value is between 61 to 70% of the target
value
1- if the actual dispatch value is less than 60% of the target value

Number of shifts in which


production could not be done
because of IR problems
x 100
Total number of manshifts

Actual despatch (in Rs.)


x 100
Targeted despatch (in Rs.)

Mining\7

Quadrant

Financial

No.

Key Performance Indicator

21 Loss Variance per tonne

KPI Definition

Measures the percentage variance in the actual loss amount per


tonne and the budgeted loss amount per tonne.
Following rating scale to be adhered :
5- 100% and above achievement
4- Between 86%-99% achievement
3- Between 76%-85% achievement
2- Between 61%-75% achievement
1- Below 60% achievement

Formula

a. Budgeted loss per tonne actual loss per tonne


x 100
Budgeted loss per tonne
b. i. If the answer of above is positive,
then add 100 to the answer to get
achievement %
ii. If the answer of above is negative,
then subtract 100 to the answer to get
achievement %

Mining\8

Quadrant

No.

Key Performance Indicator

1 Coal grade materialization

Customer

KPI Definition

Measures the total amount of coal dispatched as per declared grade


which shows improvement in coal quality
Following scale to be adhered to for rating:
5- if 91% or above quantity of coal despatched is as per the
declared grade
4- if 81 to 90% quantity of coal despatched is as per the declared
grade
3- if 71 to 80% quantity of coal despatched is as per the declared
grade
2- if 61 to 70% quantity of coal despatched is as per the declared
grade
1- if 60% or less than 60% quantity of coal despatched as per the
declared grade

Reduction in unauthorised
absenteeism

Measures the volume of time lost due to unauthorised absence from


the workplace or from a duty or obligation.
Following scale to be adhered to for rating:
5- if the unauthorised absenteeism % in the current year is 0 %
4- if the unauthorised absenteeism % in the current year is 1 to 3%
3- if the unauthorised absenteeism % in the current year is 4 to 6%
2- if the unauthorised absenteeism % in the current year is 7 to 9%
1- if the unauthorised absenteeism % in the current year is 10% or
more than 10%

Dispatch target achievement by


road mode

Measures the percentage achievement of the dispatch target


through road mode relative to the budgeted dispatch target.
Following scale to be adhered to for rating:
5- if the quantity dispatched by road is 91% or above of the
budgeted quantity
4- if the quantity dispatched by road is between 81 to 90% of the
budgeted quantity
3- if the quantity dispatched by road is between 71 to 80% of the
budgeted quantity
2- if the quantity dispatched by road is between 61 to 70% of the
budgeted quantity
1- if the quantity dispatched by road is less than 60% of the
budgeted quantity

Formula

Total coal dispatched


within declared grade (in tonnes)
Total coal dispatched (in tonnes)

x 100

Unauthorised absenteeism
% in the current year

Actual coal
dispatched through
road (in tonnes)
x 100
Budgeted coal to
be dispatched through
road (in tonnes)

Mining\9

Quadrant

No.

Key Performance Indicator

KPI Definition

4 Grievance redressal index

Measures the number of grievances of employees that have been


addressed.
Note: A complaint register should be maintained.
Following scale to be adhered to for rating:
5- if the number of grievances redressed is 91% or above of the
grievances recorded
4- if the number of grievances redressed is between 81 to 90% of
the grievances recorded
3- if the number of grievances redressed is between 71 to 80% of
the grievances recorded
2- if the number of grievances redressed is between 61 to 70% of
the grievances recorded
1- if the number of grievances redressed is less than 60% of the
grievances recorded

Inventory in terms of months


5 Consumption - mining related
spares

Measures the number of months running for which inventory is


being purchased and stocked.
Note: Running inventory = Total inventory - Dead inventory.
Following scale to be adhered to for rating:
5- if actual inventory (in months) is equal or less than the inventory
norm
4- if actual inventory (in months) is upto 10% of the inventory norm
3- if actual inventory (in months) is between 11 to 20 % of the
inventory norm
2- if actual inventory (in months) is between 21 to 30% of the
inventory norm
1- if actual inventory (in months) is above 31% of the inventory
norm

Customer

Formula

No. of grievances redressed


during the year
x 100
Total No. of grievances
recorded during the year

Inventory in value as on
31st March
x 100
Total consumption in
value during the year

Mining\10

Quadrant

No.

Key Performance Indicator

Inventory in terms of months


6 Consumption - mining related
consumable

Customer

Timely reply of Parliament/RTI


Queries

KPI Definition

Measures the number of months running for which inventory is


being purchased and stocked.
Note: Running inventory = Total inventory - Dead inventory.
Following scale to be adhered to for rating:
5- if actual inventory (in months) is equal or less than the inventory
norm
4- if actual inventory (in months) is upto 10% of the inventory norm
3- if actual inventory (in months) is between 11 to 20 % of the
inventory norm
2- if actual inventory (in months) is between 21 to 30% of the
inventory norm
1- if actual inventory (in months) is above 31% of the inventory
norm
Measures the number of RTIs which have been replied on time
relative to total number of RTIs which have been replied.
Following scale to be adhered to for rating:
5- if the number of Parliament/RTI Queries replied within time is
100%
4- if the number of Parliament/RTI Queries replied on time is
between 98%-99% of the total queries received
3- if the number of Parliament/RTI Queries replied on time is
between 96%-97% of the total queries received
2- if the number of Parliament/RTI Queries replied on time is
between 91%-95% of the total queries received
1- if the number of Parliament/RTI Queries replied on time is less
than 90% of the total queries received

Formula

Inventory in value as on
x 100
31st March
Total consumption in
value during the year

Number of Parliament/RTI
Queries replied on time
x 100
Total number of Parliament/RTI
Queries replied

Mining\11

Quadrant

No.

Key Performance Indicator

8 Coal delivered under E auction

Customer

10

KPI Definition

Measures the amount of value paid orders refunded due to non


supply of required quantity of coal during the year.
Following scale to be adhered to for rating:
5- if the quantity delivered under e-auction is 91% or above of the
quantity booked
4- if the quantity delivered under e-auction is between 81 to 90%
of the quantity booked
3- if the quantity delivered under e-auction is between 71 to 80%
of the quantity booked
2- if the quantity delivered under e-auction is between 61 to 70%
of the quantity booked
1- if the quantity delivered under e-auction is less than 60% of the
quantity booked

Dispatch target achievement


overall (quantity) %

Measures the sector wise despatch against the sector wise target.
Following scale to be adhered to for rating:
5- if the quantity dispatched is 91% or above of the target
4- if the quantity dispatched is between 81 to 90% of the target
3- if the quantity dispatched is between 71 to 80% of the target
2- if the quantity dispatched is between 61 to 70% of the target
1- if the quantity dispatched is less than 60% of the target

Out of stock situation - Centralized


items

Measures the number of times an item was unavailable in the stores,


when demanded.
Following scale to be adhered to for rating:
5- if the number of NA issued for non indented items is zero
4- if the number of NA issued for non indented items is between 1
to 4
3- if the number of NA issued for non indented items is between 5
to 6,
2- if the number of NA issued for non indented items is between 7
to 12,
1- if the number of NA issued for non indented items is more than
12.

Formula

Total order delivered


(in tonnes)
x 100
Total coal booked
under e auction (in tonnes)

Actual despatch (in tonnes)


x 100
Targeted despatch (in tonnes)

Number of NA issued for non-indented


items in current year

Mining\12

Quadrant

No.

11

Key Performance Indicator

Out of stock situation Decentralized items

Customer

12 Welfare expenditure

KPI Definition

Formula

Measures the number of times an item was unavailable in the stores,


when demanded.
Following scale to be adhered to for rating:
5- if the number of NA issued for non indented items is zero
4- if the number of NA issued for non indented items is between 1
to 4
3- if the number of NA issued for non indented items is between 5
to 6,
2- if the number of NA issued for non indented items is between 7
to 12,
1- if the number of NA issued for non indented items is more than
12.

Number of NA issued for non-indented


items in current year

Measures the amount of expenditure incurred on welfare activities


relative to the budgeted expenditure to be incurred on welfare
activities.
Following scale to be adhered to for rating:
5- if the actual welfare expenditure is 91% or above of the
budgeted welfare
4- if the actual welfare expenditure is between 81 to 90% of the
budgeted welfare
3- if the actual welfare expenditure is between 71 to 80% of the
budgeted welfare
2- if the actual welfare expenditure is between 61 to 70% of the
budgeted welfare
1- if the actual welfare expenditure is less than 60% of the
budgeted welfare

Actual welfare
expenditure (in Rs.)
x 100
Budgeted welfare
expenditure (in Rs.)

