CONSTRUCTION WORKS
Rates Committee ;
Ministry of Irrigation and Water Resources Management,
No. 500, T.B. Jayah Mawatha,
Colombo -10,
Sri Lanka.
ABBREVIATIONS
A
ac
avg
C.I.
CIF
CT
cu
cu.ft
cu.yd
cwt
D-Box
dia.
DPC
ft.
G.I.
gl
gpm
ha
HP
hrs
kg
kVA
lb
l
m
m2
m3
max.
mm
M.S.
Nos.
PVC
RCC
r/f
Rs.
sq
sq.ft
W
yd
Ampere
Acres
Average
Cast iron
Cost, Insurance and Freight
Crawler Tractor
Cube (100 cubic feet)
Cubic feet
Cubic yard
Hundredweight
Distribution box
Diameter
Damp Proof Coarse
Feet
Galvanized Iron
Gallon
Gallons per minute
Hectare
Horse Power
Hours
Kilo gramme
Kilo Volt Ampere
Pound
Litre
Metre
Square metre
Cubic metre
Maximum
Milli metre
Mild steel
Numbers
Poly Vinyl Chloride
Reinforced Cement Concrete
Reinforcement
Rupees
Square (100 square feet)
Square feet
Watt
Yard
-1-
PREAMBLE
1. SCOPE
The rates listed here are to enable preparation of "Engineer's Estimates" for irrigation and
settlement projects. The total specifications for the rates herein are described in "Technical
Specifications".
2. CONSTRUCTION AGENCIES
As purchase of Machinery and equipment will be made by State or Private sector and as Sri
Lankan labour will be employed, the basic unit rates are applicable for domestic construction
Agencies in the Public sector and Private sectors, according to the classification given below.
Class A -
Class B -
Class C -
3. ASSIGNMENT OF WORKS
It is recommended that Machinery intensive jobs be assigned to Class "A" and labour intensive
works to Class "C" construction agencies respectively.
Class "B" construction agencies may be assigned jobs requiring less Machinery power and
more manpower.
Conversion Factors
1m
3.2808 ft
1 ft
0.3048 m
1 Kg
2.2046 lb
1 lb
0.4536 kg
1 ha
2.47 ac
1 ac
0.4048 ha
1 cu.m
0.353 cu
1 cu
2.833 cu.m
1 sq.m
0.1076 sq
1 sq
9.2937 sq.m
1 M.ton
0.9842 ton
1 ton
1.016 M.ton
1 lit
0.22 gl
1 gl
4.54 lit
1 bushel
1.2844 cu.ft
1 cu.ft
0.7786 bushel
-2-
CONSTRUCTION
AGENCY
Building
Works
A
B
C
1.23
1.17
1.14
1.36
1.18
1.18
Note:
(i)
(ii)
(iii)
-3-
Category
Unskilled labour
660.00
2
3
4
Semi-skilled labour
Skilled (ordinary)
Skilled (carpenters, masons)
725.00
900.00
1,050.00
1,100.00
1,075.00
Item
Lanka Auto diesel
Lanka Petrol
Gelignite 60-80%
Electric detonators
Jumper steel, 7/8" dia.(2.5 lb/ft)
Set Exploder, Ohm meter & Hand siren
Bitumen 80/100
R/F bars, mild steel (all sizes)
R/F bars, tor steel (all sizes)
Class II shuttering planks, 1"x12"
Wire nails
4" dia.Round timber for scaffolding (0.2 cu.ft/ft.)
Unit
Price (Rs.)
l
l
lb
each
ft
10000cu
gl
lb
lb
m
kg
ft
each
each
each
each
each
each
each
each
each
each
each
per beam
84.00
137.00
338.00
98.21
125.00
322,000.00
460.00
49.61
50.41
114.00
352.00
12.50
660.00
126,000.00
93,000.00
84,500.00
73,000.00
62,000.00
46,000.00
40,700.00
31,000.00
24,000.00
21,000.00
2,250.00
25
per beam
1,130.00
26
27
each
each
1,200.00
2,700.00
each
2,200.00
each
1,450.00
each
each
1,500.00
200.00
lb
each
120.00
24,438.00
each
each
each
26,800.00
46,058.00
52,786.00
28
29
30
31
32
33
34
35
36
No.
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
Item
Unit
each
each
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
each
each
each
each
each
each
each
each
each
each
each
24" dia.
-do30" dia.
-do6" dia. RCC spun pipes
9" dia.
-do12" dia.
-do15" dia.
-do18" dia.
-do24" dia.
-do30" dia.
-do36" dia.
-do42" dia.
-do48" dia.
-do54" dia.
-do6" Collar for RCC pipes
9" dia.
-do12" dia.
-do15" dia.
-do18" dia.
-do24" dia.
-do30" dia.
-do36" dia.
-do42" dia.
-do48" dia.
-do54" dia.
-do-
Price (Rs.)
72,490.00
120,253.00
362.50
525.00
625.00
737.50
868.75
1,100.00
1,343.75
1,700.00
2,182.00
2,550.00
2,915.00
325.00
400.00
550.00
600.00
750.00
900.00
975.00
1,150.00
1,550.00
1,800.00
2,200.00
DPC tar
6
7
8
9
10
11
12
13
14
15
Unit
1000 Nos.
Price (Rs.)
6500.00
cu ft
each
450.00
660.00
gl
757.10
each
42.00
each
65.00
each
m
m
m
m
m
m
m
each
116.00
738.00
246.00
750.00
328.00
505.00
500.00
625.00
2200.00
each
4950.81
each
130.00
18
19
each
each
25.00
260.00
each
240.00
each
160.00
20
21
4"
-5-
No.
Item
22 Nickel door handle
23 Mortice door lock
24 Brass screws, assorted sizes in 100/pkt
25 3 mm thick figured glass sheet
26 Brass centre pivot (Hinge), 2 1/2"
27 Door rings
28 Hasp & staple, GI 4"
29 Pad lock, Brass 2"(Viro)
30 Brass casement stays, 10"
31 Brass casement fastners 4"
32 Brass window rings
33 Panel pins (3/4")
34 Brass fanlight catch
35 G.I.(2"x2") Welded mesh (12'x7')
36 Class 1 timber 6"x2"
-do4"x4"
37
-do6"x4"
38
-do5"x4"
39
-do5"x3"
40
-do2"x1" (Reepers)
41
-do2"x2"
42
-do- 10"x1"
43
-do8"x1"
44
45 Lunumidella ceiling planks 8"x3/4"
46 1 1/2"x3/8" Beading
47 1 1/4"x3/4" Moulding
48 Wood preservative, clear
49 Calicut pattern tiles - Gr.1
50 Calicut ridge tiles
51 Corrugated Asbestos sheets 10'x3'7"
52 Corrugated Asbestos Ridge sheet
53 4 1/2" GI roofing nuts, bolts & washers
54 6" dia. halfround, country tiles
55 Boiled lime (wt 50 lb/cu.ft)
56 Flat Asbestos sheets 4'x4'
57 Aluminium Plain sheet (gauge 17)
58 6" dia.half round/4 1/2" square PVC eaves gutter.
59 PVC gutter joiners
60 PVC gutter end caps
61 Gutter brackets
62 3 1/2" dia.PVC down pipe (in 12' length)
-doelbow
63
-dojoiners
64
Down
pipe
clips (straps)
65
66 Roll Plugs to fix screws
67 4 1/2" PVC running gutter head
68
-do- gutter box
69 Glue for binding lime/samara
-6-
Unit
each
each
pkt
sq.ft
each
each
each
each
each
each
each
100 g
each
sheet
m
m
m
m
m
m
m
m
m
m
m
m
l
each
each
sheet
pair
50 Nos.
each
cu.ft
sheet
sq ft
ft
each
each
Price (Rs.)
175.00
3900.00
660.00
50.00
60.00
85.00
110.00
550.00
130.00
100.00
75.00
190.00
120.00
3125.00
853.00
1150.00
1805.00
1250.00
875.00
75.00
135.00
830.00
558.00
165.00
91.86
137.80
290.00
38.00
50.00
1665.00
600.00
400.00
20.00
680.00
460.00
45.00
73.33
111.00
92.00
each
ft
24.00
51.00
each
each
each
each
each
each
156.00
115.00
24.00
1.50
256.00
609.00
kg
150.00
No.
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
Item
Unit
Price (Rs.)
each
each
kg
4l
4l
each
each
4l
l
4l
each
4l
4l
ft
each
each
each
each
pair
each
65.00
100.00
135.00
3360.00
2600.00
45.00
620.00
3142.00
964.00
760.00
420.00
3265.00
3152.00
166.00
1280.00
1553.00
12860.00
1850.00
450.00
2150.00
each
2925.00
each
3200.00
g
ft
each
each
ft
each
each
ft
each
each
ft
each
each
ft
each
each
each
each
each
each
each
each
each
each
2.25
12.92
16.00
22.00
36.38
30.00
31.00
57.23
43.00
40.00
70.76
95.07
75.10
124.58
148.84
115.16
110.00
22.00
154.00
420.00
235.00
800.00
315.00
1700.00
-7-
No.
116
117
118
119
120
121
122
Item
2" gate valve, brass
Ceramic urinal pan
Roll plugs
Chromium plated soap holder
Chromium plated tooth brush holder
Chromium plated towel holder (pair)
Bathroom mirror, size 500x400 mm.
Unit
each
each
each
each
each
each
each
Price (Rs.)
2400.00
2400.00
1.50
325.00
550.00
1200.00
1990.00
each
each
500.00
650.00
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
each
each
each
each
each
each
each
each
each
ft
each
each
m
ft
pkt
kg
each
each
pkt
each
each
each
each
each
each
m
m
1200.00
1250.00
150.00
575.00
425.00
995.00
60.00
100.00
29.00
166.00
110.00
250.00
19.85
6.30
25.00
190.00
20.00
20.00
930.00
125.00
120.00
71.00
80.00
60.00
60.00
48.66
290.63
152
153
154
155
each
m
each
each
375.00
66.00
295.00
375.00
156 6A MCBs
each
183.04
157
158
159
160
10A MCBs
16A MCBs
20A MCBs
32A MCBs
each
each
each
each
183.04
183.04
183.04
183.04
each
183.04
-8-
No.
