PARTICAL TRAINING SCHEDULE

DATE
12/23/2014

12/24/2014

12/25/2014
12/26/2014

AGENDA
On Boarding Day
Data Verification
HR Presentation
On Boarding Day
HR Presentation
Introduction to Mentor & TSW Team
OTP & WTP Review
Pump & Hydrolic Analysis
Chemical Process at PT CPI Indonesia

12/27/2014
12/28/2014

12/30/2014

Make A Schedule
Introduction about Tank and Vessel
Pump Specification
Separator Review
First Tasks Report
Facility Sitting Assesment for CGS
Facility Sitting Assesment for CGS

12/31/2014

Facility Sitting Assesment for CGS

1/1/2015

Facility Sitting Assesment for CGS

1/2/2015

Hydraulic Analisys Overview

12/29/2014

PLACE
HR Rumbai

HR Duri
Teladan Office
Teladan Office
Teladan Office
Teladan Office
Talang 209
Talang 209

Teladan Office

1/3/2015
1/4/2015

Pressure Vessel and Tanks Overview

1/5/2015

Overview About Spesific Process on Oil Treatment


Plant

Piping and Pipe Line System Overview

Spesification About The Equipment Proses OTP


1/6/2015

Site Visit
Overview About Spesific Process on Water
Treatment Plant
Spesification About The Equipment Proses WTP

1/7/2015
1/8/2015

1/9/2015

1/10/2015
1/11/2015

1/12/2015

1/13/2015

Job Assignment 2
Job Assignment 2
Heat and Material Balance Overview
Job Assignment 2
Process Calculation of Piping and Pipe Line Sizing
Overview
Job Assignment 2
Hydraulic Analisys Overview (with Software
Pipephase )
Pump, Compressor, and Air Fin Cooler
Hydraulic Analisys Overview (with Software Pipe
Flow, Pipesym and Pipephase )
Job Assignment 3
Flow Assurance
Site Visit
Job Assignment 3

Process Calculation of Separator (Pressure Vessel)


Sizing (with Software HYSYS)
1/14/2015

1/16/2015
1/17/2015
1/18/2015

Job Assignment 3
Process Calculation of Pump and Compressor (with
Software Hysys)
Job Assignment 3
HES
Job Assignment 3
Preparing for Final Project Presentation
Preparing for Final Project Presentation

1/19/2015

Preparing for Final Project Presentation

1/20/2015

Preparing for Final Project Presentation

1/21/2015
1/22/2015
1/23/2015

Final Project Presentation

1/15/2015

Duri, 29 Desember 2014


Prepared by,

Rahma Pradis

Pipit Aditia Listiyani

ING SCHEDULE

RESULT
Completed

MENTOR
Bimo and Elwin Nasution

Completed

Ngadio

Completed

Murdiyono
-

Process Flow Diagram


Brief knowledge of pump specification
Brief knowledge of chemical process

Murdiyono

Completed

Jundan R Fathoni

Sukirman

Approved by,

Murdiyono