Mining\13

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

13 Utilization of manshift

Measures the efficiency with which manshift hours are being utilized
measured by the actual attendance rate during the period relative to
the budgeted attendance.
Following scale to be adhered to for rating:
5- if the actual manshifts used are 91% or above vis a vis the
budgeted manshifts
4- if the actual manshifts used are between 81 to 90% of the
budgeted manshifts
3- if the actual manshifts used are between 71 to 80% of the
budgeted manshifts
2- if the actual manshifts used are between 61 to 70% of the
budgeted manshifts
1- if the actual manshifts used are less than 60% of the budgeted
manshifts

Number of tripartite/bipartite
14
meetings

Measures the number of tripartite/bipartite meetings which have


been conducted during the year relative to the number of meetings
to be conducted. Following scale to be adhered to for rating:
5- if the number of meetings held are 91% or above of the targeted
meetings
4- if the number of meetings held are between 81 to 90% of the
targeted meetings
3- if the number of meetings held are between 71 to 80% of the
targeted meetings
2- if the number of meetings held are between 61 to 70% of the
targeted meetings
1- if the number of meetings held are less than 60% of the targeted
meetings

Actual number of tripartite/


bipartite meetings held
x 100
Budgeted number of tripartite
bipartite meetings to be held

15 Sand Stowing

Measures the degree to which the unsafe mining is minimised by


doing appropriate sand stowing taking the statutory guidelines into
consideration.
Following rating scale to be adhered for rating :
5- If percentage is between 91% -100%
4- If percentage is between 81%-90%
3- If percentage is between 71%-80%
2- If percentage is between 61%-70%
1- If percentage is 60% or less than 60%

Actual Sand stowing done


(in cubic meter)
x 100
Target Sand stowing to be done
(in cubic meter) as per statutory
requirement

Customer

Actual manshifts used


during the period
x 100
Total budgeted manshifts
during the period

Mining\14

Quadrant

No.

Key Performance Indicator

16 Explosive Utilization

Customer

KPI Definition

Formula

Measures the utilization of explosives which is determined by the


quantity used vis a vis quantity demanded for use.
Following scale to be adhered to for rating:
5- if the quantity of explosives used is 91% or above of the quantity
demanded
4- if the quantity of explosives used is between 81 to 90% of the
quantity demanded
3- if the quantity of explosives used is between 71 to 80% of the
quantity demanded
2- if the quantity of explosives used is between 61 to 70% of the
quantity demanded
1- if the quantity of explosives used is less than 60% of the quantity
demanded

Quantity of explosives used


(in kg.)
x 100
Quantity of explosives
demanded (in kg.)

Measures the percentage achievement of the dispatch target


through road mode relative to the budgeted dispatch target.
Following scale to be adhered to for rating:
5- if the quantity dispatched by road is 91% or above of the
budgeted quantity
4- if the quantity dispatched by road is between 81 to 90% of the
Dispatch target achievement by rail
17
budgeted quantity
mode
3- if the quantity dispatched by road is between 71 to 80% of the
budgeted quantity
2- if the quantity dispatched by road is between 61 to 70% of the
budgeted quantity
1- if the quantity dispatched by road is less than 60% of the
budgeted quantity

Variation in Reported Mined out


18 Coal & Coal Dispatched as per Insitu measurement

Measures the degree to which the variation in Reported Mined out


Coal & Coal Dispatched is identified as per In-situ measurement
keeping the guidelines of yellow book into consideration.
Following scale to be adhered to for rating:
5- if the variation is +1 or more than +1
4- if the variation is +1 to -1
3- if the variation is -1 to -3
2- if the variation is -3 to -4
1- if the variation is -4 to -5 or more than -5

Actual tonnes of coal dispatched


through rail (in tonnes)
x 100
Budgeted tonnes of coal to be
dispatched through rail
(in tonnes)

Variation as identified as per


In-situ measurement.

Mining\15

Quadrant

No.

Key Performance Indicator

Variation in physically measured


19 OB & Reported OBR as per In-situ
measurement

Customer

20

Dust suppression & control through


water spraying

21 Sump Development

KPI Definition

Formula

Measures the degree to which the variation in physically measured


OB & Reported OB removal is identified as per In-situ measurement
keeping the guidelines of yellow book into consideration.
Following scale to be adhered to for rating:
5- if the variation is +1 or more than +1
4- if the variation is +1 to -0
3- if the variation is 0 to -1
2- if the variation is -1 to -2
1- if the variation is -2 or more than -2

Variation as identified as per In-situ


measurement.

Measures the number of cases of PM beyond permissible limits.


Following rating scale to be adhered for rating :
5- If percentage is 0 %
4- If percentage is between 1% -10%
3- If percentage is between 11%-20%
2- If percentage is between 21%-30%
1- If percentage is more than 30%
Measures the degree to which the implementation of Annual Action
Plan for accumulation of water for pumping purpose has been
implemented.
Following rating scale to be adhered for rating :
5- If percentage is between 91% -100%
4- If percentage is between 81%-90%
3- If percentage is between 71%-80%
2- If percentage is between 61%-70%
1- If percentage is 60% or less than 60%

Number of cases of PM
beyond permissible limits
x 100
Total number of sample

Actual volume of sump created


(in cubic metre)
x 100
Planned volume of sump to be
created (in cubic metre)

Mining\16

Quadrant

Customer

No.

KPI Definition

Formula

UG Equipment utilization (on roll


22
basis)

Measures the actual utilization of equipments by against the norm.


Following scale to be adhered to for rating:
5- if the actual utilization of UG equipments is 91% or above of the
utilization as per norm
4- if the actual utilization of UG equipments is between 81 to 90%
of the utilization as per norm
3- if the actual utilization of UG equipments is between 71 to 80%
of the utilization as per norm
2- if the actual utilization of UG equipments is between 61 to 70%
of the utilization as per norm
1- if the actual utilization of UG equipments is less than 60% of the
utilization as per norm

Actual utilization of
UG equipments
x 100
Utilization of UG equipments
as per norm

OC Equipment utilization (on roll


23
basis)

Measures the actual utilization of equipments by against the norm.


Following scale to be adhered to for rating:
5- if the actual utilization of OC equipments is 91% or above of the
utilization as per norm
4- if the actual utilization of OC equipments is between 81 to 90%
of the utilization as per norm
3- if the actual utilization of OC equipments is between 71 to 80%
of the utilization as per norm
2- if the actual utilization of OC equipments is between 61 to 70%
of the utilization as per norm
1- if the actual utilization of OC equipments is less than 60% of the
utilization as per norm

Actual utilization of
OC equipments
x 100
Utilization of OC equipments
as per norm

24

Key Performance Indicator

Maturity of mining related tender centralised item

Measures the number of tenders which were finalized within validity


period relative to the total number of tenders placed.
Following scale to be adhered to for rating:
5- if the number of tenders finalized within validity period is 91%
and above of the tenders floated
4- if the number of tenders finalized within validity period is
between 81 to 90% of the tenders floated
3- if the number of tenders finalized within validity period is
between 71 to 80% of the tenders floated
2- if the number of tenders finalized within validity period is
between 61 to 70% of the tenders floated
1- if the number of tenders finalized within validity period is less
than 60% of the tenders floated

Number of tenders finalized


within the validity period
Number of tenders floated during
the year

x 100

Mining\17

Quadrant

No.

