Professional Documents
Culture Documents
Lampiran: 1 Hasil A Jumlah Sambungan Pipa
Lampiran: 1 Hasil A Jumlah Sambungan Pipa
Lampiran: 1 Hasil A Jumlah Sambungan Pipa
Hasil
Aliran
1
2
3
4
5
Penuh
Penuh
1 in
in
Bypass
Elbow 90
5
4
3
2
3
Katup
9
4
4
4
4
Expansion Loss
No
Aliran
1
2
3
4
5
Penuh
Penuh
1 in
in
Bypass
Contaction Loss
No
Aliran
1
Penuh
2
Penuh
3
1 in
4
in
5
Bypass
d Dimensi Pipa
Sambungan
Elbow 180 Tee
1
7
1
4
0
5
0
6
0
5
No
Aliran
1
2
3
4
5
Penuh
Penuh
1 in
in
Bypass
Hasil Pengukuran
1 in
24.61
17.19
17.26
11.19
11.19
Zb
in
11.42
5.38
0
0
0
(ft)
4.76
0.56
3.02
2.20
1.38
Venturimeter
No
.
Aliran
Penuh
1 in
3/4 in
1/2 in
(full)
1/2 in
(by
pass)
4
5
Volum
e Out
(ft)
0.1968
0.2133
0.1739
0.0844
0.0911
0.0745
0.0101
0.0074
0.0081
Vout
(ft)
0.0177
0.0187
0.0127
0.0095
0.0148
0.0984
0.0396
0.0088
0.0117
0.0164
0.0745
Vin (ft)
1
2
3
Orificime
ter
(ftHg)
Waktu
Ventur
i (dtk)
Wakt
u
(dtk)
Vout
Suhu
Air
(F)
84.2
Spesifikasi Cairan
No
1
2
3
Cairan
T(f)
80
84.2
90
Air
(lb/ft.s)
5.792 x 10-4
5.516 x 10-4
5.134 x 10-4
(lb/ft3)
62.22
62.17
62.11
K (ft)
k/D
0.002
0.002
0.003
Nilai Ketetapan
No
1
2
Konstanta
g
gc
Nilai
32.17 (ft/s2)
32.17 (ft.lb/lbf.s2)
Dimensi Pipa
No
1
2
3
i
Pipa
1 in
in
in
D (ft)
0.0874
0.0687
0.0518
S (ft)
0.006
0.004
0.002
0.00015
Kecepatan Aliran
No
Aliran
Q (ft3/s)
1
2
3
4
5
Penuh
Penuh
1 in
in
Bypass
0.02451
0.01730
0.01688
0.01699
0.01801
1 in
4.085
2.884
2.813
2.831
3.002
(ft/s)
in
6.127
4.326
4.220
4.247
4.503
in
12.254
8.652
8.440
8.493
9.005
Aliran
Penuh
Penuh
1 in
in
Bypass
1 in
NRE
in
in
43013.
62
50715.
71
76479.
59
56736.
31
30369.
85
35807.
92
53998.
56
40058.
78
52676.
14
53006.
75
56202.
58
39077.
74
39323
41693.
83
29626.
09
29812.
03
31609.
43
34931
35150.
23
37269.
47
NRE total
1 in
F
in
in
No
Aliran
1
2
3
4
5
Penuh
Penuh
1 in
in
Bypass
1 in
hfs (ft.lbf/lb)
in
hfs
in
(ft.lbf/lb)
1.9566
0.7120
0.6801
0.4465
0.5019
1.3315
0.6839
0
0.6590
0.7230
12.3462
2.9972
0
0
0
15.6344
4.3931
0.6801
1.1055
1.2319
Sambungan
Elbow 90
Elbow 180
Tee
Katup Bola
kf
0.9
2.2
1.8
10.0
Aliran
1
2
3
4
5
Penuh
Penuh
1 in
in
Bypass
Elbow 90
5
4
3
2
3
Sambungan
Elbow 180
Tee
1
7
1
4
0
5
0
6
0
5
Katup
9
4
4
4
4
kf
109.3
53
51.7
52.6
51.7
No
1
2
3
4
5
o
Aliran
Penuh
Penuh
1
in
Bypass
hff (ft.lbf/lb)
28.3443
6.8516
6.3602
6.5524
7.2403
Expansion Loss
in 1 in
in 1 in
in in
No
Aliran
1
2
3
4
5
q
in 1 in
hfe (ft.lbf/lb)
in 1 in
in in
0,115
0,057
0
0
0,062
0,065
0
0
0,031
0
0
0
0
0
0
Penuh
Penuh
