Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

HALLIBURTON

JOB SAFETY ANALYSIS

JOB TITLE:

Mobilize equipment
SUPERVISOR:

DATE:
07 JUNE 2005
REVISED
ANALYZED BY: FAHRIE

TOMMY PANGEMANAN

REGION / COUNTRY / OPERATIONAL


AREA

WELL NO. / LOCATION:


SAMBERAH 27

DEPARTMENT /
PSL
Cementing

SE Asia / Indonesia / Badak


Required Personal Protective Equipment :
Long Sleeve Coveralls, Hard Hat, Safety Shoes, Hand Gloves, Ear Plug, Safety Goggles
SEQUENCE OF JOB STEPS

POTENTIAL HAZARDS

1. Loading equipment and supplies to


vehicle at Badak Hallco Shop.

Equipment falling from vehicle


Equipment being mishandled
Personnel injury carrying equipment and
supplies

2. Mobilising to location

Equipment breaking-up on the lifting and


damaging other items or injuring personal
Personnel or equipment damage due to
incorrect use of slings
Equipment not correctly fastened down
inside unit
Loss of equipment or damage due to
movement during transport.

Injury to personnel or colliding other


equipment

APPROVED BY:
RECOMMENDED ACTION OR
PROCEDURE

Ensure that all equipment is secured


Mark all fragile equipment
All equipment and supplies to have weight
clearly masker. Ask for help to carry load
that are too heavy for one person.

Only correctly rated and certified shackle


to be used.
Only certified lifting slings are to be used
and all items are to be pre-slung
Make sure all non-fixed equipment is
fastened down prior to leaving base.
Secure all small and loose items in Basket
or tool boxes
Conduct regular safety inspection on good
being transported

3. Set unit and Rig up line

REVIEWED BY:
ADE TATANG

Guide the truck driver into position while


reversing on location
Be careful in connecting line and
hammering the connection

You might also like