Jamb Bars
& lapping
‘LU bars \
Z Concrete in open perpend poured against closed
perpend
Closed perpend unit
20 dia capped dowel 600 long
f
Joint: Polystyrene is compressible | S55! \
Ensure finish has min 20 gap 200™m@x
PLAN A-A
_- 20 dia dowel is a plain bar, greased,
ends deburred, capped with uPVC.
conduit sealed one end, 50 mm
A clear at bar end for compression
\
=== ___ Bearing, steel trowel
finish top of
jamb then 2 sheets,
greased gi
i Actltiong| 1Y12barineach |
B ars. B core adjacent to
a joint. No starters
or top 'L' bars req'd
Jamo 1 \
bars as
req'd for |
specie —
wind load, ___-_—"]
, 1yi2
placed one (Ne seer
core back tarred)
from jamb Y Joint: Polystyrene is compressible “|
Lap with \ Ensure finish has min 20 gap
Starters and
‘Lars at top ‘pe
DETAIL 'B' from DWG 04-02)
PLAN B-B
DETAIL ‘A’ from DWG 04-02
Suitable for Use in Mine Subsidence Areas and Problem
Soils, where approved by the Building Authority.
ARTICULATED CONSTRUCTION - DETAILS
ZEGO "MAGU" ICF's IN DOMESTIC
ZEGO |_STRUCTURES 1:10
~____ | ZEGO Pty Limited Dwg No 04-03
nsuisted Concrete Forms (CF 8}! RS HEMPHILL PTY LTD CONSULTING ENGINEERS ABN 99705 451 917
ponent DATE _ April 02 PROJECT No 02 ISSUE No_A