Professional Documents
Culture Documents
Equipment Calculation New
Equipment Calculation New
TAHUN KE
TARGET PRODUKSI OB
TARGET PRODUKSI EXCAVATOR
PRODUCTION SCADULE
LAND CLEARING
BULLDOZER
TOP SOIL REMOVAL
LOADING TOP SOIL
HAULING TO DISPOSAL
OVERBURDEN REMOVAL
LOADING OB
HAULING TO DISPOSAL
DOZING AND SPEREADING
TIN GETTING
LOADING TIN
HAULING TIN
TIN PROCCESING
PEMBUATAN CAMUY
MONITORING
PULP TRANSPORTASI
PEMISAHAN TAILING
1543287.7
127041.9
1672928.9
389253.3
MACHINE TYPE
D85SS
PROD ALAT/JAM
-
EXCA PC 400
HD 325
172.8
77.2486772487
EXCA PC 400
HD 465
-
255.7894736842
97.8
-
EXCA PC 300
HD 325
162
77.245
750
600
550
JIGGING
SCREENING
ROAD MAINTANANCE
PERATAAN
PEMADATAN
PENYEMPROTAN DEBU
ALAT SUPPORT
GENSET
LIGHTING TOWER
FUEL TRUCK
JIG
AYAKAN SAKAN
MOTOR GRADER
COMPACTOR
WAATER TANK
GENSET KIPOR 01
120
10800
29250
25000
1799189.9 758218.9
598361.7 210189.4
PROD ALAT/TAHUN
2
10
20
18
6000
3780
310
4
-
NUMBER OF UNIT
2
-
1
-
653184
292000
154328
154328
154328
154328
154328
154328
966884.210526316
369684
-
1543287.7
1543287.7
-
1672928.9
1672928.9
-
1799189.9
1799189.9
-
612360
291986.1
127041.9
127041.9
389253.3
389253.3
598361.7
598361.7
2835000
127041.9
389253.3
598361.7
210189.4
0.0448119577
0.1373027513
2079000
127041.9
389253.3
598361.7
210189.4
0.061107215
0.1872310245
154328
154328
1
-
SHIFT/HARI
JAM/SHIFT
JAM/HARI
JAM/HARI
JAM/TAHUN
JAM/TAHUN
HARI/TAHUN
0.2362703312
0.5285205479
0.2362703312
0.5285205479
758218.9
758218.9
-
1.5961453121
4.1746131832
-
1.7302267239
4.5252943054
-
210189.4
210189.4
0.207462767
0.4350957117
0.6356608858
1.3331227069
453600
127041.9
389253.3
598361.7
32400000
87750000
75000000
14400000
14400000
14400000
14400000
14400000
14400000
14400000
14400000
14400000
210189.4
14400000
14400000
14400000
0.2800747354
0.4444444444
0.1641025641
0.192
0.8581421958
0.4444444444
0.1641025641
0.192
MBER OF UNIT
3
-
4
-
1
1
ROUND/QUANTITY
2
3
1
1
4
1
0.2362703312
0.5285205479
0.2362703312
0.5285205479
1
1
1
1
1
1
1
1
1.8608121639
4.866831943
-
0.7841879015
2.0509919282
-
2
5
1
2
5
1
2
5
1
1
3
1
0.9771404076
2.0492814555
0.3432448233
0.7198609797
1
1
1
2
1
3
1
1
1
2
1
1
2
1
1
2
1
1
2
1
0.211062328
0.0741408818
0.2878122655
0.1011012025
1.3191395503
0.4444444444
0.1641025641
0.192
0.4633805115
0.4444444444
0.1641025641
0.192
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
10
1
1
10
1
1
10
1
1
10
1
ESTIMASI PRODUKTIVITY HD
MODEL
:
JENIS PEKERJAAN
PARAMETER
SIMBOL
ESTIMASI PRODUKSI HD
MUATAN
EFESIENSI
QTY OF HD IN OPERATION
SIKLUS WAKTU HD
BUCKET CAP LOADER
BUCKET FILL FACTOR LOADER
CYCLE TIME LOADER
Number of required
production per cycle
P
Et
M
Cmt
q1
K
Cm
n
C
HD 465
HAULING OB KE DISPOS
NILAI
M3/HOUR
50
0.8
MIN
m3
min
25
3.2
1.9
0.316667
ESTIMASI PRODUKTIVITY HD
MODEL
:
JENIS PEKERJAAN
PARAMETER
SIMBOL
ESTIMASI PRODUKSI P
MUATAN
C
EFESIENSI
Et
QTY OF HD IN OPERATM
SIKLUS WAKTU HD
Cmt
BUCKET CAP LOADER q1
BUCKET FILL FACTOR K
CYCLE TIME LOADER Cm
Number of required n
kapasitas hd
HD 465
HAULING OB KE DISPOSAL AREA
SATUAN
M3/HOUR
MIN
m3
min
B KE DISPOSAL AREA
NILAI
55
0.8
0.159933
25
2
0.9
0.316667
49.5
25
PARAMETER
SIMBOL
SATUAN
ESTIMASI PRODUKSI EQ
BCM/HR
LCM/HR
TON/HR
KAPASITAS BUCKET
BUCKET FILL FACTOR
EFESIENSI KERJA
CYCLE TIME
DENSITY INSITU
DENSITY LOOSE
swell factor
m3
q1
K
E
CM
SEC
NILAI
255.7895
306.9474
552.5053
2
0.9
0.75
19
1.8
1.5
1.2
: STRIPING OB
PARAMETER
SIMBOL
SATUAN
ESTIMASI PRODUKSI EQ
BCM/HR
LCM/HR
TON/HR
KAPASITAS BUCKET
BUCKET FILL FACTOR
EFESIENSI KERJA
CYCLE TIME
DENSITY INSITU
DENSITY LOOSE
swell factor
m3
material density
q1
K
E
CM
SEC
NILAI
204.6316
255.7895
306.9474
1
0.9
0.75
19
1.2
0.6
2
1.2
172.8