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
Item
12-way MCB encloser
63A Isolator (2 Pole)
40A Isolator (2 Pole)
8-way MCB encloser
40A 30mA 2 Pole RCD (ELCB)
63A 30mA 2 Pole RCD (ELCB)
Roll plugs
2" dia. G.I. pipe for earth electrode
G.I. bracket with insulator etc. (3")
Swan neck holder
Ceiling lamp fittings (without bulb)
Suspension chains
Hooks & eyes (set)
Florescent lamp fittings 2' (set)
-do4' (set)
Florescent lamp tube (20 W)
-do(40 W)
15 A, 3 pin plug base with switch
Ceiling fan with regulator
Hook to hang ceiling fan 3/4" dia. T.S.
Electric bell
4-way MCB encloser
Bell push
Lamp ballast
125W Mercury bulb
40/0076 Flexible cable (2 core)
3/4" G.I. pipe
G.I. bracket with insulator etc. ( 3/4")
Aluminium connectors
13 A, Squire pin plug base with switch
6"x8"x15" cement blocks
River Sand
Electric cable 7/0036 Twin
Electric cable 7/0029 Twin
Unit
each
each
each
each
each
each
each
ft
each
each
each
m
each
each
each
each
each
each
each
each
each
each
each
each
each
m
ft
each
each
each
each
Cu
m
m
Price (Rs.)
758.92
776.79
656.25
450.00
2205.36
2366.07
1.50
140.00
420.00
125.00
550.00
105.00
35.00
550.00
625.00
90.00
80.00
430.00
4500.00
110.00
295.00
375.00
285.00
285.00
187.50
78.00
60.00
300.00
65.00
330.36
48.00
4500.00
199.20
126.40
Hourly Plant
Rate (Rs.)
11,772.03
19,518.46
638.18
446.72
223.36
325.60
9,540.35
6,603.02
5,666.01
3,461.45
765.37
2,481.81
19,606.33
14B
16
17
18
24
25A
25B
26
27
29
30A
30B
30C
31A
31B
31C
32A
32B
32C
33A
-do(idle)
Air compressor (600 cfm)
-do(300 cfm)
Pneumatic jack hammer (1 1/2" bit,50 lb) or Rock drill (w/o AC)
Secondary stone crusher (15 t/hr)
Front end loader 1.5-2.5 cu.yd
-do2.5-3.5 cu.yd
Concrete mixer 14/10 cu.ft
-do5/3 cu.ft
Pneumatic vibrator - 2" dia. (without AC)
Tractor(60 HP) & trailer (without load)
-do(with load)
-do(idle)
Lorry - 5 t (without load)
-do(with load)
-do(idle)
Explosives van - 3 t (without load)
-do(with load)
-do(idle)
35 t Low Bed Trailer with prime mover (without load)
9,182.13
2,289.61
1,610.10
213.11
5,463.18
5,040.22
5,781.62
597.27
391.72
102.36
1,873.34
2,302.79
412.97
1,924.87
2,354.32
732.24
1,647.42
1,933.02
642.70
7,938.56
33B
33C
37
38
43
44
45
-do(with load)
-do(idle)
Road roller (10-15 t)
4" dia. centrifugal pump (450 gpm)
Dump truck - 5 cu.yd (working)
-do(idle)
8,891.96
2,637.58
2,941.24
496.66
2,962.94
586.29
9,771.30
Note: The above hourly plant rates are used in the analysis of rates in this report. These are
not meant to be used for hiring of plants. But these plant rates can be used to prepare estimates for
evaluation of Tenders or Quotations for hiring of plants on hourly basis.
However, under special cases where m/c & equipment has to be hired on hourly basis such as
very urgent needs & where works cannot be quantified, these plant rates could be used with
the prior approval of the head of the organization.
- 10 -
Lorry
each
each
each
12 Tiles
13 C.I.Gates 9"
14 C.I.Gates 12,15,18"
gl
ton
ton
21 Bitumen
22 Heavy Loads
23
cu.ft
24 Asbestos sheets
-do-
ft
gl
ft
ft
Lorry
ft
Lorry
Lorry
Lorry
Lorry
Lorry
Lorry
Lorry
Lorry
Lorry
Lorry
200
900
24
48
88
224
18
37
75
2500
4000
220
5000
100
130
(Units)
7086.63
28.40
1064.94
532.47
290.44
114.10
1419.91
690.77
340.78
4.53
1.25
44.26
44.14
255.58
196.60
(Rs.)
Cost
Tractor Trailer
150
127.79
M/C
- 11 -
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Explosives Van
Tractor Trailer
100
520
700
16
32
48
126
11
21
42
125
100
2.5
2.2
2.3
0.6
0.7
56
60
(Units)
Capacity
Local Transport
Tractor Trailer
Tractor Trailer
Tractor Trailer
200
150
150
150
150
150
150
150
150
60
20
50
200
150
150
(Miles)
Capacity Distance
Main Transport
Explosives Van
each
lb
sq
11 Bricks
Explosives
cu
Lorry
Lorry
M/C
cu.ft
cu
cu
cu
cu
cwt
bag
Unit
10 Sawn timber
Sand, Gravel
Metal, Rubble
Metal, Rubble
Sand, Gravel
R/F Steel
Material
No.
1.5
15
(Miles)
Distance
37.46
7.20
2.42
179.46
89.73
59.82
22.79
261.03
136.73
68.37
22.97
0.94
390.85
1,302.06
1,156.87
991.63
2,154.72
1,846.91
51.27
47.86
(Rs.)
Cost
244.46
165.25
138.16
7,086.63
35.60
2.42
1,244.41
622.20
350.26
136.89
1,680.95
827.50
409.15
4.53
1.25
67.23
45.07
390.85
1,302.06
1,156.87
991.63
2,154.72
1,846.91
306.86
201.08
negligible
negligible
1.38
0.92
41.25
20.63
10.31
4.58
82.50
41.25
20.63
0.55
0.55
6.60
0.09
330.00
1,031.25
1,031.25
16.50
10.31
Cost (Rs.)
labour
Transport
Cost (Rs.)
Unloading
Total
Loading/
366.33
Cost )
Material
(25% of the
36.98
3.34
1,285.66
642.82
360.57
141.47
1,763.45
868.75
429.77
5.08
1.80
73.83
45.17
720.85
1,302.06
1,156.87
991.63
3,185.97
2,878.16
323.36
254.77
(Rs.)
Load/UnLoad)
(Transport +
Total Cost
Description of Work
Earth excavation or borrow and spoil to waste or fill material, cut 03 ft lift upto 3ft, spread 100ft.
As in Rate 3.1A but cut 3-5', lift upto 5', spread 100'
As in Rate 3.1A but cut 5-10', lift upto 10', spread 100'
As in Rate 3.1A but cut 10-15', lift upto 15', spread 100'
As in Rate 3.1A but cut 15-20', lift upto 20', spread 100'
As in Rate 3.1A but cut 20-25', lift upto 25', spread 100'
As in Rate 3.1A but cut 25-30', lift upto 30', spread 100'
As in Rate 3.1A but cut 30-35', lift upto 35', spread 100'
As in Rate 3.1A but cut 35-40', lift upto 40', spread 100'
As in Rate 3.1A but cut 40-45', lift upto 45', spread 100'
As in Rate 3.1A but cut 45-50', lift upto 50', spread 100'
As in Rate 3.1A but cut 50-55', lift upto 55', spread 100'
As in Rate 3.1A but cut 55-60', lift upto 60', spread 100'
Haul earth 1/4 mile
Haul earth 1/2 mile
Haul earth 3/4 mile
3.1A
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.25
3.26
3.27
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Rear Dumper
Rear Dumper
Rear Dumper
-do-
-do-
-do-
-do-
-do-
-do-
-do-
B-Hoe/ Rear
Dumper
-do-
-do-
-do-
- 12 -
280.00
286.50
293.00
307.75
313.50
320.75
327.75
77.00
97.55
118.75
185.75
189.50
194.25
198.75
274.75
80,273.00
8,884.00
-do-
2.5
m3
m3
m3
m3
m3
ha
2.4
16,595.00
185.75
CT200HP
CT300HP &
CT200HP
ha
B-Hoe
-do-
ha
2.3
107,204.00
54,793.00
81,741.00
m3
-do-
CT300HP
ha
ha
2.2
30,653.00
-do-
2.1
61,306.00
-do-
ha
Light Jungle
CT200HP
ha
ha
-do-
1.4
Medium Jungle
-do-
113,798.00
CT300HP
ha
120,695.00
Basic Unit
Rate(Rs.)
ha
Principal M/C
-do-
1.3
Common Jungle
Unit
1.5
-do-
1.2
1.1
Rate
No.
217.50
221.75
227.25
232.50
321.50
327.75
335.25
343.00
360.00
366.75
375.25
383.50
90.10
114.00
139.00
228.50
233.00
238.75
244.25
338.00
344.50
352.50
360.50
378.50
385.75
394.50
403.25
94.70
119.75
146.00
93,920.00
98,736.00
217.50
10,395.00
10,928.00
228.50
19,416.00
20,412.00
35,864.00
37,703.00
64,108.00
71,728.00
75,406.00
125,429.00
95,637.00
100,542.00
67,395.00
133,144.00
131,861.00
141,213.00
139,972.00
Class-B
148,455.00
Class-A
Machinery
319.25
326.75
334.25
351.00
357.50
365.75
373.75
87.80
111.00
135.25
211.75
216.00
221.25
226.50
313.25
211.75
91,512.00
10,128.00
18,919.00
122,212.00
62,464.00
34,944.00
69,889.00
93,185.00
129,730.00
137,592.00
Class-C
1,131.00
1,165.00
1,210.00
1,254.00
-
613.00
971.50
1,001.00
1,037.00
1,079.00
517.50
30,653.00
61,306.00
Basic Unit
Rate(Rs.)