1 in
in
Bypass
hfe
(ft.lbf/lb)
0,180
0,057
0
0,031
0,062
Contaction Loss
1 in in
in in
in in
Kc
0,13
0,2
0,267
Aliran
1 in in
1
2
3
4
5
s
Ke
0,444
0,111
0,25
Penuh
Penuh
1 in
in
Bypass
Total Head Loss
0,155
0,039
0
0,037
0
hfc (ft.lbf/lb)
in in
0,467
0,232
0
0
0
hfc
1 in in
0
0
0
0
0,340
(ft.lbf/lb)
0,622
0,271
0
0,037
0,340
No
Aliran
1
2
3
4
5
Penuh
Penuh
1
in
Bypass
hfs
hff
hfe
hfc
hf
(ft.lbf/lb)
15,6344
4,3931
0,6801
1,1055
1,2319
(ft.lbf/lb)
28,3443
6,8516
6,3602
6,5524
7,2403
(ft.lbf/lb)
0,180
0,057
0
0,031
0,062
(ft.lbf/lb)
0,622
0,271
0
0,037
0,340
(ft.lbf/lb)
44,7807
11,5727
7,0404
7,7259
8,8742
Daya Pompa
No
Aliran
1
2
3
4
5
Penuh
Penuh
1
in
Bypass
Perhitungan
2
a
Wp (ft.lbf/lb)
100 %
49,797
12,259
10,182
10,049
49,797
(lb/s)
1,524
1,076
1,049
1,056
1,120
P (Hp)
0,1380
0,0240
0,0194
0,0192
0,0210
Ket:
Pipa in
= 50715.71 turbulen
Pipa in
= 76479.59 turbulen
NRE total
NRE total = NRE 1 in + NRE in +NRE in
=
=
2 Aliran Penuh
Pipa 1 in
= 30369.85 turbulen
Pipa in
= 35807.92 turbulen
Pipa in
= 53998.56 turbulen
NRE total
NRE total = NRE 1 in + NRE in +NRE in
=
=
3 Aliran 1 in
Pipa 1 in
= 29626.09 turbulen
Pipa in
= 34931 turbulen
Pipa in
= 52676.14 turbulen
NRE total
Pipa in
= 35150.23 turbulen
Pipa in
= 53006.75 turbulen
NRE total
NRE total = NRE 1 in + NRE in +NRE in
=
=
5 Aliran Bypass
Pipa 1 in
= 31609.43 turbulen
Pipa in
= 37269.47
turbulen
Pipa in
= 56202.58 turbulen
NRE total
NRE total = NRE 1 in + NRE in +NRE in
=
=
= Faktor gesek
gc
hfs
1 Aliran Penuh
Pipa 1 in
= 1.9566 ft.lbf/lb
Pipa in
= 1.3315 ft.lbf/lb
Pipa in
= 12.3462 ft.lbf/lb
Jumlah hfs
hfs = hfs pipa 1 in + hfs pipa in + hfs pipa in
= 1.9566 ft.lbf/lb + 1.3315 ft.lbf/lb + 12.3462 ft.lbf/lb
= 15.6344 ft.lbf/lb
2 Aliran Penuh
Pipa 1 in
= 0.7120 ft.lbf/lb
Pipa in
= 0.6839 ft.lbf/lb
Pipa in
= 2.9972 ft.lbf/lb
Jumlah hfs
hfs = hfs pipa 1 in + hfs pipa in + hfs pipa in
= 0.7120 ft.lbf/lb + 0.6839 ft.lbf/lb + 2.9972 ft.lbf/lb
= 4.3931 ft.lbf/lb
3 Aliran 1 in
Pipa 1 in
= 0.6801 ft.lbf/lb
hfs = hfs pipa 1 in + hfs pipa in + hfs pipa in
= 0.6801 ft.lbf/lb + 0 ft.lbf/lb + 0 ft.lbf/lb
= 0.6801 ft.lbf/lb
4 Aliran in
Pipa 1 in
= 0.4465 ft.lbf/lb
Pipa in
= 0.6590 ft.lbf/lb
Jumlah hfs
hfs = hfs pipa 1 in + hfs pipa in + hfs pipa in
= 0.4465 ft.lbf/lb + 0.6590 ft.lbf/lb + 0 ft.lbf/lb
= 1.1055 ft.lbf/lb
5 Aliran Bypass
Pipa 1 in
= 0.5019 ft.lbf/lb
Pipa in
= 0.7230 ft.lbf/lb
Jumlah hfs
hfs = hfs pipa 1 in + hfs pipa in + hfs pipa in
gc
