The document summarizes the results of a gage capability study to measure the length of a part. Ten samples were measured three times each using a height gauge. The measurement results were analyzed to determine total variation, equipment variation, appraiser variation, and process variation. The analysis shows the process variation is within specification limits and the part meets the acceptance criteria for the study with a good gage repeatability and reproducibility value.
The document summarizes the results of a gage capability study to measure the length of a part. Ten samples were measured three times each using a height gauge. The measurement results were analyzed to determine total variation, equipment variation, appraiser variation, and process variation. The analysis shows the process variation is within specification limits and the part meets the acceptance criteria for the study with a good gage repeatability and reproducibility value.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
The document summarizes the results of a gage capability study to measure the length of a part. Ten samples were measured three times each using a height gauge. The measurement results were analyzed to determine total variation, equipment variation, appraiser variation, and process variation. The analysis shows the process variation is within specification limits and the part meets the acceptance criteria for the study with a good gage repeatability and reproducibility value.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLS, PDF, TXT or read online from Scribd
Trials K1 Appraisers 2 3 Parts n 10 2 0.8662 K2 0.7071 0.5231 Trials r 3 3 0.5908
Repeatability-Equipment Variation(EV) GRR= sqrt (EV2+AV2) Process Variation- PV %GRR= 100(GRR/TV)
EV= Ravg x K1 0.00592567 PV= sqrt (TV2-GRR2) 3.56 0.0053172 0.16656129 Total Variation-TV ndc=1.41(PV/GRR) Reproducibility- Appraiser Variation (AV) TV= process variation/6 %AV=100(AV/TV) 40 AV= sqrt( (Xdiff x K2)2 -(EV2/nr)) 0.16666667 1.56931092 0.00261552 Conclusion: %PV=100(PV/TV) Accepted- The part was mark 99.9367756 and not move in order to get good GRR