1,391.00
1,433.00
1,489.00
1,542.00
-
754.00
1,195.00
1,232.00
1,275.00
1,327.00
637.00
37,703.00
75,406.00
Class-A
1,323.00
1,363.00
1,416.00
1,467.00
-
717.50
1,137.00
1,172.00
1,213.00
1,263.00
605.50
35,864.00
71,728.00
Class-B
Manual
1.3
1.2
1.1
Rate
No.
2.5
2.4
2.3
2.2
2.1
1,289.00
1,328.00
1,380.00
1,429.00
-
699.00
1,108.00
1,142.00
1,182.00
1,230.00
3.27
3.26
3.25
3.12
3.11
3.1
3.9
3.8
3.7
3.6
3.5
3.4
3.3
3.2
3.1
590.00 3.1A
34,944.00 1.5
69,889.00 1.4
Class-C
Common excavation and spoil to waste or fill material, cut 0-3 ft, lift
upto 3 ft, spread 100 ft.
As in Rate 4.1A but cut 3-5', lift upto 5', spread 100'
As in Rate 4.1A but cut 5-10', lift upto 10', spread 100'
As in Rate 4.1A but cut10-15', lift upto 15', spread 100'
As in Rate 4.1A but cut15-20', lift upto 20', spread 100'
As in Rate 4.1A but cut 20-25', lift upto 25', spread 100'
As in Rate 4.1A but cut 25-30', lift upto 30', spread 100'
As in Rate 4.1A but cut 30-35', lift upto 35', spread 100'
As in Rate 4.1A but cut 35-40', lift upto 40', spread 100'
As in Rate 4.1A but cut 40-45', lift upto 45', spread 100'
As in Rate 4.1A but cut 45-50', lift upto 50', spread 100'
As in Rate 4.1A but cut 50-55', lift upto 55', spread 100'
As in Rate 4.1A but cut 55-60', lift upto 60', spread 100'
Haul common excavation
Common excavation and spoil to waste or fill material, cut 0-5 ft, lift
5 ft, haul 1/4 mile.
As in Rate 4.26, but cut 5-10', lift 10', haul 1/4 mile
As in Rate 4.26, but cut 5-10', lift 10', haul 1/2 mile
As in Rate 4.26, but cut 5-10', lift 10', haul 3/4 mile
As in Rate 4.26, but cut 10-15', lift 15', haul 1/4 mile
As in Rate 4.26, but cut 10-15', lift 15', haul 1/2 mile
As in Rate 4.26, but cut 10-15', lift 15', haul 3/4 mile
As in Rate 4.26, but cut 15-20', lift 20', haul 1/4 mile
As in Rate 4.26, but cut 15-20', lift 20', haul 1/2 mile
As in Rate 4.26, but cut 15-20', lift 20', haul 3/4 mile
3.43
4.1A
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.25
4.26
4.27
4.28
4.29
4.30
4.31
4.32
4.33
4.34
4.35
4.36
4.37
Description of Work
3.28
3.29
Rate
No.
211.25
216.25
221.50
299.25
304.75
311.75
319.25
334.50
340.75
348.25
356.25
-do-
236.25
306.25
171.25
241.75
313.25
175.25
247.50
320.50
179.50
253.25
328.25
-do-do-do-do-do-do-do-do-do-do-do-
m3
m3
3
- 13 -
167.50
Scraper
Rear Dumper
-do-
-do-
-do-
-do-
-do-
-do-
B-Hoe/ Rear
Dumper
-do-
-do-
-do-
207.00
-do-
m3
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
207.00
138.75
19.95
Basic Unit
Rate(Rs.)
B-Hoe
Rear Dumper
Rear Dumper
Principal M/C
m3
m3
m3
m3
Unit
247.00
240.75
1,284.00
1,044.00
253.00
246.50
1,320.00
1,073.00
259.00
252.50
1,364.00
1,109.00
350.00
341.00
1,416.00
1,151.00
356.75
347.50
1,480.00
1,203.00
364.75
355.50
1,522.00
1,237.00
373.50
363.75
1,578.00
1,283.00
391.25
381.25
1,631.00
1,326.00
398.50
388.25
407.50
397.00
417.00
406.25
As in Rate 3.25 to 3.29 & Rate 3.43
196.00
276.50
358.25
200.50
282.75
366.50
205.00
289.50
375.25
210.00
296.50
384.25
206.00
290.75
376.75
210.75
297.25
385.25
215.50
304.25
394.50
220.75
311.75
403.75
374.25
288.75
204.50
365.50
282.00
199.75
357.25
275.50
195.25
349.00
269.25
191.00
685.50
843.00
716.50
259.75
266.00
272.50
368.00
375.00
383.50
392.50
411.25
419.00
428.50
438.25
236.00
582.50
242.25
236.00
254.75
159.25
Class-A
-
242.25
129.25
254.75
Class-C
158.25
22.75
Basic Unit
Rate(Rs.)
Class-B
162.25
23.35
1,221.00
1,256.00
1,297.00
1,347.00
1,408.00
1,447.00
1,501.00
1,551.00
-
802.00
681.50
151.25
Class-B
-
Manual
Class-A
170.75
24.55
Machinery
3.29
3.28
Rate
No.
1,190.00
1,224.00
1,264.00
1,312.00
1,371.00
1,410.00
1,462.00
1,512.00
-
4.37
4.36
4.35
4.34
4.33
4.32
4.31
4.3
4.29
4.28
4.27
4.26
4.25
4.12
4.11
4.1
4.9
4.8
4.7
4.6
4.5
4.4
4.3
4.2
781.00 4.1
664.00 4.1A
147.50 3.43
Class-C
-
As in Rate 4.26, but cut 20-25', lift 25', haul 1/4 mile
As in Rate 4.26, but cut 20-25', lift 25', haul 1/2 mile
As in Rate 4.26, but cut 20-25', lift 25', haul 3/4 mile
As in Rate 4.26, but cut 25-30', lift 30', haul 1/4 mile
As in Rate 4.26, but cut 25-30', lift 30', haul 1/2 mile
As in Rate 4.26, but cut 25-30', lift 30', haul 3/4 mile
As in Rate 4.26, but cut 30-35', lift 35', haul 1/4 mile
As in Rate 4.26, but cut 30-35', lift 35', haul 1/2 mile
As in Rate 4.26, but cut 30-35', lift 35', haul 3/4 mile
As in Rate 4.26, but cut 35-40', lift 40', haul 1/4 mile
As in Rate 4.26, but cut 35-40', lift 40', haul 1/2 mile
As in Rate 4.26, but cut 35-40', lift 40', haul 3/4 mile
As in Rate 4.26, but cut 40-45', lift 450', haul 1/4 mile
As in Rate 4.26, but cut 40-45', lift 450', haul 1/2 mile
As in Rate 4.26, but cut 40-45', lift 450', haul 3/4 mile
As in Rate 4.26, but cut 45-50', lift 50', haul 1/4 mile
As in Rate 4.26, but cut 45-50', lift 50', haul 1/2 mile
As in Rate 4.26, but cut 45-50', lift 50', haul 3/4 mile
(5) GRAVEL EXCAVATION
As in Rate Number 5.1A but cut 3-5', lift upto 5', spread 100'
As in Rate Number 5.1A but cut 5-10', lift upto 10', spread 100'
As in Rate Number 5.1A but cut 10-15', lift upto 15', spread 100'
As in Rate Number 5.1A but cut 15-20', lift upto 20', spread 100'
As in Rate Number 5.1A but cut 20-25', lift upto 25', spread 100'
As in Rate Number 5.1A but cut 25-30', lift upto 30', spread 100'
As in Rate Number 5.1A but cut 30-35', lift upto 35', spread 100'
As in Rate Number 5.1A but cut 35-40', lift upto 40', spread 100'
As in Rate Number 5.1A but cut 40-45', lift upto 45', spread 100'
As in Rate Number 5.1A but cut 45-50', lift upto 50', spread 100'
As in Rate Number 5.1A but cut 50-55', lift upto 55', spread 100'
4.39
4.40
4.41
4.42
4.43
4.44
4.45
4.46
4.47
4.48
4.49
4.50
4.51
4.52
4.53
4.54
4.55
5.1A
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11
Description of Work
4.38
Rate
No.
193.25
272.50
353.75
195.50
276.50
358.50
200.75
283.25
368.25
209.50
295.50
383.75
212.25
299.50
389.25
215.25
215.25
219.00
223.75
228.00
308.50
313.75
320.25
326.75
344.50
350.25
357.75
Scraper
-do-
B-Hoe
-do-do-do-
m3
m3
m3
3
m
m3
m3
m3
m3
m3
m3
m3
m3
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
- 14 -
345.00
-do-
-do-
265.75
-do-
m3
m
188.25
Basic Unit
Rate(Rs.)
-do-
Principal M/C
m3
Unit
Class-B
220.25
311.00
403.50
226.00
319.00
414.00
229.00
323.50
419.50
235.00
331.50
430.75
245.00
346.00
449.00
248.50
350.50
455.25
251.75
251.75
256.25
261.75
267.00
360.75
367.00
374.75
382.25
403.00
410.00
418.50
326.75
424.25
237.50
335.25
435.25
240.75
340.00
441.00
247.00
348.50
452.75
257.75
363.75
472.00
261.25
368.50
478.75
264.75
264.75
269.50
275.25
280.50
379.25
386.00
394.00
402.00
423.75
431.00
440.00
Machinery
255.00
260.00
351.50
357.75
365.25
372.50
392.75
399.50
407.75
249.75
245.25
245.25
310.75
403.50
223.00
315.25
408.75
229.00
323.00
419.75
238.75
337.00
437.50
242.00
341.50
443.75
220.25
393.25
303.00
Class-C
214.75
1,073.00
1,109.00
1,151.00
1,203.00
1,237.00
1,283.00
1,326.00
-
1,044.00
685.50
582.50
Basic Unit
Rate(Rs.)