25

Key Performance Indicator

Maturity of mining related tender decentralised item

Customer

26 % of sized coal dispatched by rail

KPI Definition

Measures the number of tenders which were finalized within validity


period relative to the total number of tenders placed.
Following scale to be adhered to for rating:
5- if the number of tenders finalized within validity period is 91%
and above of the tenders floated
4- if the number of tenders finalized within validity period is
between 81 to 90% of the tenders floated
3- if the number of tenders finalized within validity period is
between 71 to 80% of the tenders floated
2- if the number of tenders finalized within validity period is
between 61 to 70% of the tenders floated
1- if the number of tenders finalized within validity period is less
than 60% of the tenders floated
Measures the percentage of sized (crushed) coal dispatched as per
the Annual Action Plan (AAP).
Note: the grade of dispatched coal should be as per the MoU target.
Following scale to be adhered to for rating:
5- if the quantity of sized coal is 91% or above vis a vis the total
quantity dispatched
4- if the quantity of sized coal is between 81 to 90% vis a vis the
total quantity dispatched
3- if the quantity of sized coal is between 71 to 80% vis a vis the
total quantity dispatched
2- if the quantity of sized coal is between 61 to 70% vis a vis the
total quantity dispatched
1- if the quantity of sized coal is less than 60% or less vis a vis the
total quantity dispatched

Formula

Number of tenders finalized


within the validity period
Number of tenders floated during
the year

x 100

Quantity of sized (crushed)


coal dispatched
x 100
Total quantity of coal dispatched

Mining\18

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

27 HEMM Availability %

Measures the effectiveness with which HEMM equipments are being


maintained for ensuring their optimum availability to produce OB &
Coal.
Following scale to be adhered to for rating:
5- if the actual availability is above the CMPDI norm
4- if the actual availability is equal to the CMPDI norm
3- if the actual availability is less than to the CMPDI norm by by to
5%
2- if the actual availability is less than to the CMPDI norm by 10%
1- if the actual availability is less than to the CMPDI norm by 15% or
more

Actual availability
x 100
Availability norm as per CMPDI

28 UG Equipemnt Availability %

Measures the effectiveness with which UG equipments are being


maintained for ensuring their optimum availability to produce OB &
Coal.
Following scale to be adhered to for rating:
5- if the actual availability is above the CMPDI norm
4- if the actual availability is equal to the CMPDI norm
3- if the actual availability is less than to the CMPDI norm by by to
5%
2- if the actual availability is less than to the CMPDI norm by 10%
1- if the actual availability is less than to the CMPDI norm by 15% or
more

Actual availability
x 100
Availability norm as per CMPDI

Customer

Mining\19

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

Measures the actual quantity of coal produced for the organisation


v/s target.

Departmental Coal Production


1
achievement % - annual

Following scale to be adhered to for rating:


5- if the actual coal production is 91% or above of the targeted
production
4- if the actual coal production is between 81 to 90% of the
targeted production
3- if the actual coal production is between 71 to 80% of the
targeted production
2- if the actual coal production is between 61 to 70% of the
targeted production
1- if the actual coal production is less than 60% of the targeted
production

Actual Coal Production


(in tonnes)
x 100
Budgeted Coal Production
(in tonnes)

Measures the actual quantity of OB removed for the organisation v/s


target.

Internal
Process

Departmental OB removal
2
achievement % - annual

Following scale to be adhered to for rating:


5- if the actual OB removed is 91% or above of the targeted
removal
4- if the actual OB removed is between 81 to 90% of the targeted
removal
3- if the actual OB removed is between 71 to 80% of the targeted
removal
2- if the actual OB removed is between 61 to 70% of the targeted
removal
1- if the actual OB removed is less than 60% of the targeted
removal

Measures the total percentage of actual coal production being done


from open cast mines relative to the budgeted open cast production.
Following scale to be adhered to for rating:
5- if the actual OC production is 91% or above of the targeted
production
4- if the actual OC production is between 81 to 90% of the targeted
% Departmental OC coal production
3
production
- annual
3- if the actual OC production is between 71 to 80% of the targeted
production
2- if the actual OC production is between 61 to 70% of the targeted
production
1- if the actual OC production is less than 60% of the targeted
production

Actual OB Removed
(in cubic meter)
x 100
Budgeted OB Removal
(in cubic meter)

Actual OC production
(in tonnes)
x 100
Budgeted OC production
(in tonnes)

Mining\20

Quadrant

No.

Key Performance Indicator

% Departmental UG coal
4
production - annual

Formula

Measures the total percentage of actual coal production being done


from under ground mines relative to the budgeted under ground
production. Following scale to be adhered to for rating:
5- if the actual UG production is 91% or above of the targeted
production
4- if the actual UG production is between 81 to 90% of the targeted
production
3- if the actual UG production is between 71 to 80% of the targeted
production
2- if the actual UG production is between 61 to 70% of the targeted
production
1- if the actual UG production is less than 60% of the targeted
production

Actual UG production
(in tonnes)
x 100
Budgeted UG production
(in tonnes)

% Departmental Quarterly Coal


Production schedule adherence

Measures the degree to which coal production targets were


achieved on quarterly basis during the measurement period of time.
Following scale to be adhered to for rating:
5- if the number of quarters in which targets are achieved is 100%
4- if the number of quarters in which targets are achieved is 75%
3- if the number of quarters in which targets are achieved is 50%
2- if the number of quarters in which targets are achieved is 25%
1- if the number of quarters in which targets are achieved is 0%

No. of quarters in which targets


were achieved
x 100
4

% Departmental Quarterly OB
Production schedule adherence

Measures the degree to which OB removal targets were achieved on


quarterly basis during the measurement period of time. Following
scale to be adhered to for rating:
5- if the number of quarters in which targets are achieved is 100%
4- if the number of quarters in which targets are achieved is 75%
3- if the number of quarters in which targets are achieved is 50%
2- if the number of quarters in which targets are achieved is 25%
1- if the number of quarters in which targets are achieved is 0%

No. of quarters in which targets


were achieved
x 100
4

Internal
Process
5

KPI Definition

Mining\21

Quadrant

No.

Key Performance Indicator

Formula

% Departmental Shift Coal


Production schedule adherence

Measures the degree to which coal production targets were


achieved on shift basis during the measurement period of time.
Following scale to be adhered to for rating:
5- if the number of shifts in which targets are achieved are 91% or
above of the target
Number of shifts in a quarter
4- if the number of shifts in which targets are achieved are between
in
which targets were achieved
81 to 90% of the target
x 100
3- if the number of shifts in which targets are achieved are between Total number of shifts in a quarter
71 to 80% of the target
2- if the number of shifts in which targets are achieved are between
61 to 70% of the target
1- if the number of shifts in which targets are achieved are less than
60% of the target

% Departmental Shift OB
Production schedule adherence

Measures the degree to which OB removal targets were achieved on


shift basis during the measurement period of time. Following scale
to be adhered to for rating:
5- if the number of shifts in which targets are achieved are 91% or
above of the target
Number of shifts in a quarter in
4- if the number of shifts in which targets are achieved are between
which targets were achieved
81 to 90% of the target
x 100
3- if the number of shifts in which targets are achieved are between Total number of shifts in a quarter
71 to 80% of the target
2- if the number of shifts in which targets are achieved are between
61 to 70% of the target
1- if the number of shifts in which targets are achieved are less than
60% of the target

Departmental Output per man shift


- Overall

Measures the actual overall output per manshift relative to the


budgeted overall output.
Following scale to be adhered to for rating:
5- if the actual OMS achieved is 91% or above of the bugdet
4- if the actual OMS achieved is between 81 to 90% of the bugdet
3- if the actual OMS achieved is between 71 to 80% of the bugdet
2- if the actual OMS achieved is between 61 to 70% of the bugdet
1- if the actual OMS achieved is less than 60% of the bugdet

Internal
Process
8

KPI Definition

Actual OMS
x 100
Budgeted OMS

Mining\22

Quadrant

No.

10

11
Internal
Process

12

Key Performance Indicator

KPI Definition

Formula

Departmental Output per man shift


(Underground)

Measures the actual overall underground output per manshift


relative to the budgeted overall output.
Following scale to be adhered to for rating:
5- if the actual OMS achieved is 91% or above of the bugdet
4- if the actual OMS achieved is between 81 to 90% of the bugdet
3- if the actual OMS achieved is between 71 to 80% of the bugdet
2- if the actual OMS achieved is between 61 to 70% of the bugdet
1- if the actual OMS achieved is less than 60% of the bugdet

Actual OMS
x 100
Budgeted OMS

Departmental Output per man shift


(Open cast)

Measures the actual overall open cast output per manshift relative to
the budgeted overall output.
Following scale to be adhered to for rating:
5- if the actual OMS achieved is 91% or above of the bugdet
4- if the actual OMS achieved is between 81 to 90% of the bugdet
3- if the actual OMS achieved is between 71 to 80% of the bugdet
2- if the actual OMS achieved is between 61 to 70% of the bugdet
1- if the actual OMS achieved is less than 60% of the bugdet

Actual OMS
x 100
Budgeted OMS

Compliance to Safety committee


observations

Measures the adherence to safety norms of the PIT safety committee.


Following scale to be adhered to for rating:
5- if the number of observations complied with are 91% or above
of the total
4- if the number of observations complied with are between 81 to
No. of observations received from
90% of the total
pit safety committee complied
3- if the number of observations complied with are between 71 to
x 100
Total no. of observations
80% of the total
2- if the number of observations complied with are between 61 to
70% of the total
1- if the number of observations complied with are less than 60%
of the total

Mining\23

Quadrant

No.

