SL No Package Discipline Agency: Manpower Deployment Status of 2X600 MW, Jitpl, Angul, Odisha Apr-2014 1-Apr-14 2-Apr-14
SL No Package Discipline Agency: Manpower Deployment Status of 2X600 MW, Jitpl, Angul, Odisha Apr-2014 1-Apr-14 2-Apr-14
SL NO
PACKAGE
DISCIPLINE
AGENCY
1-Apr-14
T
A
2-Apr-14
T
A
Civil
SPCL
100
62
100
62
Civil
SPCL
200
135
200
148
Control Building
Civil
SPCL
70
52
70
52
Guard Pond
Civil
SPCL
15
15
Fire Station
Civil
SPCL
ESP-1 & 2
Civil
SPCL
50
11
50
11
Boiler-1 & 2
Civil
SPCL
112
79
112
79
Structural
SPCL
50
28
50
28
TG #2
Structural
SPCL
150
103
150
103
10
TG#1 Painting
Structural
SPCL
10
10
11
TG#2 Painting
Structural
SPCL
50
50
12
Fabrication U#1
Fabrication
SPCL
13
Fabrication U#2
Fabrication
SPCL
50
11
50
11
14
Civil
SPCL
50
32
50
38
15
Civil
SPCL
50
34
50
35
16
Service Building
Civil
SPCL
150
55
150
48
17
Canteen Building
Civil
SPCL
30
12
30
15
18
Workshop Building
Civil
SPCL
19
Overhead Tank
Civil
SPCL
20
Storage Shed
Civil/Ern
SPCL
100
25
100
23
21
SPCL
150
109
150
109
22
SA Fan Foundation
Civil
SPCL
23
PA Fan Foundation
Civil
SPCL
24
FD Fan Foundation
Civil
SPCL
25
Civil
SPCL
10
10
26
Cable Rack
Mech
SPCL
30
30
27
Civil
SPCL
50
14
50
14
28
Siemens SwitchYard
Civil
SPCL
29
Civil
SPCL
15
15
15
15
SPCL
1492
786
1492
800
Night Shift
Civil
SPCL
BOILER-1
ERECTION
BHEL/PCP
300
290
300
315
Fitters
BHEL/PCP
25
19
25
19
Welders
BHEL/PCP
55
18
55
18
Ducting
BHEL/PCP
120
55
120
58
Mill
BHEL/PCP
35
20
35
21
BHEL/PCP
15
18
15
17
30
31
Night Shift
BOILER-2
BHEL/PCP
25
15
ERECTION
BHEL/UBEL
540
260
540
260
Fitters
BHEL/UBEL
20
26
20
26
Welders
BHEL/UBEL
10
25
10
25
Ducting
BHEL/UBEL
120
58
120
58
Mill
BHEL/UBEL
40
10
40
10
BHEL/UBEL
15
11
15
11
32
BHEL/B&R
150
110
150
120
33
BHEL/B&R
250
225
250
230
B&R
400
335
400
350
ERECTION
Night Shift
B&R
20
20
34
ERECTION
BHEL/PowerMech
200
72
200
72
35
BHEL/PowerMech
450
360
450
355
PowerMech
650
432
650
427
Night Shift
PowerMech
Page 1 of 6
20
20
PACKAGE
BTG-Electrical
DISCIPLINE
AGENCY
Erection
BHEL/Vasavi
Page 2 of 6
1-Apr-14
T
A
250
130
2-Apr-14
T
A
250
130
PACKAGE
DISCIPLINE
AGENCY
1-Apr-14
T
A
2-Apr-14
T
A
BTG-C&I
100
52
100
65
38
BTG-C&I
BHEL/
Erection U#02
Powertronics
100
22
100
22
39
PHB Cladding
Erection
Lloyd Insulation
50
16
50
16
40
TURBINE-1
ERECTION
BHEL/UBEL
150
140
150
140
41
TURBINE-2
ERECTION
BHEL/EEPL
200
160
200
160
UBEL
690
400
690
400
Night Shift
42
UBEL
ERECTION
44
Mill Bunker-2
150
BHEL/Golden
Edge
Night Shift
43
BHEL/Golden Edge
15
ERECTION
Fabrication/
Erection
Fabrication/
Erection
BHEL/Rukmani
155
12
150
15
161
12
350
171
350
158
Omega
400
190
400
192
Omega
400
190
400
192
Rukmani
Night Shift
Omega
12
14
45
Gammon
45
30
45
40
46
Chimney
CIVIL
Gammon
10
10
ERECTION
Gammon
50
23
50
24
47
CIVIL
Gammon
Fab/Ern
Gammon
48
CIVIL
Gammon
50
45
50
45
49
Gammon
20
18
20
15
50
CIVIL
Gammon
15
12
15
12
51
CIVIL
Gammon
25
22
25
25
CIVIL
Gammon
52
Pipe rack
Fab/Erection
& Painting
Gammon
53
CIVIL
Gammon
50
12
50
16
CIVIL
Gammon
15
12
15
12
54
CW Piping
ERECTION
Gammon
55
TOWNSHIP
CIVIL
Gammon
900
544
900
544
56
ACW Piping
Fabrication/
Erection
Gammon
57
Transformer yard
Civil
Gammon
135
92
135
82
58
Transformer yard-Drain
Civil
Gammon
59
Civil
Gammon
30
20
30
20
60
Fabrication
Gammon
61
Misc
Gammon
130
112
130
115
GAMMON
1525
977
1525
986
Night Shift
62
63
