Transition From Construction To Commissioning
Transition From Construction To Commissioning
Transition From Construction To Commissioning
Tight schedule: margins are usually eaten up by upstream project phases and little float to cope
with unexpected events
What is Pre
Pre-Commissioning
Commissioning and
Commissioning?
Non-operating adjustment adjustments and cold alignment checks (such as cleaning, drying and testing
without introducing process and auxiliary fluids prior to equipment energization )
Pre-startup, check-out, system adjustment, equipment and system activation activities to prepare
system(s) and/or facilities for operation (by introducing auxiliary fluids and with equipment energization)
Group of
Systems
y
Completion
System Completion
Preparation
& Data
Validation
Perform
f
iinspection
i andd
test requirement
Measure progress.
Punch-Out &
Acceptance
Perform (pre)
commissioning
inspection and test.
Measure progress.
E
Engineering
g
Area Driven
Construction
Group of Systems
Completion
Punch-Out
&
Acceptance
TOS
List
Test
Pack
Punch
List
i
Initial
Walkdown
Pre Commissioning
Pre-Commissioning
Commissioning
Final
Walkdown
Punch List
MC
TOD
Check-out
Testing
TOS
Self-contained portion of a facility/system for hand over
(Turn Over System)
TOS
Test Package
TOS
Test Package
Punch List
TOS
Test Package
Punch List
Initial Walkdown
TOS
Test Package
Punch List
Initial Walkdown
Final Walkdown
& Punch List
TOS
Test Package
P
Punch
h List
Li t
F
Formal
l inspection
i
ti and
d id
identification
tifi ti off remaining
i i outstanding
t t di works
k
Initial Walkdown
Final Walkdown
& Punch List
TOD
Final dossier including all applicable as-built engineering documents and
(Turn Over Dossier) construction certificates as per Inspection & Test Plan attesting the
readiness for
f turn over
Milan. Italy, Ooctober 12, 2012
TOS
Test Package
Punch List
Initial Walkdown
Final Walkdown
& Punch List
TOD
Breakdown of Systems
System
y
Process
Standard
Systems
Systems
Sub-Systems
Sub-Systems
Disciplines
Disciplines
SYSTEMNUMBER
RUNNING
05.41BS10/8/3
05.41-BSC10/8/3
05 41-CAI
05.41-CAI
010
011
012
DESCTRIPTION
BLACKSTEAM
CONDENSATE
CAI
TOSSUBSYSTEM
TOSDESCRIPTION
AREA
TOS05.41BS10001
BLACKSTEAM10BARBASEMENT
BASEMENT
TOS05.41BS8001
BLACKSTEAM8BARDISTR.BASEMENT
BASEMENT
TOS05.41BS3001
BLACKSTEAM3BARDISTR.BASEMENT
BASEMENT
TOS05.41BS3002
BLACKSTEAM3BARDISTR.BULK1
BULK1
TOS05.41BS3003
BLACKSTEAM3BARDISTR.BULK2
BULK2
TOS05.41BS3004
BLACKSTEAM3BARDISTR.STERILEFILTRATION
STERILEFILTRATION
TOS05.41BS3005
BLACKSTEAM3BARDISTR.CASA
CASA
TOS05.41BSC10001
CONDENSATE10BARBASEMENT
BASEMENT
TOS05.41BSC8001
CONDENSATE8BARBASEMENT
BASEMENT
TOS05.41BSC3001
CONDENSATE3BARBASEMENT
BASEMENT
TOS05.41BSC3002
CONDENSATE3BARBULK1
BULK1
TOS05.41BSC3003
CONDENSATE3BARBULK2
BULK2
TOS05.41BSC3004
CONDENSATE3STERILEFILTRATION
STERILEFILTRATION
TOS05.41BSC3005
CONDENSATE3BARBULK2
CASA
TOS05.41CAI001
CAI10BARDISTRIBUTIONBASEMENT
BASEMENT
TOS05.41CAI002
CAI10BARDISTRIBUTIONBULK1
BULK1
TOS05
TOS
05.41
41CAI003
CAI 003
BULK 2
BULK2
TOS05.41CAI004
CAI10BARDISTRIBUTIONCASA
CASA
TOS05.41CAI005
CAI12BARGENER.ANDDISTR.CASA
CASA
Date
28-apr-12
TOTAL
CONTRACTOR or
VENDOR
NO GR.
To Close
To Close
To Close
To Close
To Close
Closed
Hold
CONTRACTOR # 1
CONTRACTOR # 2
CONTRACTOR # 3
CONTRACTOR # 4
CONTRACTOR # 5
CONTRACTOR # 6
CONTRACTOR # 7
CONTRACTOR # 8
CONTRACTOR # 9
VENDOR #1
VENDOR #3
VENDOR #4
VENDOR #5
VENDOR #6
VENDOR #7
VENDOR #8
43
117
3
17
13
28
60
0
0
23
4
49
29
48
0
0
88
100
32
89
59
135
58
0
0
10
0
18
11
21
0
0
6
23
0
12
8
15
8
0
0
1
0
0
0
0
0
0
1
43
0
4
0
0
0
13
1
0
0
0
0
0
0
16
138
283
35
122
80
178
126
13
1
34
4
67
40
69
0
16
301
23
0
232
336
248
106
0
0
27
6
33
38
31
28
87
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
434
621
73
78
1206
1496
1180
1341
105
188
TOT
2814
Project 1
Project 2
Project 3
Project 4
350
340
140
250
37
13
Isometrics
3,400
4,000
22,000
1,500
Test packs
1,000
1,500
7,000
600
Inst Tags
3,500
4,200
17,000
5,000
Loop Dossiers
600
850
4,750
2,000
Check Sheets
60 000
60,000
50 000
50,000
200 000
200,000
45 000
45,000
Systems
Units
S d di d preparation
Standardised
i ffor mechanical
h i l completion
l i and
d commissioning
i i i
C ti
Continuous
and
d auditable
dit bl progress measurementt (physical
St t d and
Structured
d certified
tifi d h
handover
d
ffor allll disciplines
di i li
Controlling tool for the creation and management of all QC and MC forms
vs. QC achievements)
At initial phase of engineering, each physical Object of the plant subject to a control:
shall be defined in case it does not represent an object (e.g: Hydrotest Circuit, Loop Folder, etc)
1st Level
Systems
2nd Level
Sub-Systems
3rd Level
Disciplines
4th Level
TAGs
Project
Engineering
Disciplines
Instrument:
Instrument List
Cable List
Fire & Gas
More
Piping:
Line List
ISO List
Hydro Test Pack
Equipment:
Rotating
Pressure Vessels
Heat Exchanger
More
Electrical:
Cable List
Equipment List
Grounding
More
HVAC:
Piping List
Cable List
Instrument List
Equipment List
TAG s
Turnover Vision
System
Acceptance
C tifi t
Certificate
System
S b
Sub
System
INPUT
Data Base
OUTPUT
System Ready
for PreCommissioning
Disciplines
TAGs
Mechanical
Completion
Certificate
Data Base
Overview
Commissioning Systems
Construction Areas
Unit
Plant Area
Group of Systems
Constr Area
G
Group
off S
Systems
t
Constr Area
System
System
Recommendations
All stakeholders must be continuously kept up-to-date with the safety requirements of changing
site conditions
Phased system-wise completion and turnover scheme requires very efficient planning and
scheduling
Construction contracts need to be structured with focus and incentives on system turn over and
completion
p
THANK YOU