KPI Definition

Formula

Measures the number of night inspections which have been carried


out relative to scheduled number of inspections to be carried out.
Following scale to be adhered to for rating:
5- if number of night inspections done is 91% or above vis a vis the
scheduled number of inspections required to be done
4- if number of night inspections done is between 81 to 90% of the
scheduled number of inspections required to be done
3- if number of night inspections done is between 71 to 80% of the
scheduled number of inspections required to be done
2- if number of night inspections done is between 61 to 70% of the
scheduled number of inspections required to be done
1- if number of night inspections done is less than 60% of the
scheduled number of inspections required to be done

Actual number of night


inspections done
x 100
Scheduled number of night
inspections to be done as per
statutory law

14 UG inspection rate

Measures the efficiency with which the UG inspections are being


carried out relative to the number of working days.
Following scale to be adhered to for rating:
5- if number of night inspections done is 91% or above vis a vis the
scheduled number of inspections required to be done
4- if number of night inspections done is between 81 to 90% of the
scheduled number of inspections required to be done
3- if number of night inspections done is between 71 to 80% of the
scheduled number of inspections required to be done
2- if number of night inspections done is between 61 to 70% of the
scheduled number of inspections required to be done
1- if number of night inspections done is less than 60% of the
scheduled number of inspections required to be done

Actual number of
inspections conducted
x 100
Total number of working days

Updation of face support - Roof


15
Bolts

Measures the number of roof bolts installed and % completion


against face progress.
Following scale to be adhered to for rating:
5- if the number of roof bolts installed is 91% or above of the target
4- if the number of roof bolts installed is between 81 to 90% of the
target
3- if the number of roof bolts installed is between 71 to 80% of the
target
2- if the number of roof bolts installed is between 61 to 70% of the
target
1- if the number of roof bolts installed is less than 60% of the target

No of roof bolts installed


x 100
No. of bolts required to be
installed as per support plan

13

Internal
Process

Key Performance Indicator

Night shift inspections & report


submission

Mining\24

Quadrant

No.

16

Internal
Process

Key Performance Indicator

Finalization of coal transportation


contract

Construction of preparatory
17 stoppings & Sectionalisation of the
U/G area

18

Timely preparation & submission of


material budget

KPI Definition

Formula

Measures the efficiency in finalizing the coal transportation contracts


before the expiry of the same relative to total number of contracts in
place.
Following scale to be adhered to for rating:
5- if the number of contracts finalized by due date are 91% and
above
4- if the number of contracts finalized by due date are between 81
to 90%
3- if the number of contracts finalized by due date are between 71
to 80%
2- if the number of contracts finalized by due date are between 61
to 70%
1- if the number of contracts finalized by due date are less than
60%

Number of contracts finalized on


or before expiry of the existing
contract
x 100
Total number of coal transport
contracts that are required to be
renewed

Measures the sectionlisation of u/g section after completion of


development or as per the programme if the section is not being
simultaneously depillered.
Following scale to be adhered to for rating:
5- if the number of ventilation stoppings completed is 91% or
above of the target
4- if the number of ventilation stoppings completed is between 81
to 90% of the target
3- if the number of ventilation stoppings completed is between 71
to 80% of the target
2- if the number of ventilation stoppings completed is between 61
to 70% of the target
1- if the number of ventilation stoppings completed is between 81
to 90% of the target

Actual number of stoppings


completed within the defined
timeframe
x 100
Targeted number of stoppings to
be completed

Measures the preparation of material budget and its submission to


head quarter within scheduled time period.
Following scale to be adhered to for rating:
5- On or before time
4- if delayed by a wee
3- if delayed by 2 weeks
2- if delayed by 3 weeks
1- If never submitted.
Note: The target for submission is August.

Delay measured in days

Mining\25

Quadrant

No.

19

Key Performance Indicator

Contract worker non-compliance


index

KPI Definition

Formula

Measures the non-compliance with respect to contract worker


related issues.
Following scale to be adhered to for rating:
5- if number of violations in current year is zero
4- if number of violations in current year is less than previous year
3- if number of violations in current year is equal to previous year,
2- if number of violations in current year is more than previous year
1- if number of violations in current year is double than previous
year

No. of violated cases reported in


the current year
x 100
No. of violated cases reported in
the previous year

20 Utilisation of revenue budget

Measures the actual utilisation/expenditure against the provision.


Following rating scale to be adhered for rating :
5- If percentage is 91% and above
4- If percentage is between 81%-90%
3- If percentage is between 71%-80%
2- If percentage is between 71%-60%
1- If percentage is less than 60

Actual revenue cost


per cubic metre
x 100
Budgeted revenue cost
per cubic metre

Number of safety violations


21
identified in mining dept by DGMS

Measures the total number of safety violations identified in the


mining dept by DGMS.
Following scale to be adhered to for rating:
5- if number of violations identified is 91% or above of the actual
number violations in mining dept
4- if number of violations identified is between 81 to 90% of the
actual number violations in mining dept
3- if number of violations identified is between 71 to 80% of the
actual number violations in mining dept
2- if number of violations identified is between 61 to 70% of the
actual number violations in mining dept
1- if number of violations identified is less than 60% of the actual
number violations in mining dept

Number of safety violations


identified in mining dept.
x 100
Total number of safety
violations identified

Internal
Process

Mining\26

Quadrant

Internal
Process

No.

Key Performance Indicator

KPI Definition

Formula

Number of safety violations


22 identified in mining dept by ISO
auditors

Measures the total number of safety violations identified in the


mining dept by ISO auditors.
Following scale to be adhered to for rating:
5- if number of violations identified is 91% or above of the actual
number violations in mining dept
4- if number of violations identified is between 81 to 90% of the
actual number violations in mining dept
3- if number of violations identified is between 71 to 80% of the
actual number violations in mining dept
2- if number of violations identified is between 61 to 70% of the
actual number violations in mining dept
1- if number of violations identified is less than 60% of the actual
number violations in mining dept

Number of safety violations


identified in mining dept.
Total number of safety x 100
violations identified

23 Coal stock reduction

Measures the % reduction in stock of coal in current year as


compared to last year.
Following scale to be adhered to for rating:
5- if the coal stock is less than that of previous year
4- if the coal stock is equal to previous year
3- if the coal stock is more than the previous year by upto 5%
2- if the coal stock is more than the previous year by upto 10%
1- if the coal stock is more than the previous year by upto 15%

Coal stock as on 31st March


of the current year
x 100
Coal stock as on 31st March
of the previous year

24 Audit Paragraph

A measure that highlights the degree to which documentation and


process execution is in sync with the standard operating procedures
of the company.
Following scale to be adhered to for rating:
5- if the number of audit paragraphs that have been dropped is
100%
4- if the number of audit paragraphs that have been dropped is
between 91 to 99% of the number raised
3- if the number of audit paragraphs that have been dropped is
between 81 to 90% of the number raised
2- if the number of audit paragraphs that have been dropped is
between 61 to 80% of the number raised
1- if the number of audit paragraphs that have been dropped is less
than 60% of the number raised

Actual number of audit


paragraphs dropped
x 100
Actual number of audit
paragraphs raised

Mining\27

Quadrant

No.

25

Internal
Process

Key Performance Indicator

% Performance appraisal
participation rate

KPI Definition

Formula

Measures the % of employees who submitted the filled goal sheets


at the start of the year within the stipulated time frame out of the
total number of employees who were required to fill up the goal
sheets.
Following scale to be adhered to for rating:
5- if the number of employees who have submitted their appraisal
form by due date is 100%
4- if the number of employees who have submitted their appraisal
form by due date is between 95 to 99% of the total target
population of the eligible employees
3- if the number of employees who have submitted their appraisal
form by due date is between 91 to 94% of the total target
population of the eligible employees
2- if the number of employees who have submitted their appraisal
form by due date is between 81 to 90% of the total target
population of the eligible employees
1- if the number of employees who have submitted their appraisal
form by due date is less than 80% of the total target population
of the eligible employees

Number of employees who


submitted their appraisal form
within the due date
x 100
Total target population of the
eligible employees

Measures the proportion of employee performance appraisals


completed as scheduled (at the end of the year) from the total
appraisals due.
Following scale to be adhered to for rating:
5- if the number of employees who have been appraised by due
date is 100%
4- if the number of employees who have been appraised by due
date is between 95 to 99% of the total target population of the
% Performance appraisal completed
eligible employees
26
on time
3- if the number of employees who have been appraised by due
date is between 91 to 94% of the total target population of the
eligible employees
2- if the number of employees who have been appraised by due
date is between 81 to 90% of the total target population of the
eligible employees
1- if the number of employees who have been appraised by due
date is less than 80% of the total target population of the eligible
employees

No. of employees appraised


by due date
x 100
Total target population
of the employees

Mining\28

Quadrant

No.

