Professional Documents
Culture Documents
K-Plan - EE
K-Plan - EE
K - Plan
Electrical Engineering
A 3 Month Study Plan
Advantages of K - Plan
Other Kreatryx
Offerings
K - Notes
Kuestion
Encourages you to focus more on Problem Solving which increases your chances of scoring really good in the final exam
Kourse
Join Us
www.kreatryx.com
www.facebook.com/kreatryx
K - Plan
Topic Relevance
(Last 6 Years Average)
LTI Systems
Fourier Series
Laplace Transform
Z-Transform
Fourier Transform
Sampling
Signals
Kuote
11/15/14
Laplace Transform
11/16/14
Fourier Series
11/17/14
Fourier Transform
11/18/14
Z-Transform
11/19/14
Sampling
11/20/14
Topic Relevance
(Last 6 Years Average)
Frequency Response
Basics
Stability
Time Response
Root Locus
Control Design
Basics + Stability
11/21/14
Time Response
11/22/14
Frequency Response
11/23/14
Frequency Response +
Control Design
11/24/14
11/25/14
Root Locus
11/26/14
www.kreatryx.com
www.facebook.com/kreatryx
K - Plan
11/27/14
11/28/14
11/29/14
11/30/14
Transient Response
12/1/14
12/2/14
2-port Network
12/3/14
Graph Theory +
Magnetically Coupled Circuits
Topic Relevance
(Last 6 Years Average)
Circuit Analysis
Inductors and
Capacitors
Transient Response
2-Port Network
3 Phase Circuits
12/4/14
www.kreatryx.com
www.facebook.com/kreatryx
K - Plan
12/6/14
DC Machines
12/7/14
Induction Motor
Transformer
Synchronous Machines
12/8/14
DC Machine
Synchronous Machines
12/9/14
Synchronous Machine
Induction Motor
12/10/14
Special Machines
Induction Motor +
Special Machines
12/11/14
Kuote
Topic Relevance
(Last 6 Years Average)
Load Flow
Transmission Lines
Fault Analysis
Fundamentals
Stability
UG Cables
Insulators
Protection
Distribution Systems
www.kreatryx.com
Fundamentals +
Load Flow
12/12/14
Transmission Lines
12/13/14
UG + Insulators +
Distribution Systems
12/14/14
12/15/14
Fault Analysis
12/16/14
12/17/14
Stability
12/18/14
www.facebook.com/kreatryx
K - Plan
Kuote
Try to Finish 1st Round of Paper within 140 minutes. Dedicate the
next 40 minutes to attempt the unsolved questions and review
www.kreatryx.com
www.facebook.com/kreatryx
K - Plan
Topic Relevance
#06 Measurement
Measurement & Error
12/20/14
Electromechanical Instruments
12/21/14
Electromechanical Instruments
+ Instrument Transformer
12/22/14
AC and DC Bridges
12/23/14
Electromechanical
Instruments
AC and DC Bridges
CRO
12/24/14
12/25/14
Kuote
#07 Maths
Topic Relevance
(Last 6 Years Average)
Probability
Linear Algebra
Calculus
Complex Variable
Vector Calculus
Stability
Numerical Methods
12/26/14
Linear Algebra
12/27/14
Complex Variable
12/28/14
Probability
12/29/14
Probability +
Numerical Methods
12/30/14
Differential Equations
12/31/14
www.kreatryx.com
www.facebook.com/kreatryx
K - Plan
Topic Relevance
(Last 6 Years Average)
Power Semiconductor
Devices
Choppers
Rectifier
Inverter
AC and DC Drives
Kuote
1/2/15
Rectifier
1/3/15
Choppers
1/4/15
Choppers
1/5/15
Inverter
1/6/15
AC and DC Drives
1/7/15
Topic Relevance
(Last 6 Years Average)
OP-Amp
Sequential Logic
Circuits
Combinational Logic
Circuits
Microprocessor
Diode
BJT
Filters
Diode
1/8/15
BJT
1/9/15
OP-Amp
1/10/15
MOSFET
1/11/15
1/12/15
1/13/15
1/14/15
Microprocessor
1/15/15
Microprocessor + Filters
1/16/15
www.kreatryx.com
www.facebook.com/kreatryx
K - Plan
Details
GATE Helpline
Tentatively available from
20th December to
30th January.
Via Mail
Via FB Group -
GATE Helpline*
12/20/14 - 1/30/15
K - Test 1*
1/18/15
1/19/15
K - Test 2
1/20/15
1/21/15
K - Test 3
1/22/15
1/23/15
Revision*
1/24/15 - 1/30/15
GATE Aspirants
K - Test
A Must Give Test for serious
GATE Aspirants based on
latest GATE Pattern and Previous Year GATE Analysis. Questions are hand-picked by the
GATE Toppers to create an
Kuote
Kreatryx
K - Test Analysis
Phone: 555-555-5555
GetFax:
recommendations
from
555-555-5555
theE-mail:
GATEsomeone@example.com
Topper based on
your performance in K - Test.
Also know your potential
GATE 2015 AIR.
Revision
K - Notes + Chapter Test + Full
Mock Test + Analysis +
Kuestion
Kuote
www.kreatryx.com
www.facebook.com/kreatryx