1,320.00
1,364.00
1,416.00
1,480.00
1,522.00
1,578.00
1,631.00
-
1,284.00
843.00
716.50
Class-A
-
1,256.00
1,297.00
1,347.00
1,408.00
1,447.00
1,501.00
1,551.00
-
1,221.00
802.00
681.50
Class-B
-
Manual
4.55
4.54
4.53
4.52
4.51
4.5
4.49
4.48
4.47
4.46
4.45
4.44
4.43
4.42
4.41
4.4
4.39
4.38
Rate
No.
1,224.00
1,264.00
1,312.00
1,371.00
1,410.00
1,462.00
1,512.00
-
5.11
5.1
5.9
5.8
5.7
5.6
5.5
5.4
5.3
1,190.00 5.2
781.00 5.1
664.00 5.1A
Class-C
-
Haul Gravel
5.13
As in Rate Number 6.1 but cut 10-15', lift upto 15', spread 100'
As in Rate Number 6.1 but cut 15-20', lift upto 20', spread 100'
As in Rate Number 6.1 but cut 20-25', lift upto 25', spread 100'
As in Rate Number 6.1 but cut 25-30', lift upto 30', spread 100'
As in Rate Number 6.1 but cut 30-35', lift upto 35', spread 100'
As in Rate Number 6.1 but cut 35-40', lift upto 40', spread 100'
As in Rate Number 6.1 but cut 40-45', lift upto 45', spread 100'
As in Rate Number 6.1 but cut 45-50', lift upto 50', spread 100'
As in Rate Number 6.1 but cut 50-55', lift upto 55', spread 100'
As in Rate Number 6.1 but cut 55-60', lift upto 60', spread 100'
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
6.11
6.12
6.13
7.4
7.5
7.6
7.7
7.8
-do-
Rock excavation and spoil to waste/quarry products, cut 0-5 ft, lift
upto 5 ft.
7.3
7.2
7.1
As in Rate Number 6.1 but cut 05-10', lift upto 10', spread 100'
6.2
Soft rock excavation & spoil to waste, cut 0-5', lift upto 5', spread
100'
6.1
As in Rate Number 5.1A but cut 55-60', lift upto 60', spread 100'
Description of Work
5.12
Rate
No.
321.75
327.50
333.75
424.00
431.25
439.00
447.50
471.00
479.00
487.25
496.75
-do-do-doB-Hoe/ Rear
Dumper
-do-do-do-do-do-do-doRear Dumper
m3
m3
3
m3
3
38.85
42.65
45.80
48.85
51.80
54.40
{-do- + Rear
Dumper}
-do-do-do-do-do-
m3
m3
3
m3
- 15 -
691.50
-do-
m3
3
968.50
{Air Compressor+
Jack Hamer+Dozer+
FEL}
m3
m3
316.50
364.50
Basic Unit
Rate(Rs.)
B-Hoe
Rear Dumper
-do-
Principal M/C
m3
m3
Unit
Class-C
415.75
-
Basic Unit
Rate(Rs.)
376.50
383.00
390.50
496.25
504.50
513.50
523.50
551.00
560.00
570.00
581.00
396.00
402.75
410.50
521.50
530.50
539.50
550.50
579.50
589.00
599.50
611.00
566.00
555.50
546.00
537.00
510.00
500.00
491.75
483.50
380.50
373.25
367.00
360.75
1,700.00
1,657.00
1,611.00
1,577.00
1,525.00
1,483.00
1,447.00
1,418.00
1,059.00
1,133.00
809.50
45.50
49.95
53.60
57.15
60.65
63.65
1,191.00
851.00
47.80
52.50
56.35
60.05
63.75
66.90
62.00
59.05
55.70
52.25
48.65
44.30
788.50
1,104.00
552.00
517.50
466.00
423.75
388.25
358.50
1,137.00
1,592.00
370.25
Class-B
426.75
389.25
Class-A
448.50
Machinery
678.50
637.00
573.00
521.00
477.75
441.00
1,398.00
1,958.00
2,091.00
2,038.00
1,982.00
1,940.00
1,876.00
1,824.00
1,780.00
1,744.00
1,303.00
Class-A
-
645.50
605.50
545.00
495.75
454.25
419.50
1,330.00
1,862.00
1,989.00
1,938.00
1,885.00
1,845.00
1,784.00
1,735.00
1,694.00
1,659.00
1,239.00
Class-B
-
Manual
5.13
5.12
Rate
No.
6.13
6.12
6.11
6.1
629.00 7.8
590.00 7.7
531.00 7.6
483.00 7.5
442.75 7.4
408.75 7.3
1,296.00 7.2
1,814.00 7.1
1,938.00 6.9
1,889.00 6.8
1,837.00 6.7
1,798.00 6.6
1,739.00 6.5
1,690.00 6.4
1,650.00 6.3
1,616.00 6.2
1,207.00 6.1
Class-C
-
245.00
259.50
273.75
288.25
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
m
m3
3
m
m3
7.18
7.19
7.20
Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1/2
mile
Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 3/4
mile.
Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 mile.
Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 1/4
mile.
8.7
8.8
8.9
8.10
8.1
8.2
8.3
8.4
8.5
8.6
305.00
361.75
326.50
m3
m3
m3
- 16 -
234.75
-do-
m3
-do-
-do-
-do-
Scraper
Scraper
151.25
213.75
277.00
328.75
166.50
m3
m3
m3
m3
m3
m3
230.75
Rear Dumper
m3
7.17
216.25
Rear Dumper
202.00
Rear Dumper
7.16
7.15
187.75
Rear Dumper
m3
7.14
66.00
-do-
7.13
63.90
-do-
m
3
7.12
61.70
-do-
7.11
m3
7.10
59.55
7.9
-do-
Basic Unit
Rate(Rs.)
m3
Principal M/C
57.15
Unit
-do-
Description of Work
m3
Rate
No.
72.20
74.80
77.25
219.50
236.25
253.25
270.00
286.75
303.50
320.50
337.25
75.90
78.60
81.20
230.75
248.50
266.25
283.75
301.50
319.25
336.75
354.50
177.00
250.00
324.00
384.50
194.75
274.75
356.75
423.25
382.00
186.25
262.75
340.50
404.25
204.75
289.00
375.00
445.00
401.50
69.65
73.20
Class-B
66.85
Machinery
372.25
412.50
347.50
267.75
172.50
243.75
315.75
374.75
189.75
328.50
312.25
295.75
279.50
263.00
246.75
230.25
214.00
75.25
72.85
70.35
67.85
Class-C
65.15
517.50
-
129.25
640.50
597.50
Basic Unit
Rate(Rs.)
637.00
-
159.25
788.00
Class-A
735.00
605.50
-
151.25
749.50
Class-B
699.00
Manual
Rate
No.
7.19
7.18A
7.18
7.17A
7.17
7.16
7.15
7.14
7.13
7.12
7.11
590.00
-
8.1
8.9
8.8
8.7
8.6
8.5
8.4
8.3
8.2
8.1
147.50 7.2
730.50 7.1
Class-C
681.00 7.9
204.25
264.75
314.50
128.00
100.50
76.60
48.15
Scraper
-do-do-do-
m3
m3
m3
m3
m3
m3
m3
m3
m3
Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 1/4 mile.
Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 1/2 mile.
Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 3/4
mile.
Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 1 mile.
Borrow earth from Spoil Dump, cut 0- 5 ft, lift upto 5 ft, haul 200 ft.
8.14
8.15
8.16
8.17
8.18
8.19
8.20
8.21
8.22
1,309.00
1,588.00
{Air Compressor+
Jack Hammer+
Manual}
-do-
m3
m3
10.1
10.2
- 17 -
403.75
B-Hoe
m3
9.2
141.25
9.1
B-Hoe
m3
144.75
m3
Borrow earth from borrow areas, cut 0-5 ft, lift upto 5 ft, haul 200
ft.
8.13
-do-
360.50
-do-
m3
Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 2 mile.
8.12
-
386.50
B-Hoe + Rear
Dumper
m3
8.11
8.11A Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 3/4
mile.
Basic Unit
Rate(Rs.)
343.50
Principal M/C
B-Hoe + Rear
Dumper
Unit
m3
Description of Work
Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 1/2
mile.
Rate
No.
421.75
443.25
310.00
368.00
325.75
387.00
1,531.00
1,859.00
1,610.00
1,954.00
472.50
496.75
89.60
56.35
94.20
59.25
165.25
117.75
123.75
173.50
149.75
157.50
239.00
251.25
169.25
178.00
452.00
475.25
Class-B
401.75
Machinery
1,811.00
1,492.00
460.25
161.00
87.30
54.90
114.75
145.75
358.50
302.00
233.00
165.00
410.75
440.50
Class-C
391.50
1,588.00
1,309.00
403.75
141.25
132.75
205.75
256.00
495.75
582.50
Basic Unit
Rate(Rs.)
1,954.00
1,610.00
496.75
173.50
163.25
-
253.00
1,859.00
1,531.00
472.50
165.25
155.25
-
240.75
299.50
580.00
609.50
315.00
681.50
716.50
-
Class-B
-
Class-A
-
Manual
8.12
8.11A
8.11
Rate
No.