27

Key Performance Indicator

Timely preparation of Manpower


Budget.

28 % Maintenance backlog
Internal
Process

29

Timely renewal of AMC / RC /


statutory licenses

KPI Definition

Measures the timeliness and efficiency with which manpower


budget is formulated and the delay is measured in terms of
mandays.
Following scale to be adhered to for rating:
5- On or before time
4- if delayed by a week
3- if delayed by 2 weeks
2- if delayed by 3 weeks
1- If never submitted.

Formula

Delay measured in terms of weeks

Measures the number of machines which have undergone


scheduled maintenance.
Following scale to be adhered to for rating:
5- if the number of machines undergone schedule maintenance is
91% or above of the target
4- if the number of machines undergone schedule maintenance is
between 81 to 90% of the target
3- if the number of machines undergone schedule maintenance is
between 71 to 80% of the target
2- if the number of machines undergone schedule maintenance is
between 61 to 70% of the target
1- if the number of machines undergone schedule maintenance is
less than 60% of the target

Number of machines undergone


scheduled maintenance
x 100
Number of machines identified
for scheduled maintenance

Measures the percentage of AMC / RC that are renewed within 2


months from the expiry date..
Following scale to be adhered to for rating:
5- if the number of AMC / RC /statutory licenses renewed within 2
months is 91% or above
4- if the number of AMC / RC /statutory licenses renewed within 2
months is between 81 to 90%
3- if the number of AMC / RC /statutory licenses renewed within 2
months is between 71 to 80%
2- if the number of AMC / RC /statutory licenses renewed within 2
months is between 61 to 70%
1- if the number of AMC / RC /statutory licenses renewed within 2
months is less than 60%

Number of AMC / RC /statutory


licenses renewed on or within 2
months of the expiry date
x 100
Total number of AMC / RC /
statutory licenses renewed

Mining\29

Quadrant

No.

30

Key Performance Indicator

Maintenance of siding stock / Coal


safety stock

Internal
Process

31 Compliance of DGMS violations

KPI Definition

Formula

Measures the number of times in coal stockout/loading shortage


related situation occurred in the current year due to non availiability
of coal at the siding point.
Following scale to be adhered to for rating:
5- if the number of times coal stockout/loading shortage related
situation occurred during the year is 0% of total rakes despatched
4- if the number of times coal stockout/loading shortage related
Number of times coal stockout or
situation occurred during the year is 1 to 5% of total rakes
loading shortage related situation
despatched
occurred during the year
3- if the number of times coal stockout/loading shortage related
x 100
situation occurred during the year is 6 to 10% of total rakes
Total rakes despatched
despatched
2- if the number of times coal stockout/loading shortage related
situation occurred during the year is 11 to 20% of total rakes
despatched
1- if the number of times coal stockout/loading shortage related
situation occurred during the year is more than 20% of total rakes
despatched
Measures the adherence to compliance with regards to the DGMS
violations relative to the total number of violations identified.
Following scale to be adhered to for rating:
5- if the number of violations complied is 91% or above of the
violations identified
4- if the number of violations complied is between 81 to 90% of the
violations identified
3- if the number of violations complied is between 71 to 80% of the
violations identified
2- if the number of violations complied is between 61 to 70% of the
violations identified
1- if the number of violations complied is less than 60% of the
violations identified

Number of DGMS violations


complied
x 100
Total number of DGMS violations
identified

Mining\30

Quadrant

No.

Key Performance Indicator

33

34

Formula

Measures the adherence to compliance with regards to the


ISO auditor violations relative to the total number of violations
identified. Following scale to be adhered to for rating:
5- if the number of violations complied is 91% or above of the
violations identified
4- if the number of violations complied is between 81 to 90% of the
violations identified
3- if the number of violations complied is between 71 to 80% of the
violations identified
2- if the number of violations complied is between 61 to 70% of the
violations identified
1- if the number of violations complied is less than 60% of the
violations identified

Number of violations complied


Total number of violations x 100
identified by ISO auditor

Timely submission of monthly


report

Measures the number of times when monthly report of power


requirement and availability of power is submitted to subsidiaries
and MoC on time.
Following scale to be adhered to for rating:
5- if the number of reports submitted on time is 91% or above of
the total reports submitted
4- if the number of reports submitted on time is between 81 to 90%
of the total reports submitted
3- if the number of reports submitted on time is between 71 to 80%
of the total reports submitted
2- if the number of reports submitted on time is between 61 to 70%
of the total reports submitted
1- if the number of reports submitted on time is less than 60% of
the total reports submitted

Number of times monthly report


was submitted on time
x 100
Total number of months when
report was submitted

Annual MIS reports submitted on


time

Measures the delay in submission of annual report beyond


stipulated date.
Note: 30th June is the deadline for each year.
Following scale to be adhered to for rating:
5- On or before time
4- if delayed by a week
3- if delayed by 2 weeks
2- if delayed by 3 weeks
1- If never submitted.

Compliance of ISO auditor


32
violations

Internal
Process

KPI Definition

Delay measured in days

Mining\31

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

35 Coal stock measurement - monthly

Measures the actual number of coal stock measurements which have


been done and the report for same has been sent to the HQ on time
relative to the targeted number of measurements to be carried out.
Following scale to be adhered to for rating:
5- if the number of reports submitted on time is 91% or above of
the total reports submitted
4- if the number of reports submitted on time is between 81 to 90%
of the total reports submitted
3- if the number of reports submitted on time is between 71 to 80%
of the total reports submitted
2- if the number of reports submitted on time is between 61 to 70%
of the total reports submitted
1- if the number of reports submitted on time is less than 60% of
the total reports submitted

Number of coal stock


measurements carried out &
reports sent to the HQ within
schedule time
x 100
Total number of coal stock
measurements to be carried out

36 Coal stock measurement - quarterly

Measures the actual number of coal stock measurements which have


been done and the report for same has been sent to the HQ on time
relative to the targeted number of measurements to be carried out.
Following scale to be adhered to for rating:
5- if the number of reports submitted on time is 91% or above of
the total reports submitted
4- if the number of reports submitted on time is between 81 to 90%
of the total reports submitted
3- if the number of reports submitted on time is between 71 to 80%
of the total reports submitted
2- if the number of reports submitted on time is between 61 to 70%
of the total reports submitted
1- if the number of reports submitted on time is less than 60% of
the total reports submitted

Number of coal stock


measurements carried out &
reports sent to the HQ within
schedule time
x 100
Total number of coal stock
measurements to be carried out

Internal
Process

Mining\32

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

Coal stock measurement - half


yearly

Measures the actual number of coal stock measurements which have


been done and the report for same has been sent to the HQ on time
relative to the targeted number of measurements to be carried out.
Following scale to be adhered to for rating:
5- if the number of reports submitted on time is 91% or above of
the total reports submitted
4- if the number of reports submitted on time is between 81 to 90%
of the total reports submitted
3- if the number of reports submitted on time is between 71 to 80%
of the total reports submitted
2- if the number of reports submitted on time is between 61 to 70%
of the total reports submitted
1- if the number of reports submitted on time is less than 60% of
the total reports submitted

Number of coal stock


measurements carried out &
reports sent to the HQ within
schedule time
x 100
Total number of coal stock
measurements to be carried out

38 Coal stock measurement - annually

Measures the actual number of coal stock measurements which have


been done and the report for same has been sent to the HQ on time
relative to the targeted number of measurements to be carried out.
Following scale to be adhered to for rating:
5- if the number of reports submitted on time is 91% or above of
the total reports submitted
4- if the number of reports submitted on time is between 81 to 90%
of the total reports submitted
3- if the number of reports submitted on time is between 71 to 80%
of the total reports submitted
2- if the number of reports submitted on time is between 61 to 70%
of the total reports submitted
1- if the number of reports submitted on time is less than 60% of
the total reports submitted

Number of coal stock


measurements carried out &
reports sent to the HQ within
schedule time
x 100
Total number of coal stock
measurements to be carried out

Prohibitory orders issued under


section 22 by DGMS

Measures the number of prohibitory orders which have been issued


under section 22 which can be either a notice for closure or for
immediate closure. Following scale to be adhered to for rating:
5- if no order is issued
1- if any order is issued

37

Internal
Process

39

Number of orders issued

Mining\33

Quadrant

No.