ft.lbf/lb
5 Aliran Bypass
kf = kf elbow 90 + kf elbow 180 + kf tee + kf katup
= (3 x 0.9) + (0 x 2.2) + (5 x1.8) + (4 x 10.0)
= 51.7
ft.lbf/lb
dan
hfe = hfe in 1 in + hfe in 1 in + hfe in in
Ket:
gc
= 0,115 ft.lbf/lb
hfe =
in 1 in
= 0.111
= 0,065 ft.lbf/lb
hfe =
Total hfe
hfe = hfe in 1 in + hfe in 1 in + hfe in in
= 0,115 ft.lbf/lb + 0,065 ft.lbf/lb + 0 ft.lbf/lb
= 0,180 ft.lbf/lb
2 Aliran Penuh
in 1 in
= 0.444
= 0,057 ft.lbf/lb
hfe =
Total hfe
hfe = hfe in 1 in + hfe in 1 in + hfe in in
= 0,057 ft.lbf/lb + 0 ft.lbf/lb + 0 ft.lbf/lb
= 0,057 ft.lbf/lb
3 Aliran 1 in
Total hfe
hfe = hfe in 1 in + hfe in 1 in + hfe in in
= 0 ft.lbf/lb + 0 ft.lbf/lb + 0 ft.lbf/lb
= 0 ft.lbf/lb
4 Aliran in
in 1 in
= 0.111
= 0,031 ft.lbf/lb
hfe =
Total hfe
hfe = hfe in 1 in + hfe in 1 in + hfe in in
= 0 ft.lbf/lb + 0,031 ft.lbf/lb + 0 ft.lbf/lb
= 0,031 ft.lbf/lb
5 Aliran Bypass
in 1 in
= 0.444
= 0,062 ft.lbf/lb
hfe =
Total hfe
hfe = hfe in 1 in + hfe in 1 in + hfe in in
= 0,062 ft.lbf/lb + 0 ft.lbf/lb + 0 ft.lbf/lb
= 0,062 ft.lbf/lb
e
dan
hfc = hfc 1 in in + hfc in in + hfc 1 in in
Ket:
gc
1 Aliran Penuh
1 in in
= 0.13
= 0,077 ft.lbf/lb
hfc =
in in
= 0.2
= 0,467 ft.lbf/lb
hfc =
Total hfc
hfc = hfc 1 in in + hfc in in + hfc 1 in in
=(2 X 0,115 ft.lbf/lb) + 0,467 ft.lbf/lb + 0 ft.lbf/lb
= 0,622 ft.lbf/lb
2 Aliran Penuh
1 in in
= 0.13
= 0,039 ft.lbf/lb
hfc =
in in
= 0.2
hfc =
= 0,232 ft.lbf/lb
Total hfc
hfc = hfc 1 in in + hfc in in + hfc 1 in in
= 0,039 ft.lbf/lb + 0,232 ft.lbf/lb + 0 ft.lbf/lb
= 0,271 ft.lbf/lb
3 Aliran 1 in
Total hfc
hfc = hfc 1 in in + hfc in in + hfc 1 in in
= 0 ft.lbf/lb + 0 ft.lbf/lb + 0 ft.lbf/lb
= 0 ft.lbf/lb
4 Aliran in
1 in in
= 0.13
= 0,037 ft.lbf/lb
hfc =
Total hfc
hfc = hfc 1 in in + hfc in in + hfc 1 in in
= 0,037 ft.lbf/lb + 0 ft.lbf/lb + 0 ft.lbf/lb
= 0,037 ft.lbf/lb
5 Aliran Bypass
1 in in
= 0.267
hfc =
= 0,340 ft.lbf/lb
Total hfc
hfc = hfc 1 in in + hfc in in + hfc 1 in in
= 0 ft.lbf/lb + 0 ft.lbf/lb + 0,340 ft.lbf/lb
= 0,340 ft.lbf/lb
f
4 Aliran in
hf = 1,1055ft.lbf/lb +6,5524ft.lbf/lb +0,031ft.lbf/lb +0,037ft.lbf/lb
= 7,7259 ft.lbf/lb
5 Aliran Bypass
hf = 1,2319ft.lbf/lb +7,2403ft.lbf/lb +0,062ft.lbf/lb +0,340ft.lbf/lb
= 8,8742 ft.lbf/lb
g
Daya Pompa
x
dan
1 Aliran Penuh
x
= 49,797 ft.lbf/lb
= 0,138 Hp
2 Aliran Penuh
x
= 12.259 ft.lbf/lb
= 0,024 Hp
3 Aliran 1 in
x
= 10.182 ft.lbf/lb
= 0,019 Hp
4 Aliran in
x
= 10,049 ft.lbf/lb
= 0,019 Hp
5 Aliran Bypass
x
= 49,797 ft.lbf/lb
= 0,021 Hp