8.17
8.16
8.15
8.14
1,811.00 10.2
1,492.00 10.1
460.25 9.2
161.00 9.1
151.25 8.21
8.22
-
234.50 8.2
292.00 8.19
565.00 8.18
664.00 8.13
Class-C
-
2,008.00
2,684.00
2,877.00
3,205.00
3,514.00
4,054.00
{Air Compressor+
Jack Hammer+
Stone Crusher}
-do-do-do-do-do-
m3
m3
m3
3
m3
10.4
10.5
10.6
10.7
10.8
11.1
11.2
11.3
11.4
11.5
11.6
11.7
11.8
11.9
11.10
11.11
11.12
11.13
11.14
11.15
3,759.00
3,091.00
2,056.00
256.75
336.75
416.50
496.50
576.00
656.00
736.00
816.00
895.50
975.50
-do-do-doTractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
m3
m3
m3
m3
m3
m3
3
m3
3
m3
m3
- 18 -
4,327.00
{Air Compressor
+Jack Hammer+CT
+ Manual}
m3
1,725.00
B-Hoe + CT
m3
1,891.00
-do-
10.3
m3
Unit
Basic Unit
Rate(Rs.)
Description of Work
Principal M/C
Rate
No.
3,617.00
2,406.00
300.50
394.00
487.50
581.00
674.00
767.50
861.00
954.50
1,048.00
1,141.00
3,802.00
2,529.00
316.00
414.25
512.50
610.50
709.00
807.00
905.50
1,003.00
1,102.00
1,200.00
4,743.00
4,987.00
4,399.00
4,111.00
4,322.00
4,624.00
3,750.00
3,942.00
5,062.00
3,366.00
3,539.00
5,322.00
3,141.00
3,302.00
2,018.00
2,349.00
2,470.00
2,122.00
Class-B
2,213.00
Machinery
1,112.00
1,021.00
930.00
839.00
748.00
657.00
566.00
475.00
383.75
292.75
2,344.00
3,524.00
4,286.00
4,933.00
1,967.00
4,622.00
4,006.00
3,654.00
3,280.00
3,060.00
2,289.00
Class-C
2,156.00
2,173.00
3,207.00
3,876.00
4,443.00
293.75
4,054.00
3,514.00
3,205.00
2,877.00
2,684.00
2,008.00
1,891.00
Basic Unit
Rate(Rs.)
2,672.00
3,945.00
4,768.00
5,465.00
361.50
4,987.00
4,322.00
3,942.00
3,539.00
3,302.00
2,470.00
Class-A
2,327.00
2,542.00
3,753.00
4,535.00
5,199.00
343.75
4,743.00
4,111.00
3,750.00
3,366.00
3,141.00
2,349.00
Class-B
2,213.00
Manual
Rate
No.
11.15
11.14
11.13
11.12
11.11
11.1
11.9
11.8
11.7
11.6
2,477.00 11.5
3,657.00 11.4
4,419.00 11.3
5,065.00 11.2
335.00 11.1
4,622.00 10.8
4,006.00 10.7
3,654.00 10.6
3,280.00 10.5
3,060.00 10.4
2,289.00 10.3A
Class-C
2,156.00 10.3
228.50
253.00
277.25
301.75
326.25
350.75
299.75
392.75
486.00
579.00
672.50
765.50
858.50
952.00
1,045.00
1,138.00
178.25
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Tractor Trailer
m
m3
m3
3
m
m3
3
255.25
280.75
306.50
332.25
357.75
383.50
409.25
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
m3
3
m
m3
m3
3
m
m3
- 19 -
229.50
Rear Dumper
m3
203.75
Rear Dumper
Rear Dumper
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Tractor Trailer
204.00
Rear Dumper
m3
179.50
Rear Dumper
11.16
11.17
11.18
11.19
11.20
11.21
11.22
11.23
11.24
11.25
11.16A
155.25
Rear Dumper
130.75
Basic Unit
Rate(Rs.)
Principal M/C
Rear Dumper
Unit
m3
Description of Work
Rate
No.
Class-B
153.00
181.50
210.00
238.75
267.25
296.00
324.50
353.25
381.75
410.25
350.75
459.75
568.50
677.50
786.50
895.50
1,004.00
1,113.00
1,222.00
1,331.00
208.50
238.50
268.50
298.50
328.50
358.50
388.75
418.75
448.75
478.75
190.75
221.00
251.00
281.00
311.00
341.25
371.25
401.25
431.50
368.50
483.25
597.50
712.50
827.00
941.50
1,056.00
1,171.00
1,285.00
1,400.00
219.25
250.75
282.25
313.75
345.50
377.00
408.50
440.25
471.75
503.00
Machinery
466.50
437.25
408.00
378.75
349.50
320.25
291.00
261.75
232.25
341.75
447.75
554.00
660.00
766.50
872.50
979.00
1,085.00
1,191.00
1,297.00
203.00
399.75
372.00
344.00
316.25
288.25
260.50
232.50
204.75
176.75
Class-C
149.00
Basic Unit
Rate(Rs.)
Class-A
-
Class-B
-
Manual
Class-C
-
11.25A
11.24A
11.23A
11.22A
11.21A
11.20A
11.19A
11.18A
11.17A
11.16A
11.25
11.24
11.23
11.22
11.21
11.20
11.19
11.18
11.17
11.16
11.15A
11.14A
11.13A
11.12A
11.11A
11.10A
11.9A
11.8A
11.7A
11.6A
Rate
No.
Haul rip-rap over 9" for slope protection, 0.5 mile including loading.
Haul rip-rap over 9" for slope protection, 1.0 mile including loading.
Haul rip-rap over 9" for slope protection, 1.5 mile including loading.
Haul rip-rap over 9" for slope protection, 2.0 mile including loading.
Haul rip-rap over 9" for slope protection, 2.5 mile including loading.
Haul rip-rap over 9" for slope protection, 3.0 mile including loading.
Haul rip-rap over 9" for slope protection, 3.5 mile including loading.
Haul rip-rap over 9" for slope protection, 4.0 mile including loading.
Haul rip-rap over 9" for slope protection, 4.5 mile including loading.
Haul rip-rap over 9" for slope protection, 5.0 mile including loading.
(13) GRAVEL/TARMAC SURFACING FOR ROADWAY
12.1
12.2
12.3
12.4
12.5
12.6
12.6A
12.7
12.7A
12.8
12.8A
12.9
12.10
12.11
12.12
12.13
12.14
12.15
12.16
12.17
12.18
12.19
12.20
13.1
13.2
Description of Work
Rate
No.
1,718.00
1,425.00
94.30
116.50
139.00
161.25
183.75
206.00
-do-
m3
m3
m2
m2
m2
m2
m2
m2
m3
456.50
480.75
B-Hoe+CT
do-+Sheep Foot
Roller
m3
m3
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
- 20 -
202.00
230.75
259.50
288.25
317.00
345.75
374.25
403.00
431.75
460.50
Rear Dumper
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Rear Dumper
m3
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
-do-
2,036.00
456.50
Basic Unit
Rate(Rs.)
(Air Compressor
+Jack Hammer+CT}
B-Hoe +CT
Principal M/C
m3
m2
m3
Unit
2,603.00
236.25
270.00
303.50
337.25
370.75
404.50
438.00
471.75
505.00
538.50
534.00
562.50
248.50
283.75
319.25
354.50
389.75
425.25
460.50
495.75
531.00
566.50
561.50
591.00
548.00
520.00
230.25
263.00
295.75
328.50
361.25
394.00
426.75
459.50
492.25
525.00
569.50
517.00
700.50
636.00
2,117.00
2,010.00
1,959.00
2,221.00
1,805.00
1,667.00
1,624.00
1,882.00
1,530.00
110.25
107.50
136.50
133.00
162.50
158.50
188.75
184.00
215.00
209.25
241.00
234.75
As in Rate Nos. 11.6 to 11.15 & 11.6A to 11.15A
2,322.00
2,114.00
1,752.00
116.00
143.50
171.00
198.50
226.00
253.50
92.80
636.00
2,383.00
75.45
517.00
Class-A
2,505.00
520.00
Class-C
Basic Unit
Rate(Rs.)
534.00
Class-B
666.50
605.00
2,112.00
1,791.00
-
2,476.00
88.30
605.00
Class-B
Manual
561.50
Class-A
Machinery
12.20
12.19
12.18
12.17
12.16
12.15
12.14
12.13
12.12
12.11
12.10
12.9
12.8A
12.8
12.7A
12.7
12.6A
12.6
12.5
12.4
649.50 13.2
589.50 13.1
2,058.00
1,745.00
-
2,413.00 12.3
86.05 12.1
589.50 12.2
Class-C
254.25
159.25
B-Hoe+Road
Roller
-do-
m3
m2
13.6
13.8
13.9
3,029.00
4,051.00
5,761.00
297.50
186.25
3,184.00
4,259.00
6,056.00
312.75
195.75
- 21 -
m2
As in Rate Number 15.5 but for rise over 40ft. upto 60ft.
15.7
m2
15.6
m2
Erection and dismantling scaffold for each 0-5 ft lift in rise 10'-20'
(each of 10 uses of scaffold).
15.5
m2
15.4
m
m2
15.2
15.3
m2
181.50
290.00
5,613.00
3,947.00
2,951.00
Class-C
2,812.00
15.1
Kg
Kg
14.5
Kg
Kg
14.4
Kg
(14) REINFORCEMENT
Cutting, bending & placing mild steel reinforcement, lift 0-5 ft. haul
150 miles Lorry and 8 miles Tractor Trailer.
As in Rate Number 14.1 but for Tor steel.
-do-
14.3
14.2
14.1
13.7
Class-B
2,886.00
Machinery
4,924.00
-do-
m3
13.5
m2
m3
3,462.00
-do-
m3
13.4
2,589.00
13.3
2,466.00
Basic Unit
Rate(Rs.)
m3
Principal M/C
13.3A Furnishing placing & compacting 4" metal base excluding haul.
Unit
{Air Compresso
+Jack
Hammer+Road
Roller}
-do-
Description of Work
m3
Rate
No.
76.85
61.45
45.70
1,677.00
397.00
1,280.00
184.00
0.45
162.75
160.75
32.65
32.55
146.00
241.00
4,924.00
3,462.00
2,466.00
2,466.00
Basic Unit
Rate(Rs.)
