Cost of Quality Worksheet: Classification Examples # Totals Prevention Costs

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Cost of Quality Worksheet

Department:

Date:

Classification
Prevention Costs

Examples

Audits Hours spent on process, procedure audits

Units

Totals

Hrs.

$0.00

Training Both trainer and trainee hours for OJT, hours for SPC classes

Hrs.

$0.00

Specialist - Engineer Hours spent on FMEA, control clans, capability studies, gage
APQP R&Rs, layouts, related quality issues

Hrs.

$0.00

Continuous Improvement

Hrs.

$0.00

Hours spent on DOEs, reliability studies, constraints analysis,


process improvements
Total Prevention Costs

$0.00

Appraisal Costs
Inspection cost Hours spent on Receiving, Set-up, First piece, IPI, Final
Inspection, Dock audits, Regular sorting

Hrs.

$0.00

Vision Systems Hrs spent monitoring and loading/unloading the system

Hrs.

$0.00

Hrs.

$0.00

Total hours of normal operation of all vision systems


Dollars spent on repair/maint.- enter dollar amount
Testing Hours spent on required testing (torque, compression etc)
Measuring Hours spent on measurements (calipers, Micro-vu,
micrometers, optical comparitors, viscosity etc)
Charting Hours spent on SPC, process charting
Total Appraisal Costs

$0.00
Hrs
Hrs

$0.00
$0.00

Hrs

$0.00
$0.00

Hours spent cleaning, re-working, re-packing


Cost of scrap - enter dollar amount
Additional sorting, inspection
Additional hours for re-running
Cost of tooling/machine repair - enter dollar amount

Hrs

$0.00
$0.00
$0.00
$0.00
$0.00

Hours spent cleaning, re-working, re-packing

Hrs

Failure Costs
Internal
Rework
Scrap
Inspection
Vision System
Repair
External
Rework

Shipping Cost of return and re-shipping including re-packaging - enter


dollar amount
Inspection Additional sorting, inspection
Vision System Additional hours for re-running
Scrap Cost of scrap - enter dollar amount
Failure Costs
Back charges Dollar amount charged by the customer for the failure
Loss of Goodwill Enter total # of CCRs for the month
Total Cost of Quality
Total Number of Returned Parts

Hrs
Hrs

$0.00
$0.00

Hrs

$0.00

Hrs

$0.00

CCRs

$0.00
$0.00
$0.00
$0.00
$0.00

Prevention Costs
Appraisal Costs
Failure Costs

0
0
0
0
0
0

Back charges
Loss of Goodwill
Total Cost of Quality

Monthly Cost of Quality


1
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
Prevention
Costs

Appraisal
Costs

Failure Costs

Back charges

Loss of
Goodwill

You might also like