Professional Documents
Culture Documents
Análisis de Fundaciones Sometidas A Carga Axial y Flexión Biaxial - v1
Análisis de Fundaciones Sometidas A Carga Axial y Flexión Biaxial - v1
Análisis de Fundaciones Sometidas A Carga Axial y Flexión Biaxial - v1
PROYECTO:
AREA:
TTULO:
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 1 de 9
FERNADO YVENES U.
Ing. Civil/Estructural
CLCULOS Y ESQUEMAS
.
1.0 DESCRIPTION:
BEARING PRESSURES FOR RECTANGULAR FOOTINGS WITH BIAXIAL UPLIFT.
Purpose
The purpose of this calculation sheet is to solve for design parameters of a footing, which will result in easier
design of footing. The footing is subject to axial load and bearing (biaxial moment). The footing can have a
portion of their footing area that does not act in bearing.
The parameters calculated are:
Combined Forces and Moment at centroid of footing.
Soil bearing pressure.
Maximum bearing pressure.
Bearing pressure at remaining foundation corners.
Location of line of zero pressure.
Percentage of footing area acting in bearing.
Factors of Security (Overturning and Sliding).
Assumptions
The following assumptions are made in the derivation of the results presented in this calculation sheet:
The foundation is rectangular.
The foundation behaves as a rigid body.
The foundation has a planar stress distribution, and the location of zero pressure is therefore linear.
The bearing pressure can only be compressive in nature, and there are no tensile bearing stresses.
Referees
"Bearing Pressures For Rectangular Footings With Biaxial Uplift " by Kenneth E. Wilson. Journal of Bridge
Engineering / February 1997.
Materials
Concrete
Soil
fy := 4200
fc := 300
q all := 40
kgf
cm
E := 29000ksi
kgf
cm
Ec := 15100 fc
tonf
Esoil := 9000
q all.quake := 52
tonf
m
FSslidingall := 1.5
D:\My Documents\FYEVENES\PERSONAL
c := 1
tonf
2
FSOTall := 2
kgf
cm
tonf
2
c := 2.40
tonf
3
soil := 1.82
tonf
3
:= 38deg
soil := 0.2
%InContactall := 80%
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 2 de 9
FERNADO YVENES U.
Ing. Civil/Estructural
CLCULOS Y ESQUEMAS
.
2.0 INPUT DATA:
M yy
Y
Ly
ey
M xx
X
ex
Lx
Length along X axis
Lx := 7m
Ly := 6m
Footing centroid
Lx
CGx :=
1.664m
2
CGy := 0m
BOF := 2672.675m
TOP := 2679.553m
Grade := 2678.475m
Thickness of footing
FootingThickness := 1.1m
CGx = 1.84 m
FootingWeight := c FootingThickness Lx Ly
FootingWeight = 110.88 tonf
Soil thickness above footing SoilAboveFooting := Grade BOF FootingThickness
SoilAboveFooting = 4.70 m
SoilWeight := soil SoilAboveFooting Lx Ly
==>
NoOfPedestal := 1
Total No of loads
NoOfLoad := 12
NoOfComb := 31
D:\My Documents\FYEVENES\PERSONAL
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
FERNADO YVENES U.
Ing. Civil/Estructural
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 3 de 9
CLCULOS Y ESQUEMAS
Pedestal coordinates
Pedestal
No.
1
Joint
No.
1
Coordinates [m]
X
Y
0.00
0.00
Loads on pedestal
Load
DL
DLe
LL
LLo
LLr
CL
WLx
WLy
ELx
ELy
ELz
TL
Joint
No.
15
15
15
15
15
15
15
15
15
15
15
15
P
84.83
17.64
3.81
1.50
21.45
1.83
-2.24
-8.44
-4.63
11.92
15.59
0.43
Forces [tonf]
Vx
-115.59
-19.30
-6.07
-2.42
-29.17
-2.85
8.01
4.93
8.14
-20.31
-20.01
-11.59
Vy
6.08
3.47
0.12
0.35
1.68
0.68
17.87
6.23
7.70
3.91
1.55
17.77
Moments [tonf-m]
Mxx
Myy
3.55
0.00
2.03
0.00
0.07
0.00
0.21
0.00
0.98
0.00
0.40
0.00
10.52
0.00
3.67
0.00
4.53
0.00
2.30
0.00
0.91
0.00
10.34
0.00
D:\My Documents\FYEVENES\PERSONAL
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 4 de 9
FERNADO YVENES U.