1,963.00
53.50
71.90
89.90
2,063.00
56.20
75.60
94.50
0.50
0.55
464.50
1,498.00
190.50
200.25
488.50
1,575.00
188.25
197.75
215.25
38.20
40.15
226.25
38.10
170.75
282.00
5,761.00
4,051.00
2,886.00
Class-B
2,886.00
40.05
179.50
296.50
6,056.00
4,259.00
3,034.00
Class-A
3,034.00
Manual
Rate
No.
87.60 15.7
70.05 15.6
52.10 15.5
1,912.00 15.4
452.75 15.2
1,460.00 15.3
209.75 15.1
0.50 14.5
185.50 14.4
183.25 14.3
37.20 14.2
37.15 14.1
13.9
13.8
166.50 13.7
274.75 13.6
5,613.00 13.5
3,947.00 13.4
2,812.00 13.3A
Class-C
2,812.00 13.3
16.5
16.6
16.7
16.8
16.9
16.10
16.11
16.12
16.13
16.14
16.15
16.16
16.17
16.18
16.19
16.20
16.21
16.22
16.23
16.24
16.26
16.25
Description of Work
16.3
16.4
16.2
16.1
Rate
No.
7,400.00
m3
3
m3
m2
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
(Air
Compressor+Jack
Hammer
Manual)
(B-Hoe ++ Manual)
-do-
- 22 -
343.25
12,546.00
13,754.00
-
-do-
m3
m3
m3
-do-
-do-
11,935.00
12,250.00
m3
m3
m
m3
-do-
10,196.00
9,972.00
Basic Unit
Rate(Rs.)
10,930.00
11,287.00
{Air
Compressor+Jack
Hammer+Concrete
Mixture +Vibrator+
-do-
Principal M/C
-do-
m3
m3
Unit
11,667.00
11,929.00
12,788.00
13,206.00
13,964.00
14,333.00
14,679.00
16,092.00
8,658.00
401.75
12,541.00
13,444.00
13,884.00
14,681.00
15,068.00
15,432.00
16,917.00
9,102.00
422.25
Class-B
12,265.00
Class-A
Machinery
318.50
2,752.00
460.75
489.00
508.50
569.50
581.00
586.00
593.50
647.00
651.50
685.00
718.00
169.50
6,879.00
4,403.00
13,566.00
14,774.00
3,302.00
12,955.00
13,270.00
11,950.00
12,307.00
11,216.00
10,992.00
Basic Unit
Rate(Rs.)
3,220.00
539.00
572.00
595.00
666.50
679.50
685.50
694.50
757.00
762.50
801.00
840.00
198.25
8,048.00
3,385.00
566.50
601.50
625.50
700.50
714.50
721.00
730.00
796.00
801.50
842.50
883.50
208.25
8,461.00
372.75
5,152.00
5,416.00
392.00
15,873.00
17,285.00
3,864.00
15,158.00
15,526.00
13,981.00
14,400.00
13,122.00
12,860.00
16,687.00
18,172.00
4,062.00
15,935.00
16,322.00
14,698.00
15,138.00
13,795.00
13,520.00
Class-B
Manual
Class-A
391.50
8,436.00
14,303.00
15,679.00
-
13,606.00
13,965.00
12,460.00
12,868.00
11,623.00
11,368.00
Class-C
16.24
16.23
16.22
16.21
16.20
16.19
16.18
16.17
16.16
16.15
16.14
16.13
16.12
16.11
16.26
363.25 16.25
3,137.00
525.00
557.50
579.50
649.50
662.50
668.00
676.50
737.50
742.50
780.50
818.50
193.00
7,842.00
5,020.00 16.10
15,466.00 16.7
16,842.00 16.8
3,765.00 16.9
14,769.00 16.5
15,128.00 16.6
13,623.00 16.3
14,030.00 16.4
12,786.00 16.2
12,531.00 16.1
Class-C
3" thick insitu lining in 1:3:6(1") ct. conc., excluding forms, lift 0-5
ft haul as in Rate Number 16.1.
9" thick pitching in 6"-9" rubble in 1:5 ct. mt., lift 0-5 ft, haul as in
Rate Number 16.1.
1/2" thick rough ct. plastering in 1:3 ct. mt., on rubble pitching
faces.
17.2
17.3
17.4
17.5
61,294.00
49,684.00
-do-do-do-do-do-do-do-
Each
Each
Each
Each
Each
Each
Each
18.7A As in Rate Number 18.1 but for bridge beam 17x 1.57 t.
18.7B As in Rate Number 18.1 but for bridge beam 14x 1.13 t.
18.7C As in Rate Number 18.1 but for bridge beam 11x 0.89 t.
As in Rate Number 18.8 but for upright for hand rails of 3'3"x1.09
cwt.
18.8
18.9
18.10
18.11
- 23 -
2,842.00
3,503.00
4,580.00
2,514.00
44,169.00
76,337.00
83,523.00
-do-
18.7
-do-
18.6
Each
97,722.00
89,315.00
71,714.00
58,130.00
51,678.00
2,942.00
5,359.00
4,099.00
3,325.00
102,734.00
93,895.00
75,391.00
61,111.00
54,328.00
3,093.00
5,633.00
4,309.00
3,496.00
120,488.00
126,667.00
102,981.00
Each
18.5
Each
136,667.00
143,676.00
-do-
161,646.00
169,935.00
116,810.00
-do-
138,159.00
-do-
18.4
Each
18.3
Each
176,739.00
185,803.00
1,961.00
2,062.00
151,059.00
-do-
Each
18.2
1,124.00
1,181.00
225,769.00
1,006.00
1,057.00
237,347.00
Furnish and install bridge beam 53'x 5.07 t, transport 200 miles,
installation crane travel 200 miles.
18.1
Class-B
Class-A
Machinery
192,965.00
1,676.00
(Air
Compressor+Jack
Hammer+ Manual)
m2
(B-Hoe+ Manual)
960.50
-do-
m2
m2
860.00
Basic Unit
Rate(Rs.)
(Air Compressor+
Jack Hammer+CM+
V+Manual)
Principal M/C
m2
m2
Unit
Each
2" thick lining in 1:8 ct. sand pre-cast slabs in 1:5 ct. mt. with 1/8"
float for internal surfaces, lift 0-5 ft, haul as in Rate Number 16.1.
Description of Work
17.1
Rate
No.
1,557.00
1,038.00
937.50
614.00
Basic Unit
Rate(Rs.)
3,240.00
3,994.00
5,221.00
2,866.00
50,353.00
56,639.00
69,875.00
87,025.00
95,217.00
117,398.00
133,163.00
157,501.00
172,207.00
219,980.00
1,911.00
1,095.00
980.50
Class-C
1,915.00
1,277.00
1,153.00
755.50
Class-A
1,822.00
1,215.00
1,097.00
718.50
Class-B
Manual
Rate
No.
18.11
18.10
18.9
18.8
18.7C
18.7B
18.7A
18.7
18.6
18.5
18.4
18.3
18.2
18.1
17.5
1,775.00 17.4
1,183.00 17.3
1,069.00 17.2
700.00 17.1
Class-C
As in Rate Number 18.8 but for rain water channel of 3" dia x
6"x24"x0.28 cwt.
18.13
18.14
As in Rate Number 21.1 but for 12" dia. size as in Type Plan No.
C501-2-6D.
As in Rate Number 21.1 but for 15" dia. size as in Type Plan No.
C501-2-6D.
As in Rate Number 21.1 but for 18" dia. size as in Type Plan No.
C501-2-6D.
As in Rate Number 21.1 but for 24" dia. size as in Type Plan No.
C501-2-6D.
As in Rate Number 21.1 but for 30" dia. size as in Type Plan No.
C501-2-6D.
21.2
21.3
21.4
21.5
21.6
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
22.4
22.5
22.6
22.7
22.8
22.9
22.10
5.00'x4.75'
4.25'x5.17/5.00'x4.50'.
4.25'x5.00'
4.00'x5.00'/4.25'x4.75'/4.50'x4.50'.
4.50'x4.00'
4.00'x4.00'
4.00'x3.75'
5.00'x2.75 '
22.2
22.3
22.1
Furnish & install in turnout 9" dia. cast iron gate & hoist complete
with spindle, handle etc. as per type plan No.C501-2-6D transport
200 mls.
21.1
As in Rate Number 18.8 but for hand rails of 3" dia x 7' 8 1/2"
x0.94 cwt.
Description of Work
18.12
Rate
No.
Each
Each
Each
Each
Each
Each
Each
- 24 -
Each
Each
Each
Each
Each
Each
765.50
2,818.00
Basic Unit
Rate(Rs.)
Each
Each
-do-
Each
Each
-do-
Principal M/C
Each
Unit
895.50
941.50
-
Class-B
3,297.00
Machinery
872.50
Class-C
3,212.00
5,272.00
4,942.00
4,777.00
4,612.00
3,855.00
3,360.00
3,195.00
2,700.00
2,370.00
2,040.00
128,537.00
78,929.00
57,203.00
48,600.00
29,342.00
26,290.00
11,663.00
Basic Unit
Rate(Rs.)
3,159.00
3,738.00
3,931.00
4,510.00
5,396.00
5,589.00
5,782.00
6,168.00
3,929.00
4,132.00
4,741.00
5,673.00
5,876.00
6,079.00
6,485.00
150,388.00
158,100.00
3,321.00
92,347.00
97,083.00
2,772.00
66,927.00
70,360.00
2,915.00
56,862.00
59,778.00
2,386.00
34,330.00
36,091.00
2,509.00
30,759.00
13,646.00
14,345.00
32,336.00
Class-B
-
Class-A
-
Manual
18.13
18.12
Rate
No.
