Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MINUTES OF MEETING - DIB AL FAJAR TOWER, DUBAI

Issue date:

10-Feb-15

Issued by: Bond Interiors


Subject: Minutes of Meeting DIB Al Fajar Tower, Dubai
Client:
Dubai Islamic Bank

Dubai Islamic Bank


Hisham Ismail
Ayman
Irfan Yaseen
Vaseem Rashid
Sajieth
Kumar

S No

Meeting Date: 09-Feb-15


Time: 12.00 PM - 1.00 PM
Location: Site Office, Al Fajar Tower
Meeting No - 12

PRESENT

Bond Interiors

Others

George Mammen
Wael
Ismail

Yuzan
Ulshan
Vishakh
Prasad

Description

Action

IT vendor will finish Mezzanine floor MDF & IDF rooms works by 14-Feb-14.

Containment from the mezzanine floor to the first floor will be done by the
building contractor

DIB

Safety and security cabinet in the MDF room to be installed by DIB

DIB

DIB safety and security informed to Bond to get their permission before
closing the ceiling.

Note

For modification of SMDB in the mezzanine floor, Bond is waiting for DEWA
approval for resubmitted drawings.

Note

Al Badar

These minutes are a record of events. Acceptance is assumed unless notified in writing within 24
Hours from circulation of this minutes.

2/10/2015

Page 1 of 1

Minutes of
Meeting

You might also like