TRANSMISSION LINE
64
65
E BOP
66
PLANT ILLUMINATION
Civil
GAMMON
50
50
Abhinav
Construction
CIVIL
GAMMON
50
50
50
50
ERECTION
GAMMON
250
200
250
200
GAMMON-TR LINE
300
250
300
250
CIVIL
SIEMENS
10
10
ERECTION
SIEMENS
20
20
CIVIL
SIEMENS
15
15
ERECTION
SIEMENS
100
72
100
72
ERECTION
JITPL Agency
50
12
50
12
Page 3 of 6
PACKAGE
DISCIPLINE
AGENCY
SIEMENS
Page 4 of 6
1-Apr-14
T
A
195
82
2-Apr-14
T
A
195
82
PACKAGE
DISCIPLINE
AGENCY
1-Apr-14
T
A
2-Apr-14
T
A
Night Shift
SIEMENS
67
LP PIPING
ERECTION
Zeromm/Other
Agency
100
25
100
26
68
FIRE PROTECTION
SYSTEM
ERECTION
100
39
100
38
69
DG Building
CIVIL
KSSIIPL
70
Mill Bunker-1
CIVIL
KSSIIPL
30
17
30
17
Erection
KSSIIPL
150
134
150
135
71
CIVIL
KSSIIPL
72
CIVIL
KSSIIPL
100
71
100
69
73
CIVIL
KSSIIPL
74
Structural Erection-TG-2
ERECTION
KSSIIPL
75
Structural Fabrication
Fabrication
KSSIIPL
40
13
40
13
76
KSSIIPL
55
15
55
15
KSSIIPL
375
250
375
249
20
12
Night Shift
77
78
COOLING TOWER-1
COOLING TOWER-2
KSSIIPL
CHP
80
MINE CONVEYOR
SYSTEM
20
PCTL
ERECTION
PCTL
CIVIL
PCTL
100
82
100
86
ERECTION
PCTL
50
19
50
15
PCTL
170
115
170
113
PCTL
14
CIVIL
Night Shift
79
CIVIL
TECPRO
150
20
150
ERECTION
TECPRO
350
160
350
162
CIVIL
TECPRO
40
20
40
ERECTION
TECPRO
70
60
70
65
TECPRO
610
260
610
232
Night Shift
Tecpro
25
81
C W PUMPs
ERECTION
KBL
20
14
20
14
82
CIVIL/
ERECTION
RAUNAQ
83
ERECTION
RAUNAQ
84
ERECTION
RAUNAQ
10
85
CW makeup line
ERECTION
RAUNAQ
RAUNAQ
14
CIVIL
SAMARPITA
ERECTION
IEL
75
78
75
74
CIVIL
MACAWBER
100
75
100
75
ERECTION
MACAWBER
120
112
120
100
86
87
88
BSBK
65
16
65
16
89
BSBK
100
90
100
87
Refractory
BSBK
385
293
385
278
ERECTION
MBPL/BSBK
Night Shift
MBPL/BSBK
90
COMPRESSED AIR
SYSTEM
ERECTION
91
ERECTION
92
POTABLE WATER
SYSTEM
ERECTION
93
AIR CONDITIONING
SYSTEM
ERECTION
94
95
35
STERLING &
WILSON
40
22
40
22
WMI
SAFEX
ERECTION
ATLAS COPCO
20
THERMOSYSTEM
S
THERMOSYSTEM
S
Page 5 of 6
DISCIPLINE
AGENCY
1-Apr-14
T
A
2-Apr-14
T
A
HYDROGEN
GENERATION PLANT
CIVIL
Gammon
30
14
30
14
ERECTION
Airox Nigen
10
10
97
SEWAGE TREATMENT
PLANT
CIVIL
Gammon
ERECTION
Ion Exchange
98
ERECTION
CHEMTROL
99
COLTCS
ERECTION
GEA-BGR
10
10
100
WORKSHOP EQUIP.-I
ERECTION
HMT
101
WORKSHOP EQUIP.-II
(BATLIBOI)
ERECTION
BATLIBOI
102
WORKSHOP EQUIP.-III
ERECTION
PATHAK
103
Civil
Sinhotia
100
62
100
62
Civil
Nanda
30
23
30
25
Civil
RK Associates
25
32
25
32
Civil
Pradhan
25
25
Civil
Monalisha
25
19
25
17
Civil
Monalisha
60
69
60
67
Civil
R K Associates
50
22
50
25
Civil
Essem Constn
50
50
Civil
R K Associates
95
49
95
49
Civil
Gammon
20
21
20
22
Civil
Essem Constn
50
50
Civil
Sinhotia
100
22
100
22
145
71
145
74
60
69
60
67
100
100
200
84
200
84
96
104
PACKAGE
Roads
105
Peripheral Drainage-I +
Internal drain
106
Peripheral Drainage-II
107
108
Internal Drains
Ash Dyke`
R K Associates
( Drain)
Monalisha
(Drains)
Essem Constn
(Drains)
Sinhotia
Night Shift(Sinhotia)
109
EOT CRANE
Sinhotia
ERECTION
Electromech
TOTAL
Night Shift (Total)
10
9727
5880
9727
5903
212
183
(1)Agency wise manpower includes night shift manpower also. Total manpower in
night shift as on 01.04.2014 - 183 heads.
(2) Manpower target revised from 11087 to 9727 wef 01.04.2014 based on balance
Note:
quantum of works in various areas.
(3) Less manpower reported in Tecpro in CHP & Mine Conveyor civil due to payment
issues .
Page 6 of 6