6,010.00 22.10
5,634.00 22.9
5,446.00 22.8
5,258.00 22.7
4,394.00 22.6
3,830.00 22.5
3,642.00 22.4
3,078.00 22.3
2,701.00 22.2
2,325.00 22.1
146,532.00 21.6
89,979.00 21.5
65,211.00 21.4
55,404.00 21.3
33,450.00 21.2
29,970.00 21.1
13,296.00 18.14
Class-C
-
-do-
-do-
22.12
22.13
5.75'x5.50/5.58'x5.67'.
5.17'x5.58'
5.50'x4.50/5.25'x4.75'.
Description of Work
-do-
-do-
-do-
-do-
-do-
-do-
-do-
-do-
23.5
23.6
23.7
23.8
23.9
23.10
23.11
54" dia.
48" dia.
42" dia.
36" dia.
30" dia.
24" dia.
18" dia.
15" dia.
12" dia.
Earth excavation 0 - 5 ft
Gravel excavation 0 - 5 ft
24.1
24.2
24.3
24.4
24.5
24.6
24.7
24.8
24.9
24.10
24.11
-do-
23.4
23.2
23.3
Furnish, lay & joint 6"dia. RCC spun pipe including trenching and
back fill, haul pipes 150 mls lorry & 8 mls T-T, other materials as in
Rate Number 16.1.
23.1
-do-
22.11
Rate
No.
m
m
m
m
m
m
m
m
m
m3
3
m3
m3
3
- 25 -
m3
m
m3
Each
Each
Basic Unit
Rate(Rs.)
Principal M/C
Each
Unit
Class-B
-
Class-A
-
Machinery
Class-C
-
1,464.00
1,331.00
1,754.00
1,665.00
1,235.00
1,531.00
1,127.00
1,049.00
1,059.00
685.50
613.00
21,061.00
18,536.00
16,750.00
11,567.00
9,737.00
7,185.00
5,989.00
4,315.00
3,919.00
3,233.00
2,412.00
5,932.00
5,602.00
5,437.00
Basic Unit
Rate(Rs.)
1,319.00
1,791.00
1,445.00
1,948.00
2,052.00
1,557.00
1,713.00
1,883.00
1,519.00
2,048.00
2,158.00
1,637.00
1,801.00
24,641.00
25,905.00
1,386.00
21,687.00
22,799.00
1,228.00
19,598.00
20,603.00
1,239.00
13,533.00
14,227.00
1,291.00
11,392.00
11,976.00
1,303.00
8,406.00
8,837.00
802.00
7,007.00
7,366.00
843.00
5,049.00
5,308.00
717.50
4,586.00
4,821.00
754.00
3,783.00
3,977.00
6,941.00
7,296.00
2,822.00
6,554.00
6,891.00
2,967.00
Class-B
6,361.00
Class-A
6,688.00
Manual
Rate
No.
1,669.00 24.11
1,517.00 24.1
2,000.00 24.9
1,898.00 24.8
1,407.00 24.7
1,745.00 24.6
1,285.00 24.5
1,196.00 24.4
1,207.00 24.3
781.00 24.2
699.00 24.1
24,009.00 23.11
21,131.00 23.10
19,096.00 23.9
13,186.00 23.8
11,100.00 23.7
8,191.00 23.6
6,827.00 23.5
4,920.00 23.4
4,468.00 23.3
3,686.00 23.2
2,750.00 23.1
6,763.00 22.13
6,386.00 22.12
Class-C
6,198.00 22.11
24.13
24.14
24.15
24.16
24.17
24.18
24.19
24.20
24.21
24.22
24.23
24.24
25.1
25.2
Description of Work
24.12
Rate
No.
m3
3
m3
m3
3
m3
3
m3
-
m3
m2
- 26 -
m3
Basic Unit
Rate(Rs.)
Principal M/C
m3
Unit
Class-B
-
Machinery
Class-C
-
2.55
466.00
2,151.00
2,255.00
2,050.00
1,720.00
1,564.00
2,004.00
2,097.00
1,906.00
1,583.00
1,439.00
1,873.00
1,957.00
1,779.00
Basic Unit
Rate(Rs.)
2,191.00
1,684.00
1,852.00
2,231.00
2,454.00
2,344.00
1,830.00
2,013.00
2,399.00
2,639.00
2,517.00
2,304.00
1,770.00
1,947.00
2,345.00
2,580.00
2,465.00
1,924.00
2,116.00
2,522.00
2,774.00
2,646.00
3.15
3.00
545.00
2,290.00
2,408.00
573.00
Class-B
2,082.00
Class-A
2,189.00
Manual
Rate
No.
2.90 25.2
531.00 25.1
2,452.00 24.24
2,571.00 24.23
2,337.00 24.22
1,961.00 24.21
1,783.00 24.2
2,284.00 24.19
2,391.00 24.18
2,173.00 24.17
1,805.00 24.16
1,641.00 24.15
2,135.00 24.14
2,231.00 24.13
Class-C
2,029.00 24.12
34.3
150mm deep 115mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 2 Nos. 10 mm dia. Tor Steel Bars.
150mm deep 225mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 2 Nos. 12 mm dia. Tor Steel Bars.
150mm deep 225mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 3 Nos.12 mm dia.Tor Steel Bars.
225mm deep 225mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 3 Nos. 12 mm dia. Tor Steel Bars.
300mm deep 225mm wide lintol in 1:2:4 (20mm) ct.concrete reinforced with 4 Nos.12 mm dia.Tor Steel Bars.
75mm thick RCC Slab for hoods, Sunshades, Flat Roofs etc. in 1:2:4(20mm) ct. concrete rainforced with 10mm dia.
Tor Steel Bars at 225mm c/c both ways.
75mm thick 1:3:6 (40mm) ct. concrete in floors, ramps etc. finished with 16mm thick 1:3 ct. mortar smooth
rendering
(36) STONE MASON AND BRICKLAYOR
Random Rubble Masonry in 1:5 ct. mortar in super structure (average height 4.5m.)
Brick masonry in 1:5 ct. mortar in super structure (average height 4.5m).
115mm thick brick masonry in 1:5 ct. mortar in super structure (average height 4.5m).
115mm thick Honeycomb brick work in 1:5 ct. mortar in superstructure (average height 4.5m)
75mm thick pre-cast grille in 1:3 ct. mortar in superstructure (average height 4.5m).
75mm thick brick paved floor/ramp in 1:5 ct. mortar, finished with 16mm thick 1:3 ct. mortar smooth rendering.
35.1A
35.2
35.3
35.3A
35.4
35.5
35.6
35.7
36.1
36.2
36.3
36.4
36.5
36.6
36.6A
36.7
36.8
- 27 -
35.1
(35) CONCRETER
(34) EXCAVATOR
Description of Work
34.1
34.2
Rate
No.
BUILDING WORKS
582.50
205.75
3,694.00
1,403.00
6,879.00
7,339.00
8,717.00
9,177.00
1,133.00
785.50
1,012.00
985.00
1,209.00
3
3
3
3
2
2
2
2
2
2,859.00
2,240.00
1,766.00
1,621.00
1,123.00
15,253.00
m
m
11,950.00
685.50
Basic Unit
Rate(Rs.)
m3
Unit
1,644.00
1,339.00
1,376.00
1,068.00
1,540.00
12,480.00
11,855.00
9,981.00
9,355.00
1,908.00
5,023.00
3,888.00
3,046.00
2,401.00
2,204.00
1,527.00
20,744.00
16,252.00
279.75
792.00
932.00
Class-A
1,427.00
1,162.00
1,194.00
927.00
1,337.00
10,829.00
10,286.00
8,661.00
8,117.00
1,656.00
4,359.00
3,374.00
2,644.00
2,084.00
1,913.00
1,325.00
17,998.00
14,101.00
242.75
687.50
808.50
Cl-B & C
36.8
36.7
36.6A
36.6
36.5
36.4
36.3
36.2
36.1
35.7
35.60
35.5
35.4
35.3A
35.3
35.2
35.1A
35.1
34.3
34.2
34.1
Rate
No.
150mm - 225mm wide copying on brick walls with 1:2 ct. mortar, finished smooth.
37.14
37.15
37.16
- 28 -
37.13
do
37.8
do
37.7
37.12
do
37.8A
20mm thick Damp Proof Course in 1:2 ct. mortar, finished rough with two coats of Hot tar blinded with sand.
do
37.7A
37.11
do
37.6
Cement & lime mortar plastering with 16mm thick, 1:1:5 mix, finished smooth.
do
37.5
37.10
do
37.4
Cement & lime mortar plastering with 16mm thick, 1:1:5 mix, finished rough.
do
37.3
37.9
do
Cement mortar plastering with 12mm thick, 1:3 mix, finished rough.
37.2
37.1
300mm T x 150mm R double step in brick masonry in 1:5 ct. mortar, finished with 16mm thick, 1:3 ct. mortar
smooth rendering.
36.11
300mm T x 150mm R single step in brick masonry in 1:5 ct. mortar, finished with 16mm thick, 1:3 ct. mortar
smooth rendering.
36.10
383.25
493.00
407.50
517.50
423.50
533.00
456.50
566.00
449.00
612.00
564.50
m2
2
m2
2
2
2
2
2
2
m2
2
2,995.00
2,177.00
2
2
m
m
200.50
2,792.00
m
66.90
453.00
343.25
2,171.00
902.00
1,331.00
Basic Unit
Rate(Rs.)
Unit
150mm av. deep, 225mm wide drain in brick masonry in 1:5 ct. mortar, with 115mm thick side walls & invert,
finished with 16mm thick 1:3 ct. mortar smooth rendering.
Description of Work
36.9
Rate
No.