40

Key Performance Indicator

Machine Idle Hour due to non


availability of coal

Internal
Process

41 Indent processing

KPI Definition

Formula

Measures the actual time which for which machine is kept idle due
to non availability of coal.
Following scale to be adhered to for rating:
5- if the number of idle hours due to non avaliability of coal is less
than 1% of the total available working hours
4- if the number of idle hours due to non avaliability of coal is more
than 1% but less than 2% of the total available working hours
3- if the number of idle hours due to non avaliability of coal is more
than 2% but less than 3% of the total available working hours
2- if the number of idle hours due to non avaliability of coal is more
than 3% but less than 4% of the total available working hours
1- if the number of idle hours due to non avaliability of coal is more
than 4% of the total available working hours

Actual idle hours per day due to


non availability of coal
x 100
Available hours (Breakdown
hours + maintenance hours +
travel time)

Measures the extent to which the indent that has been submitted
to MM for initiating procurement is complete from all respect for
initiating procurement .
Following scale to be adhered to for rating:
5- if the actual number of indents where Technical Scrutiny &
other parameters were furnished after approval of indent by
Competent Authority on request of Material Management
Department is 0%
4- if the actual number of indents where Technical Scrutiny &
other parameters were furnished after approval of indent by
Competent Authority on request of Material Management
Department is between 1% to 2% of the total indents submitted
3- if the actual number of indents where Technical Scrutiny &
other parameters were furnished after approval of indent by
Competent Authority on request of Material Management
Department is between 3% to 5% of the total indents submitted
2- if the actual number of indents where Technical Scrutiny &
other parameters were furnished after approval of indent by
Competent Authority on request of Material Management
Department is between 6% to 8% of the total indents submitted
1- if the actual number of indents where Technical Scrutiny &
other parameters were furnished after approval of indent by
Competent Authority on request of Material Management
Department is 8% or above of the total indents submitted

Number of indents where


Technical Scrutiny & other
parameters were furnished after
approval of indent by Competent
Authority
x 100
Department Total number
of Indents submitted to MM
Department

Mining\34

Quadrant

No.

KPI Definition

Formula

Measures the actual quantity of OB removed for the organisation


v/s target.
Following scale to be adhered to for rating:
5- if the actual OB removed is 91% or above of the targeted removal
4- if the actual OB removed is between 81 to 90% of the targeted
removal
3- if the actual OB removed is between 71 to 80% of the targeted
removal
2- if the actual OB removed is between 61 to 70% of the targeted
removal
1- if the actual OB removed is less than 60% of the targeted removal

Actual OB Removed
(in cubic metre)
x 100
Targeted OB Removal
(in cubic metre)

43 % Hired HEMM OC coal production

Measures the total percentage of actual coal production being done


from open cast mines relative to the budgeted open cast production.
Following scale to be adhered to for rating:
5- if the actual OC production is 91% or above of the targeted
production
4- if the actual OC production is between 81 to 90% of the targeted
production
3- if the actual OC production is between 71 to 80% of the targeted
production
2- if the actual OC production is between 61 to 70% of the targeted
production
1- if the actual OC production is less than 60% of the targeted
production

Actual OC production
(in tonnes)
x 100
Budgeted OC production
(in tonnes)

% Hired HEMM Quarterly Coal


Production schedule adherence

Measures the degree to which coal production targets were


achieved on quarterly basis during the measurement period of time.
Following scale to be adhered to for rating:
5- if the number of quarters in which targets are achieved is 100%
4- if the number of quarters in which targets are achieved is 75%
3- if the number of quarters in which targets are achieved is 50%
2- if the number of quarters in which targets are achieved is 25%
1- if the number of quarters in which targets are achieved is 0%

No. of quarters in which


targets were achieved x 100
4

42

Internal
Process

44

Key Performance Indicator

Hired HEMM OB removal


achievement %

Mining\35

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

% Hired HEMM Quarterly OB


Production schedule adherence

Measures the degree to which OB removal targets were achieved on


quarterly basis during the measurement period of time.
Following scale to be adhered to for rating:
5- if the number of quarters in which targets are achieved is 100%
4- if the number of quarters in which targets are achieved is 75%
3- if the number of quarters in which targets are achieved is 50%
2- if the number of quarters in which targets are achieved is 25%
1- if the number of quarters in which targets are achieved is 0%

% Hired HEMM Shift Coal


46
Production schedule adherence

Measures the degree to which coal production targets were


achieved on shift basis during the measurement period of time.
Following scale to be adhered to for rating:
5- if the number of shifts in which targets are achieved are 91% or
above of the target
4- if the number of shifts in which targets are achieved are between
81 to 90% of the target
3- if the number of shifts in which targets are achieved are between
71 to 80% of the target
2- if the number of shifts in which targets are achieved are between
61 to 70% of the target
1- if the number of shifts in which targets are achieved are less than
60% of the target

Number of shifts in a quarter in


which targets were achieved
x 100
Total number of shifts in a quarter

% Hired HEMM Shift OB Production


47
schedule adherence

Measures the degree to which OB removal targets were achieved on


shift basis during the measurement period of time.
Following scale to be adhered to for rating:
5- if the number of shifts in which targets are achieved are 91% or
above of the target
4- if the number of shifts in which targets are achieved are between
81 to 90% of the target
3- if the number of shifts in which targets are achieved are between
71 to 80% of the target
2- if the number of shifts in which targets are achieved are between
61 to 70% of the target
1- if the number of shifts in which targets are achieved are less than
60% of the target

Number of shifts in a quarter in


which targets were achieved
x 100
Total number of shifts in a quarter

45

Internal
Process

No. of quarters in which targets


were achieved
x 100
4

Mining\36

Quadrant

No.

KPI Definition

Formula

Measures the actual overall open cast output per manshift relative to
the budgeted overall output.
Following scale to be adhered to for rating:
5- if the actual OMS achieved is 91% or above of the bugdet
4- if the actual OMS achieved is between 81 to 90% of the bugdet
3- if the actual OMS achieved is between 71 to 80% of the bugdet
2- if the actual OMS achieved is between 61 to 70% of the bugdet
1- if the actual OMS achieved is less than 60% of the bugdet

Actual OMS
x 100
Budgeted OMS

Updation of face support - Support


49
item

Measures the number of support items installed and % completion


against face progress.
Following scale to be adhered to for rating:
5- if the number of support items installed is 91% or above of the
target
4- if the number of support items installed is between 81 to 90% of
the target
3- if the number of support items installed is between 71 to 80% of
the target
2- if the number of support items installed is between 61 to 70% of
the target
1- if the number of support items installed is less than 60% of the
target

No of support units installed


x 100
No. of units required to be
installed as per support plan

50 CCDA claim processing

Measures the degree to which CCDA claims has been processed


within the stipulated timelines.
Following scale to be adhered to for rating:
5- if the number of CCDA claims processed within 15 days is 91% or
above
4- if the number of value paid orders refunded is between 81 to
90%
3- if the number of value paid orders refunded is between 71 to
80%
2- if the number of value paid orders refunded is between 61 to
70%
1- if the number of value paid orders refunded is 60% or less than
60%

Number of CCDA claims


processed within 15 days from the
date of receipt
x 100
Total number of CCDA claims to
be processed

48

Internal
Process

Key Performance Indicator

Hired HEMM Output per man shift


(Open cast)

Mining\37

Quadrant

No.

51

Key Performance Indicator

Quarterly random testing of


Explosive

KPI Definition

Measures the degree to which the quality of explosive is being


ensured by doing timely random testing of the same in consultation
with CMPDI .
Following rating scale to be adhered for rating :
5- If percentage is between 91% -100%
4- If percentage is between 81%-90%
3- If percentage is between 71%-80%
2- If percentage is between 61%-70%
1- If percentage is 60% or less than 60%

Formula

Actual velocity of explosive


x 100
Velocity as per norm

52 Powder Factor

Measures the degree to which the explosives are optimally getting


utilised to produce optimum level of fragmentation. Following scale
to be adhered to for rating:
5- if the power quantity being used is 91% or above of the targeted
quantity
4- if the power quantity being used is between 81 to 90% of the
targeted quantity
3- if the power quantity being used is between 71 to 80% of the
targeted quantity
2- if the power quantity being used is between 61 to 70% of the
targeted quantity
1- if the power quantity being used is less than 60% of the targeted
quantity

Actual Powder factor


x 100
Targeted Powder factor

53 Detonator factor for UG

Measures the degree to which the explosives are optimally getting


utilised to produce optimum level of fragmentation. Following scale
to be adhered to for rating:
5- if the detonator quantity being used is 91% or above of the
targeted quantity
4- if the detonator quantity being used is between 81 to 90% of the
targeted quantity
3- if the detonator quantity being used is between 71 to 80% of the
targeted quantity
2- if the detonator quantity being used is between 61 to 70% of the
targeted quantity
1- if the detonator quantity being used is less than 60% of the
targeted quantity

Actual Detonator factor


x 100
Targeted Detonator factor

Internal
Process

Mining\38

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

54 Explosive Availability

Measures the availability of explosives which is determined by the


quantity demanded vis a vis quantity offered for use.
Following scale to be adhered to for rating:
5- if the quantity of explosives made available is 91% or above of
the quantity demanded
4- if the quantity of explosives made available is between 81 to 90%
of the quantity demanded
3- if the quantity of explosives made available is between 71 to 80%
of the quantity demanded
2- if the quantity of explosives made available is between 61 to 70%
of the quantity demanded
1- if the quantity of explosives made available is less than 60% of
the quantity demanded

Quantity of explosives made


available (in kg.)
x 100
Quantity of explosives
demanded (in kg.)

