Deshuttering period refers to the maturity of concrete before removing forms and depends on ambient temperature. Forms should not be removed until the concrete reaches at least twice the strength required to resist stresses upon removal. Standard removal times are 24 hours for walls and columns in summer, 48 hours in winter; 7 days for slab props up to 4.5m in summer, 14 days in winter; and 14 days for beam props up to 6m in summer, 28 days in winter.
Deshuttering period refers to the maturity of concrete before removing forms and depends on ambient temperature. Forms should not be removed until the concrete reaches at least twice the strength required to resist stresses upon removal. Standard removal times are 24 hours for walls and columns in summer, 48 hours in winter; 7 days for slab props up to 4.5m in summer, 14 days in winter; and 14 days for beam props up to 6m in summer, 28 days in winter.
Deshuttering period refers to the maturity of concrete before removing forms and depends on ambient temperature. Forms should not be removed until the concrete reaches at least twice the strength required to resist stresses upon removal. Standard removal times are 24 hours for walls and columns in summer, 48 hours in winter; 7 days for slab props up to 4.5m in summer, 14 days in winter; and 14 days for beam props up to 6m in summer, 28 days in winter.
Deshuttering period relates to the maturity of concrete and depends on the
ambient temperature. Forms shall not s truck until the concrete has reached strength at least twice the stress of which the concrete may be subjected at the time of removal of form work. Assuming standard conditions of workmanship and quality of materials, you can refer to the following time-frames for the removal of forms. Form