Professional Documents
Culture Documents
Sample Computation 10
Sample Computation 10
1. Duration of Violation
2. Present Condition of the water
Land, or other places affected
3. Capacity of Source
4. Average deviation from effluent
6.5 points
5.5 points
4.5 points
3.5 points
===
20.0 points
1
3
5
Slight
Moderate
Gross
Moderate
Slight
Points
1
2
3
4
5
Fines/Day
500.00
1,000.00
1,500.00
2,000.00
2,500.00
3,000.00
3,500.00
4,000.00
4,500.00
5,000.00
Fines
Schedule of fines * total number of days of violation = Amount of Fines
Example:
Period of Violation: 06 July 1989 to 08 October 1990
= 387 days (> 1 year) = 3 points
Stream Classification:
Tullahan River = Class C =
Pollution load:
Suspended Solid: 110 mg/L
vs. 70 mg/L (std)
= 44% of the standard
Wastewater discharge per day
=
688 m3
1. Duration of Violation
2. Present Condition of the water
Land, or other places affected
3. Capacity of Source
4. Average deviation from effluent
19.5
Total Points =
Fines (61 70 points)
61 points
P3,500 per day
Amount of Fines:
387 days * PhP3500.00/day
5.5
18
17.5
======
60.5 points
PhP1,354,500.00