Partical Training Schedule: Date Agenda Place
Partical Training Schedule: Date Agenda Place
DATE
12/23/2014
12/24/2014
12/25/2014
12/26/2014
AGENDA
On Boarding Day
Data Verification
HR Presentation
On Boarding Day
HR Presentation
Introduction to Mentor & TSW Team
OTP & WTP Review
Pump & Hydrolic Analysis
Chemical Process at PT CPI Indonesia
12/27/2014
12/28/2014
12/30/2014
Make A Schedule
Introduction about Tank and Vessel
Pump Specification
Separator Review
First Tasks Report
Facility Sitting Assesment for CGS
Facility Sitting Assesment for CGS
12/31/2014
1/1/2015
1/2/2015
12/29/2014
PLACE
HR Rumbai
HR Duri
Teladan Office
Teladan Office
Teladan Office
Teladan Office
Talang 209
Talang 209
Teladan Office
1/3/2015
1/4/2015
1/5/2015
Site Visit
Overview About Spesific Process on Water
Treatment Plant
Spesification About The Equipment Proses WTP
1/7/2015
1/8/2015
1/9/2015
1/10/2015
1/11/2015
1/12/2015
1/13/2015
Job Assignment 2
Job Assignment 2
Heat and Material Balance Overview
Job Assignment 2
Process Calculation of Piping and Pipe Line Sizing
Overview
Job Assignment 2
Hydraulic Analisys Overview (with Software
Pipephase )
Pump, Compressor, and Air Fin Cooler
Hydraulic Analisys Overview (with Software Pipe
Flow, Pipesym and Pipephase )
Job Assignment 3
Flow Assurance
Site Visit
Job Assignment 3
1/16/2015
1/17/2015
1/18/2015
Job Assignment 3
Process Calculation of Pump and Compressor (with
Software Hysys)
Job Assignment 3
HES
Job Assignment 3
Preparing for Final Project Presentation
Preparing for Final Project Presentation
1/19/2015
1/20/2015
1/21/2015
1/22/2015
1/23/2015
1/15/2015
Rahma Pradis
ING SCHEDULE
RESULT
Completed
MENTOR
Bimo and Elwin Nasution
Completed
Ngadio
Completed
Murdiyono
-
Murdiyono
Completed
Jundan R Fathoni
Sukirman
Approved by,
Murdiyono