TRIBAR - One-Up Stations

Legend

Flow

WIP

Equip

Inspection

Finished
Goods

Wetout
Machine (if
required)

Rec
ycl
e
Bin
for
tap
e
bac
kin
gs

Heatstake Machine
(if required)

Suspect/
Scrap
Bins

F
l
o
w

Opr. 1
WIP
Compone
nt
Assembly
Station
#1

Inspect
Station

Secondary
Assembly
Table (if
nessesary)

Recycle Bin
for recycled
waste

WIP
Compone
nt
Assembly
Station
#2

Tape
loaded at
machine

Foam &
Chipboard
(Below)

WIP
Components
(2-hr
Supply)

Opr.2
(if needed)

Packing
Inserts /
Chip / Foam
(Below)

Finish
Goods

Inspect
and Pack

Suspect/
Scrap
Bins

Finish Boxes
or empty totes

Component parts and workflow to be set up according to this diagram unle


job states otherwise.
Only 2-hour WIP supply at machine.
Maintain a 1-2 piece flow at all times.
DIAGRAM NOT TO SCALE

FOR REFERENCE ONLY

Rev. 00

TRIBAR - One-Up Stations

Maintain a 1-2 piece flow at all times.


DO NOT build ahead!
Absolutely NO assembly to be done on inspection tables!

DIAGRAM NOT TO SCALE

FOR REFERENCE ONLY

Rev. 00

TRIBAR - One-Up Stations

ape
ded at
chine

F
l
o
w

m unless specific

DIAGRAM NOT TO SCALE

FOR REFERENCE ONLY

Rev. 00

TRIBAR - One-Up Stations

DIAGRAM NOT TO SCALE

FOR REFERENCE ONLY

Rev. 00

You might also like