55 Coal tub factor

Measures the efficiency with which tub is being used with regards to
the capacity of the tub.
Following scale to be adhered to for rating:
5- if the quantity of coal reported is 96% or above of the capacity of
the tub
4- if the quantity of coal reported is between 91 to 95% of the
capacity of the tub
3- if the quantity of coal reported is between 86 to 90% of the
capacity of the tub
2- if the quantity of coal reported is between 81 to 85% of the
capacity of the tub
1- if the quantity of coal reported is less than 80% of the capacity of
the tub

Actual tonnes of coal reported


x 100
Number of tubs reported
x Capacity of tub

Internal
Process

Mining\39

Quadrant

Internal
Process

No.

56

Key Performance Indicator

Maintenance of Logbook / Record


as per prescribed format

KPI Definition
Measures the number of actual entries that have been made in the
log book or records have been kept vis-e-vis the entries that are
required to be made in the logbook or records to be kept.
Following scale to be adhered to for rating:
5- if the actual number of entries available in the logbook is 91% or
above
4- if the actual number of entries available in the logbook is
between 81 to 90% of the required entries
3- if the actual number of entries available in the logbook is
between 71 to 80% of the required entries
2- if the actual number of entries available in the logbook is
between 61 to 70% of the required entries
1- if the actual number of entries available in the logbook is less
than 60% of the required entries

Formula

Number of actual entries that


have been made in the log book
or records that have been kept
properly
x 100
Number of entries that are
required to be made in the
logbook or records to be kept

Mining\40

Quadrant

No.

Key Performance Indicator

1 Vocational training index

Learning and
Growth

% Periodic medical examination


achievement rate

KPI Definition

Formula

Measures the % of achieved trained individuals, out of the total plant


trained individuals.
Following scale to be adhered to for rating:
5- if the number of employees provided refresher training is 100%
4- if the number of employees provided refresher training is
between 96% to 99% of the budgeted employees
3- if the number of employees provided refresher training is
between 91 to 95% of the budgeted employees
2- if the number of employees provided refresher training is
between 85 to 90% of the budgeted employees
1- if the number of employees provided refresher training is less
than 85% of the budgeted employees

Actual number of employees


provided refresher training
x 100
Budgeted number of employees
to be provided refresher training

Measures the % of employees who have been sponsored for periodic


medical examination relative to the targeted number of employees
to be sponsored. Following scale to be adhered to for rating:
5- if the number of employees sponsored is 91% or above of the
Number of employees sponsored
target
for periodic medical examination x 100
4- if the number of employees sponsored is between 81 to 90% of
the target
Targeted number of employees to
3- if the number of employees sponsored is between 71 to 80% of
be sponsored and examined for
the target
periodic medical examination
2- if the number of employees sponsored is between 61 to 70% of
the target
1- if the number of employees sponsored is less than 60% of the
target

Mining\41

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

3 New districts added

Measures the effectiveness with which the planned number of new


districts have been added in the production zone.
Following scale to be adhered to for rating:
5- if the number of new districts added is 91% or above of the
target
4- if the number of new districts added is between 81 to 90% of the
target
3- if the number of new districts added is between 71 to 80% of the
target
2- if the number of new districts added is between 61 to 70% of the
target
1- if the number of new districts added is less than 60% of the
target

4 Utilisation of capital budget

Measures the actual utilisation/expenditure against the provision.


Following rating scale to be adhered for rating :
5- If percentage is 91% and above
4- If percentage is between 81%-90%
3- If percentage is between 71%-80%
2- If percentage is between 71%-60%
1- If percentage is less than 60%

Actual utilization of budget


(in Rs.)
x 100
Allocated capital budget
(in Rs.)

5 % Utilisation of CSR budget

Measures the degree of delay in implementation of CSR initiatives


within the measurement period.
Following rating scale to be adhered for rating :
5- If percentage is 91% and above
4- If percentage is between 81%-90%
3- If percentage is between 71%-80%
2- If percentage is between 71%-60%
1- If percentage is less than 60%

Actual expenditure on CSR


(in Rs.)
x 100
Budgeted CSR amount
(in Rs.)

Learning and
Growth

Number of new districts added


Number of new districts x 100
planned to be added

Mining\42

Quadrant

No.

Key Performance Indicator

6 Non SAP/Oracle report generation

Learning and
Growth

KPI Definition

Measures the number of non SAP or Oracle reports getting


generated relative to planned number of reports to be generated.
Following rating scale to be adhered for rating :
5- if the number of reports generated is 91% or above of the
reports to be generated
4- if the number of reports generated is between 81 to 90% of the
reports to be generated
3- if the number of reports generated is between 71 to 80% of the
reports to be generated
2- if the number of reports generated is between 61 to 70% of the
reports to be generated
1- if the number of reports generated is less than 60% of the
reports to be generated"

Measures the percentage reduction in inventory of non moving


items (excluding non obsolete items & non insurance items) in
current year as compared to previous year.
Year on year reduction in mining
Following scale to be adhered to for rating:
related inventory of non moving
5- if the reduction in inventory is 10% or more
7
items (excluding non obsolete items 4- if the reduction in inventory is 7 to 9% or more
& non insurance items)
3- if the reduction in inventory is 4 to 6% or more
2- if the reduction in inventory is 1 to 3% or more
1- if the reduction in inventory is 0%

Formula

Number of reports generated


x 100
Number of reports to be
generated

Value of non moving items


(excluding non obsolete items &
non insurance items) in the start
of current year Value of non
moving items (excluding non
obsolete items & non insurance
items) at the end
of year / Closing value of non x 100
moving items (excluding non
obsolete items & non insurance
items) in previous year

Mining\43

Quadrant

No.

Key Performance Indicator

Year on year reduction in overall


mining related inventory

Learning and
Growth

9 Mine Capacity addition

KPI Definition

Formula

Measures the percentage reduction in overall inventory value in


current year as compared to previous year.
Following scale to be adhered to for rating:
5- if the reduction in inventory is 10% or more
4- if the reduction in inventory is 7 to 9% or more
3- if the reduction in inventory is 4 to 6% or more
2- if the reduction in inventory is 1 to 3% or more
1- if the reduction in inventory is 0%

Value of overall inventory


(excluding obsolete inventory)
in start of the current year
Value of overall inventory
(excluding obsolete inventory)
in end of the current year /
x 100
Value of overall inventory
(excluding obsolete inventory)
at the end of the previous year

Measures the enhancement in mine capacity over and above the


previous year capacity.
Following scale to be adhered to for rating:
5- if the capacity added in mines is 91% or above of the plan to be
added
4- if the capacity added in mines is between 81 to 90% of the plan
to be added
3- if the capacity added in mines is between 71 to 80% of the plan
to be added
2- if the capacity added in mines is between 61 to 70% of the plan
to be added
1- if the capacity added in mines is less than 60% of the plan to be
added

Additional capacity added in the


current year (million tonnes)
x 100
Mine capacity planned to be
added (million tonnes)

Mining\44

Quadrant

No.

Key Performance Indicator

KPI Definition

10 Coal Exposure Ratio

Measures the degree of exposed coal which is available at the year


end as compared to beginning of the year.
Note: Valid only for open cast mining.
Following scale to be adhered to for rating:
5- if the closing coal exposure is more than the opening exposure
ratio by more than 5%
4- if the closing coal exposure is more than the opening exposure
ratio by upto 5%
3- if the closing coal exposure is equal to the opening exposure
ratio (i.e. 100%)
2- if the closing coal exposure is less than opening exposure ratio
by upto 5%
1- if the closing coal exposure is less than the opening exposure
ratio by more than 5%

11 Physical possession of land

Measures the actual hectares of land which has been possessed


relative to the target given by head quarter.
Following scale to be adhered to for rating:
5- if the actual hectares of land possessed is 91% or above of the
target
4- if the actual hectares of land possessed is between 81 to 90% of
the target
3- if the actual hectares of land possessed is between 71 to 80% of
the target
2- if the actual hectares of land possessed is between 61 to 70% of
the target
1- if the actual hectares of land possessed is less than 60% of the
target

Learning and
Growth

Formula

Closing coal exposure ratio


x 100
Opening coal exposure ratio

Actual land possessed


(in hectares)
x 100
Targeted land to be
possessed (in hectares)

Mining\45

Quadrant

Learning and
Growth

No.