Ing. Civil/Estructural
CLCULOS Y ESQUEMAS
Combination factors
Comb
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DL
1.00
1.00
0.75
0.75
0.75
0.75
0.75
0.75
0.68
0.68
0.68
0.68
0.75
0.75
0.67
0.67
0.75
0.75
0.75
0.75
0.75
0.75
0.68
0.68
0.68
0.68
0.67
0.67
0.75
0.75
0.75
DLe
1.00
1.00
0.75
0.75
0.75
0.75
0.75
0.75
0.68
0.68
0.68
0.68
0.75
0.75
0.67
0.67
0.75
0.75
0.75
0.75
0.75
0.75
0.68
0.68
0.68
0.68
0.67
0.67
0.75
0.75
0.75
LL
LLo
LLr
1.00
0.75
0.75
0.75
0.75
0.75
1.00
0.75
0.75
0.75
0.75
0.75
1.00
0.75
Loads
CL
WLx
WLy
ELx
ELy
ELz
0.75
0.75
-0.75
-0.75
0.75
-0.75
0.75
-0.75
0.75
0.75
-0.75
-0.75
0.75
-0.75
0.75
-0.75
TL
0.75
0.38
0.75
0.75
0.67
0.67
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.67
0.67
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.67
0.67
0.75
0.75
-0.75
0.67
-0.67
0.67
0.67
0.75
0.75
0.75
-0.75
-0.75
0.75
-0.75
0.75
-0.75
0.75
0.75
-0.75
-0.75
0.75
-0.75
0.75
-0.75
0.38
0.67
0.67
0.75
0.75
0.75
0.67
0.67
0.75
0.75
0.75
0.67
0.67
0.75
0.75
0.75
0.67
0.67
0.75
0.75
0.75
0.67
-0.67
0.75
-0.75
where,
DL
LL
CL
WL
EL
TL
D:\My Documents\FYEVENES\PERSONAL
: dead load
: live load
: crane load
: wind load
: earthquake load
: temperature load
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
FERNADO YVENES U.
Ing. Civil/Estructural
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 5 de 9
CLCULOS Y ESQUEMAS
Pedestal data
3.5
3.5
3.0 CALCULATIONS:
Calculations
Pedestal coordinates
Pedestal
No.
1
D:\My Documents\FYEVENES\PERSONAL
Joint
No.
1
Coordinates [m]
X
Y
1.84
0.00
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 6 de 9
FERNADO YVENES U.
Ing. Civil/Estructural
CLCULOS Y ESQUEMAS
D:\My Documents\FYEVENES\PERSONAL
P
572.62
599.38
560.74
571.62
548.23
553.74
530.35
543.84
559.95
536.56
542.07
518.68
567.39
566.75
551.37
550.79
565.39
559.20
535.82
566.15
542.76
546.16
547.54
524.15
554.48
531.10
555.52
554.94
568.44
568.77
568.12
Forces [tonf]
Vx
-134.89
-172.55
-125.72
-137.78
-107.76
-107.31
-77.30
-99.32
-121.29
-91.28
-90.83
-60.81
-138.11
-120.72
-120.07
-104.54
-123.41
-116.44
-86.42
-128.65
-98.63
-98.16
-99.95
-69.94
-112.16
-82.15
-118.01
-102.48
-131.55
-140.24
-122.86
Vy
9.55
11.70
13.45
11.61
9.29
5.75
3.42
9.50
10.54
8.22
4.68
2.35
22.10
-4.55
23.92
0.11
22.18
14.45
12.13
2.90
0.58
13.86
13.38
11.06
1.83
-0.49
31.72
7.91
9.29
22.61
-4.04
Moments
Mxx
71.26
87.31
100.37
86.66
69.30
42.87
25.51
70.89
78.68
61.32
34.89
17.53
164.91
-33.94
178.48
0.85
165.56
107.88
90.52
21.64
4.29
103.48
99.90
82.54
13.66
-3.69
236.71
59.08
69.29
168.71
-30.13
[tonf-m]
Myy
-739.64
-949.53
-698.34
-761.32
-597.81
-584.61
-421.10
-547.82
-669.37
-505.86
-492.65
-329.15
-771.34
-652.95
-676.73
-570.97
-673.91
-637.35
-473.84
-708.58
-545.07
-535.61
-545.40
-381.89
-616.62
-453.12
-654.91
-549.15
-724.33
-783.53
-665.14
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 7 de 9
FERNADO YVENES U.
