NUI PHAO MINING PROJECT

NUI PHAO MINING COMPANY

THAI NGUYEN , VIET NAM

Report No.

INSPECTION/TEST REPORT
FOR
TILING WORK

INSPECTION
MINUTES

Area: Control rocom Boiler house


Contractor:
Description of Inspection and acceptance

Yes

No

N/A

Remarks

Approval of tile, material, size & thickness as per specified


Setting out of control line or datum to approved pattern
Tile joints are aligned and consistent
No cracks, chipped and cleanliness of tiles
No hollowness sound after laying
Full pointing at tile joint
Tiled surface leveled
Cleaning

Noted:
- All the above activities are completed, checked and found acceptable.
- The suspended ceiling is ready to release for next activity.

CONTRACTOR

Nui Phao Mining Co.,ltd

VILENTM

NPMCs supervisor

Date: / / 2013

Date: / / 2013