DOCUMENT NO.

PROJECT :
LEKO - KAPAS BRIDGES AND

PRM-HK-

SUBAN ALTERNATIVE ROAD

ROAD STRUCTURE

Rev.

Date

16-Januari -15

ROAD STRUCTURE

PROJECT

: SUBAN ALTERNATIVE ROAD

CLIENT

: CONOCOPHILLIPS Grissik Ltd.

LOCATION

: Suban and Dayung Operations

DOCUMENT NO. : -

JOB NO. :

IFU

ISSUED FOR USED

IFA

ISSUED FOR APPROVAL

IFC

ISSUED FOR COMMENT

REV

DESCRIPTION

DATE

PREPARED

CHECKED

APPROVED

PROJECT :

DOCUMENT NO.

LEKO - KAPAS BRIDGES AND


SUBAN ALTERNATIVE ROAD

ROAD STRUCTURE

Rev.

PRM-HK-

Date

16-Januari -15

LIST OF ROAD STRUCTURE :

1. ALIGNMENT ROAD
-

ALIGNMENT HORIZONTAL (STA 0+000 8+500)

ALIGNMENT VERTICAL (STA 0+000 -15+381)

2. CONCEPTUAL GRADING / ROAD (LONGITUDINAL SECTION)


STA 0+000 8+500
3. CONCEPTUAL GRADING / ROAD (LONGITUDINAL SECTION)
STA 8+500 11+500
4. CONCEPTUAL GRADING / ROAD (LONGITUDINAL SECTION)
STA 11+500 15+381
5. CROSS SECTION STA 0+000 8+500
6. CROSS SECTION STA 8+500 11+500
7. CROSS SECTION STA 11+500 15+381
8. TYPICAL ROAD
9. LAY OUT PLAN TITIK KOORDINAT SUBAN ALTERNATIVE ROAD
10. RETAINING WALL (PRECAST)
11. CULVERT (CORRUGATED STEEL)