FOOTING F5.0
Updated on
Client:
Addres:
5/5/2006
Design:
Date:
Checked:
Date:
01/25/15
'file:///var/www/apps/conversion/tmp/scratch_1/258321213.xls'#$Spread
2.00 Ksf
LOAD ANALYSIS
Ppier
Psoil
P ftg=
1.33 x
23.23 x
5.00 x
1.33 x
5.00 x
Pa (Max.)=
Pa (Min.)=
1.33 x
0.15 =
1.33 x
0.12 =
1.00 x
0.15 =
Total Pa (Max.)=
Total Pa (Min.)=
V(Service)=
M(due to VDL)
0.00 x 3.66 =
M(due to VLL)
0.00 x 3.66 =
M(due to VWL)
2.00 x 3.66 =
Additional M(Service)=
Total Moment(Service)=
Dead Load
5.75 K
2.75 K
0.35 K
3.72 K
3.75 K
13.57 K
10.57 K
Live Load
3.30 K
Net Uplift(Wind)
4.00 K
3.30 K
4.00 K
Total Ps (Service)=
20.87 k
2.00 k
Total V (service) =
2.00 k
0.00
0.00
7.33
0.00 K-Ft
0.00 K-Ft
STABILITY CHECK
7.33 K-Ft
CASE 1
Total Uplift:
0.6 W =
4.00 K
6.34 K
20.87 K
SF= Pg / Pu =
6.34 K / 4.00 K =
7.33 K-Ft
1.6
>
1.5
OK, No Uplift
2.00 K
3.66
e=Ms/Ps=
7.33
where,d/6=
/ 20.87
= 0.35 Ft
<d/6, Case 1
BAR SIZE
q2
0.83 Ft
0.74 Ksf =q 3
q1
0.48 Ksf
SOIL PRESSURE DISTRIBUTION ( CASE I )
q 1= (P/BL )*( 1 +6e/L) =
q 2= (P/BL )*( 1 -6e/L) =
q3 ( At column edge)=
Due to DL
0.77 Ksf
0.31 Ksf
0.48 Ksf
LL & WL
0.42 Ksf
0.17 Ksf
0.26 Ksf
Total
1.19 Ksf
0.48 Ksf
0.74 Ksf
0 0.00
fc'=
fy=
Ms(DL)=
Ms(LL)=
Mu(Short)=
Mu(Long)=
In short way
In long way
USE Bott.
USE Bott.
1.19 Ksf
5.00
0.00 Ft
3.0 Ksi
60.0 Ksi
SHORT WAY LONG WAY
5.68 K-Ft
5.68 K-Ft
2.62 K-Ft
2.62 K-Ft
1.2
X 5.68 +
1.2
As req'd
0.28 in2
0.28 in2
X 5.68 +
5 #5
5 #5
0
0
CASE 2
0.00 K
1.6
X 2.62 =
11.01 K-Ft
1.6 X 2.62 =
As min (0.18 %)
1.30 in2
<--USE
1.30 in2
<--USE
11.01 K-Ft
0.00 K-Ft
0.00 K
0.00
in shorter direction
in longer direction
0.00 Ksf
0
f1
Project:
SAMPLE FOOTING
Subject:
Page
of
Updated on
Client:
Addres:
5/5/2006
Design:
Date:
Checked:
Date:
01/25/15
'file:///var/www/apps/conversion/tmp/scratch_1/258321213.xls'#$Combined
2.00 Ksf
Right Cantilever
1.00 Ft
LOAD ANALYSIS
Ppier
Psoil
P ftg=
1.33 x
92.67 x
7.00 x
P1 =
P2=
Pa (Min.)=
1.33 x
0.15 =
1.33 x
0.12 =
1.50 x
0.15 =
Total Pa (Max.)=
Total Pa (Min.)=
H(Service)=
1.33 x
10.00 x
M(due to VDL)
0.00 x 4.16 =
M(due to VLL)
0.00 x 4.16 =
M(due to VWL)
0.00 x 4.16 =
Additional M(Service)=
Total Moment(Service)=
Dead Load
15.00 K
6.00 K
12.00 K
0.35 K
14.82 K
15.75 K
51.93 K
42.93 K
Live Load
32.00 K
13.00 K
45.00 K
10.00 K
Total Ps (Service)=
89.93 k
Total V (service) =
0.00 k
0.00
0.00
0.00
0.00 K-Ft
0.00 K-Ft
STABILITY CHECK
CASE 1
Total Uplift:
0.6 x W
10.00 K
25.76 K
SF= Pg / Pu =
25.76 K / 10.00 K =
47.00 K
19.00
0.00 K
Resultant Force=
e of Resultant=
0.08 Ft
Moment of Resultant:
e=Ms/Ps=
5.50
where,d/6=
0.00 K-Ft
2.6
0.00 K-Ft
>
1.5
OK, No Uplift
4.16
66.00 k
3.50 Ft
5.50 Ft
1.00 Ft
66.00 k
x0.08 =
5.50 K-Ft
/ 89.93
= 0.06 Ft <d/6, Case 1
q2
1.67 Ft
1.28 Ksf =q 3
q1
1.24 Ksf
SOIL PRESSURE DISTRIBUTION ( CASE I )
q 1= (P/BL )*( 1 +6e/L) =
q 2= (P/BL )*( 1 -6e/L) =
q3 ( At column edge)=
Due to DL
0.77 Ksf
0.71 Ksf
0.74 Ksf
LL & WL
0.56 Ksf
0.52 Ksf
0.54 Ksf
Total
1.33 Ksf
1.24 Ksf
1.28 Ksf
OK
OK,No Tension
L=
fc'=
3.0 Ksi
fy=
SHORT WAY LONG WAY
Ms(DL)=
30.47 K-Ft
49.87 K-Ft
Ms(LL)=
21.98 K-Ft
35.98 K-Ft
Ms(DL)@top=
2.24 K-Ft
Ms(LL)@top=
1.87 K-Ft
Mu(Short)=
1.2
X 30.47 +
Mu(Long)=
Mu(Long)@ top
1.2
1.2
X 49.87 +
X 2.24 +
1.33 Ksf
10.00
60.0 Ksi
CASE 2
47.00 K
1.6
X 21.98 =
71.73 K-Ft
1.6
1.6
X 35.98 =
X 1.87 =
117.41 K-Ft
5.69 K-Ft
19.00 K
0.00 K
0.00 K-Ft
0.00
3.50 Ft
In short way
In long way
In long way
USE Bott.
USE Bott.
USE Top.
As req'd
1.15 in2
2.00 in2
0
0
0.08 in2
0
9 #6
6 #6
6 #6
As min (0.18 %)
3.89 in2
<--USE
2.72 in2
<--USE
2.72 in2
<--USE
in shorter direction
in longer direction
in longer direction
5.50 Ft
1.00 Ft
0.00 Ksf
0
f1
e
kd
kd
0.00