Key Performance Indicator

KPI Definition

Formula

12 Mine development

Measures the degree to which the pre-planned mine development


work has actually been implemented.
Following scale to be adhered to for rating:
5- if the actual number of milestones achieved is 91% or above vis a
vis the target
Actual number of milestones
4- if the actual number of milestones achieved is between 81 to
achieved
90% of the target
x 100
Target number of milestones to
3- if the actual number of milestones achieved is between 71 to
be achieved
80% of the target
2- if the actual number of milestones achieved is between 61 to
70% of the target
1- if the actual number of milestones achieved is less than 60% of
the target

13 % Land restoration (plantation)

Measures proportion of land surface that was rehabilitated to its


natural form by planting saplings in the backfilled & OB areas
Following scale to be adhered to for rating:
5- if the number of plants sowed is 91% or above of the target
4- if the number of plants sowed is between 81 to 90% of the target
3- if the number of plants sowed is between 71 to 80% of the target
2- if the number of plants sowed is between 61 to 70% of the target
1- if the number of plants sowed is less than 60% of the target

% Back filing of technically


14
reclaimed area

Measures the percentage of land which has been back filed after
coal has been extracted.
Following scale to be adhered to for rating:
5- if the volume of land back filled is 91% or above vis a vis the
target
4- if the volume of land back filled is between 81 to 90% of the
target
3- if the volume of land back filled is between 71 to 80% of the
target
2- if the volume of land back filled is between 61 to 70% of the
target
1- if the volume of land back filled is less than 60% of the target

Actual plantation (in number


per hectare)
Targeted plantation (in x 100
number per hectare)

Actual volume (mm cube) of


back filling
x 100
Targeted volume (mm cube) of
back filling as per EMP

Mining\46

Quadrant

No.

15

Key Performance Indicator

Implementation of new projects /


future projects

Learning and
Growth

Rehabilitation of Project affected


16
people (PAP)

KPI Definition

Formula

Measures the number of milestones that have been achieved for


new or future projects as against the planned number of milestones
to be achieved.
Following scale to be adhered to for rating:
5- if the number of milestones achieved is 91% or above of the
target
4- if the number of milestones achieved is between 81 to 90% of
the target
3- if the number of milestones achieved is between 71 to 80% of
the target
2- if the number of milestones achieved is between 61 to 70% of
the target
1- if the number of milestones achieved is less than 60% of the
target

Actual number of
milestones achieved
x 100
Target number of milestones
to be achieved

Measures the total number of families which have been shifted


relative to the targeted number of families.
Following scale to be adhered to for rating:
5- if the number of families rehabilitated is 91% or above of the
target
4- if the number of families rehabilitated is between 81 to 90% of
the target
3- if the number of families rehabilitated is between 71 to 80% of
the target
2- if the number of families rehabilitated is between 61 to 70% of
the target
1- if the number of families rehabilitated is less than 60% of the
target

Actual number of families


rehabilitated
x 100
Targeted number of families
planned to be rehabilitated

Mining\47

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

17 Scrap generation/collection

Measures the increase in the value of scrap being disposed off in


current year relative to the value of scrap disposed off in previous
year.
Following scale to be adhered to for rating:
5- if the scrap generated/collected in the current year is 2% or more
than the previous year
4- if the scrap generated/collected in the current year is 1% more
than the scrap generated/collected the previous year
3- if the scrap generated/collected in the current year is equal to
the scrap generated/collected the previous year
2- if the scrap generated/collected in the current year is less than
the scrap generated/collected the previous year
1- if no scrap has been generated

Value of scrap generated


in the current year
x 100
Value of scrap generated
in the previous year

18 Updation of employee skill

Measures the percentage of achieved training Mandays out of the


total planned training Mandays.
Following scale to be adhered to for rating:
5- if the employees released for training by HOD is 91% and above
4- if the employees released for training by HOD is between 81 to
90% of the required number of employees to be released
3- if the employees released for training by HOD is between 71 to
80% of the required number of employees to be released
2- if the employees released for training by HOD is between 61 to
70% of the required number of employees to be released
1- if the employees released for training by HOD is less than 60% of
the required number of employees to be released

Number of employees released


for trainings by the HOD
x 100
Total number of employees
nominated for trainings by
HRD

Learning and
Growth

Mining\48

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

19 Employee Satisfaction index

Measures the employees' engagement in their work activities and


responsibilities in terms of enthusiasm and commitment.
Following scale to be adhered to for rating:
5- if the number of employees giving a rating of 4 or 5 is 91% and
above of the total survey population
4- if the number of employees giving a rating of 4 or 5 is between
81 to 90% of the total survey population
3- if the number of employees giving a rating of 4 or 5 is between
71 to 80% of the total survey population
2- if the number of employees giving a rating of 4 or 5 is between
61 to 70% of the total survey population
1- if the number of employees giving a rating of 4 or 5 is equal to or
less than 60% of the total survey population

No. of employees giving a


rating of 4 or 5 on a 5 point
scale instrument
x 100
Total survey population

Mandays of training undergone by


20
each individual

Measures the number of mandays spent on training by each


individual relative to the nominated mandays to be spent on
training.
Following rating scale to be adhered for rating :
5- If percentage is 100%
4- If percentage is between 98%-99%
3-If percentage is between 96%-97%
2- If percentage is between 91%-95%
1- If percentage is less than 90%

Actual Mandays spent


on training
x 100
Total Mandays nominated
for training

Learning and
Growth

21

Reduction in fatality incidence


related to Mining Operation

Measures the degree to which adequate provisions were undertaken


to control the occurrence of fatalities.
Following scale to be adhered to for rating:
5- if the number of fatal incidents in current year is zero
1- if the number of fatal incidents in current year is 1 or more

Total number of fatalities per million


cubic metre of material (Coal and OB)
excavated in current year

Mining\49

Quadrant

No.

Key Performance Indicator

KPI Definition

Formula

Reduction in serious injury


22 incidence related to Mining
Operation

Measures the degree to which adequate provisions were undertaken


to control the occurrence of serious injuries.
Following scale to be adhered to for rating:
5- if the number of serious injury incidents in current year is zero
4- if the number of serious injury incidents in current year is less
Total number of serious injuries per
than previous year
million cubic metre of material (Coal and
3- if the number of serious injury incidents in current year is equal
OB) excavated in current year
to previous year
2- if the number of serious injury incidents in current year is more
than previous year
1- if the number of serious injury incidents in current year is double
than previous year

Reduction in reportable injuries


23
related to Mining Operation

Measures the degree to which adequate provisions were undertaken


to control the occurrence of reportable injuries.
Following scale to be adhered to for rating:
5- if the number of reportable injuries in current year is zero
4- if the number of reportable injuries in current year is less than
previous year
3- if the number of reportable injuries in current year is equal to
previous year
2- if the number of reportable injuries in current year is more than
previous year
1- if the number of reportable injuries in current year is double than
previous year

Learning and
Growth

Total number of reportable injuries


serious injuries per million cubic metre
of material (Coal and OB) excavated in
current year

Mining\50

Quadrant

No.

24

Key Performance Indicator

Year on Year reduction in average


cycle time of tendering

KPI Definition

Measures the relative efficiency with which the tendering process is


managed vis a vis the previous year

Learning and
Growth

Formula

a. Average number of days taken


between ""Date of receipt of
Approved Indent"" to ""Date of
signing of contract of purchase""
in the previous year - Average
number of days taken between
Date of receipt of Approved
Indent to Date of signing of
contract of purchase in the
current year
x 100
Average number of days taken
between ""Date of receipt of
Approved Indent"" to ""Date of
signing of contract of purchase""
in the previous year
b. Actual reduction % of average
cycle time of tendering
x 100
Targeted reduction % of average
cycle time of tendering

25 System capacity utilisation

Measures the degree to which the system capacity utilisation is


happening vis a vis the plan.
Following rating scale to be adhered for rating :
5- If percentage is between 91% -100%
4- If percentage is between 81%-90%
3- If percentage is between 71%-80%
2- If percentage is between 61%-70%
1- If percentage is 60% or less than 60%

Actual system capacity


utilisation (in %)
x 100
Targeted system
capacity utilisation (in %)

Mining\51