Ing. Civil/Estructural
CLCULOS Y ESQUEMAS
q0
q1
q2
D:\My Documents\FYEVENES\PERSONAL
Comb
NBC
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
2
2
3
2
3
4
4
4
3
4
4
4
3
3
3
4
3
3
4
2
4
3
3
4
4
4
3
4
2
3
3
q0
30.55
37.36
30.19
31.58
26.91
26.14
21.83
25.82
28.94
24.56
23.79
19.48
34.00
27.63
31.62
24.79
31.45
28.96
24.58
28.52
24.15
26.40
26.55
22.24
26.11
21.98
32.79
25.83
29.82
34.47
27.83
qmax
30.55
37.36
30.19
31.58
26.91
26.14
21.83
25.82
28.94
24.56
23.79
19.48
34.00
27.63
31.62
24.79
31.45
28.96
24.58
28.52
24.15
26.40
26.55
22.24
26.11
21.98
32.79
25.83
29.82
34.47
27.83
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 8 de 9
FERNADO YVENES U.
Ing. Civil/Estructural
CLCULOS Y ESQUEMAS
q max = 37.36
q net = 48.74
tonf
2
tonf
2
NBC
%InContact
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
2
2
3
2
3
4
4
4
3
4
4
4
3
3
3
4
3
3
4
2
4
3
3
4
4
4
3
4
2
3
3
94.42
81.82
95.49
92.56
99.60
100.00
100.00
100.00
97.44
100.00
100.00
100.00
90.21
99.52
93.82
100.00
95.24
97.95
100.00
96.34
100.00
99.93
99.89
100.00
100.00
100.00
93.28
100.00
95.23
89.47
99.23
Factor of Safety
Sliding
OTx
2.24
24.11
1.80
20.59
2.35
16.76
2.18
19.79
2.71
23.73
2.75
38.75
3.68
62.37
2.92
23.01
2.45
21.35
3.14
26.25
3.19
46.61
4.59
88.76
2.14
10.32
2.50
50.10
2.39
9.27
2.82
100.00
2.39
10.25
2.54
15.55
3.29
17.76
2.33
78.47
2.95
100.00
2.95
15.83
2.90
16.44
3.98
19.05
2.64
100.00
3.47
100.00
2.41
7.04
2.88
28.18
2.28
24.61
2.11
10.11
2.46
56.57
OTz
2.71
2.21
2.81
2.63
3.21
3.32
4.41
3.47
2.93
3.71
3.85
5.52
2.57
3.04
2.85
3.38
2.94
3.07
3.96
2.80
3.49
3.57
3.51
4.80
3.15
4.10
2.97
3.54
2.75
2.54
2.99
%InContactmin = 81.82 %
FSslidingmin = 1.80
FSOTx.min = 7.04
(
(
D:\My Documents\FYEVENES\PERSONAL
)
)
FSOTz.min = 2.21
Doc. No.____________________
CLIENTE:
PROYECTO:
AREA:
TTULO:
FERNADO YVENES U.
Ing. Civil/Estructural
Fecha: 27-12-2006
Contrato No.________
Por: _____ Rev: _____
Pg. No. 9 de 9
CLCULOS Y ESQUEMAS
.
4.0 RESULTS:
( (
)
)
(
)
if ( min( FSsliding) < FSslidingall , "X" , "ok" ) = "ok"
if ( min( FSOTx ) < FSOTall , "X" , "ok" ) = "ok"
if ( min( FSOTz) < FSOTall , "X" , "ok" ) = "ok"
D:\My Documents\FYEVENES\PERSONAL
Doc. No.____________________