BUILDING WORKS
272.50
2,960.00
4,073.00
3,797.00
90.95
767.50
832.00
610.50
769.50
620.50
724.50
575.50
703.50
554.00
670.00
521.00
616.00
466.75
2,952.00
1,226.00
Class-A
1,810.00
236.75
2,568.00
3,534.00
3,295.00
78.90
666.00
722.50
530.00
668.00
538.50
629.50
499.75
610.50
481.00
581.50
452.00
534.50
405.25
2,562.00
1,064.00
Cl-B & C
1,570.00
37.16
37.15
37.14
37.13
37.12
37.11
37.10
37.9
37.8
37.7
37.8A
37.7A
37.6
37.5
37.4
37.3
37.2
37.1
36.11
36.10
36.90
Rate
No.
PVC Toilet Door in 804x2060mm size with PVC door frame inclunding 2 Nos. butt hinges, 2 Nos. Barrel Bolts and
quality lock with keys in duplicate, all complete to working order.
Door in 100x75mm frame with a fully glazed fanlight on top (thickness of glass to be 3mm) with center pivot
arrangement & locking device, ordinary plywood sash, Brass fittings including 3 Nos. Butt hinges, 2 Nos. Barrel
Bolts & quality mortice lock with keys in duplicate, all complete to working order.
As in Rate No. 38.3 but with marine (water proof ) plywood sash.
Door in 100x75mm frame without slats or fanlight and with ordinary plywood sash, brass fittings including 3 Nos.
butt hinges, 2 Nos. Barrel Bolts and quality mortice lock with keys in duplicate, all complete to working order.
As in Rate No. 38.5 but with marine (water proof) plywood sash.
Door in 100x75mm frame, without slats or fanlight and with 25mm thick ledged, braced & battened sash, brass
fittings incl. 3 Nos. Butt Hinges, 2 Nos. Barrel Bolts and quality mortice lock with keys in duplicate (A 150mm
hasp & staple and 50mm Viro padlock with keys may be provided in place of mortice lock where applicable), all
complete to working order.
Garage door in 100x50mm frame, panalled sash comprising 30mm thick rails & styles and 12mm thick panels,
brass fittings including 12 Nos. Butt hinges, 6 Nos. Barrel Bolts (for a 10'x8' door) 1 No.150mm hasp & staple and 1
No.50mm Quality Padlock with keys all complete to working order.
Window in 100x75mm frame with 75x25mm slats, 25mm thick sash comprising 3 mm thick glass, brass fittings
including 2 Nos. butt hinges, 2 Nos. Barrel Bolts, 1 No. Casement stay and 1 No. Casement Fastener for each sash
all complete to working order.
Window in 100x75mm frame with glazed fanlight on top comprising centre pivot arrangement and locking device,
25mm thick sash comprising 3mm thick glass, brass fittings including 2 Nos. butt hinges, 2 Nos. Barrel Bolts, 1 No.
casement stay and 1 No. casement fastener for each sash all complete to working order.
Window in 100x75mm frame without slats/fan light, with 25mm thick sash comprising 3mm thick glass, brass
fittings including 2 Nos. Butt hinges, 2 Nos. Barrel Bolts, all complete to working order.
38.2
38.3
38.4
38.5
38.6
38.7
38.8
38.9
38.10
38.11
- 29 -
Door in 100x75mm frame with 75x25mm slats, ordinary plywood sash, brass fittings incl. 3 Nos. butt hinges, 2
Nos. Barrel Bolts and quality mortice lock with keys in duplicate, all complete to working order.
Description of Work
38.1
Rate
No.
BUILDING WORKS
8,567.00
9,879.00
11,422.00
9,859.00
11,622.00
13,197.00
6,610.00
10,919.00
10,836.00
10,641.00
m2
m2
2
2
m2
10,067.00
Basic Unit
Rate(Rs.)
Unit
14,471.00
14,736.00
14,849.00
8,989.00
17,947.00
15,805.00
13,408.00
15,533.00
13,435.00
11,651.00
13,691.00
Class-A
12,556.00
12,786.00
12,884.00
7,800.00
15,573.00
13,714.00
11,634.00
13,478.00
11,658.00
10,109.00
11,879.00
Cl-B & C
38.11
38.10
38.9
38.8
38.7
38.6
38.5
38.4
38.3
38.2
38.10
Rate
No.
38.12
Rate
No.
- 30 -
Window in 100x75mm frame without slats/fanlight, with 25mm thick ledged, braced & battened sash, brass
fittings including 2 Nos. butt/parlimentary hinges, 2 Nos. Barrel Bolts, 1 No. Casement stay & 1 No. Casement
fastener for each sash, all complete to working order.
Description of Work
BUILDING WORKS
Unit
12,365.00
Basic Unit
Rate(Rs.)
Class-A
16,816.00
Cl-B & C
14,590.00
38.12
Rate
No.
Trellis work in 900x900mm frame work of 100x50mm timber, with 44mm battens fixed to framework at 75mm c/c
bothway.
50x50mm Galvanized iron welded mesh fixed to 900x900mm frame work of 100x50mm timber, by means of
38x12mm beadings.
38.14
38.15
2,995.00
Half round single tile covering on Corrugated Asbestos Roof (Asbestos roof paid separately).
20mm Thick Lunumidella plank ceiling fixed to roof rafters, including application of wood preservative in 2 coats.
20mmThick flat Lunumidella ceiling, fixed to sawn timber frame work, including application of wood
preservative in 2 coats.
Flat Asbestos ceiling, fixed to sawn timber frame work, including application of wood preservative in 2 coats.
Asbestos ceiling fixed to roof rafters, including application of wood preservative in 2 coats.
200x 25mm valance & barge boards fixed to roof rafters with brass screws including application of wood
presavative in 2 coats.
As in Rate No. 39.7, but for 250x25mm valance & barge board.
Valley gutter in Aluminium sheet, fixed to 25mm thick planks treated with 2 coats of wood preservative.
150mm half round or 115mm square PVC eaves gutter fixed to valance board with aluminium brackets & brass
screws.
90mm dia. PVC down pipes inclusive of bends, joiners etc. fixed to wall with embedded plugs & PVC straps and
with proper connection to eaves gutters.
39.2A
39.3
39.4
39.5
39.6
39.6A
39.7
39.7A
39.8
39.9
39.10
- 31 -
Corrugated Asbestos Roof on sawn timber frame treated with 2 coats of wood preservative, including ridge
plates, wall plates, purlins, beams, struts, rafters fixed at an interval of 4 ft and reepers etc.
Corrugated Asbestos ridging.
39.2
1,165.00
1,996.00
1,818.00
992.50
2
2
m2
m
m
596.50
485.75
9,443.00
1,128.00
830.00
1,064.00
m
708.00
2,199.00
508.00
Calicat Pattern Ridge Tiles bedded in cement lime mortar 1:1:5 mix.
39.1A
Calicut Tile roof on sawn timber frame, treated with 2 coats of wood preservative, including ridge plates, wall
plates, purlins, beams, struts, rafters fixed at an interval of 600mm, reepers etc.
m
2,981.00
5,783.00
m2
13,359.00
Basic Unit
Rate(Rs.)
Unit
39.1
(39) ROOFER
Isolated Fanlight in 100x75mm frame with 32mm thick sash comprising 3mm thick glass, brass fittings including 2
Nos. Center pivots & 2 Nos. fanlight catches, all complete to working order.
Description of Work
38.13
Rate
No.
BUILDING WORKS
811.00
660.50
12,842.00
1,534.00
1,128.00
1,349.00
2,472.00
2,714.00
1,584.00
1,447.00
962.50
2,990.00
690.50
4,054.00
4,073.00
7,864.00
Class-A
18,168.00
704.00
573.00
11,143.00
1,332.00
979.50
1,171.00
2,145.00
2,355.00
1,374.00
1,256.00
835.00
2,595.00
599.50
3,518.00
3,534.00
6,824.00
Cl-B & C
15,764.00
39.10
39.9
39.8
39.7A
39.7
39.6A
39.6
39.5
39.4
39.3
39.2A
39.2
39.1A
39.1
38.15
38.14
38.13
Rate
No.
Furnishing & fixing PVC Gutter Head Box for eaves gutter.
39.12
Application of two coats of Weathersheild of approved tint & quality including preparation of surface.
Application of two coats of grey cement wash to plinth in two coats including preparation of surface.
Application of two coats of Emulsion Paint of approved tint & quality including preparation of surface.
Application of two coats of Enamal Paint of approved tint & quality including preparation of surface.
Application of two coats of Aluminium paint of approved quality including preparation of surface
40.2
40.3
40.4
40.5
40.6
40.7
40.8
189.50
45.05
163.75
218.75
227.00
198.00
2
2
2
2
2
each
Furnishing & installing ceramic low leval suit complete with ceramic cistern, lid, control valve, syphon, plastic
seat & cover, trap, syphon lever etc. with necessary connections to sewage & water supply systems.
Furnishing & installing ceramic squatting pan (standerd size) complete with cast iron cistern, lid, control valve,
syphon, trap, down pipe, foot rests, syphon lever & chain etc. with necessary connections to sewage & water
supply system.
41.3
41.4
- 32 -
each
Furnishing, laying & jointing 110mm dia. PVC pipes including trenching & backfill with necessary bends etc.
6,417.00
16,930.00
1,146.00
144.50
2
68.15
2
1,188.00
605.00
Basic Unit
Rate(Rs.)
each
each
Unit
41.2
(41) PLUMBER
40.1
Louvers with slats = 3.00 and Windoor with glazed sash = 1.25.
Door with fanlight & plywood sash = 2.15, Trellis work with frame = 2.50, Window with slats & glazed sash =
2.40, G.I. wire mesh with frame = 1.50, Window with fanlight & glazed sash = 2.10,
NOTE: Multiply door/ window areas (opening in wall) by the painting coefficients given below to obtain painting
areas for which following unit rates are applicable. The coefficients include the painting of both sides of door/
window.
(40) DECORATOR
Description of Work
39.11
Rate
No.
BUILDING WORKS
8,727.00
23,024.00
7,572.00
19,977.00
1,352.00
1,558.00
233.75
268.00
258.25
193.25
53.15
223.50
170.50
80.40
1,402.00
Cl-B & C
713.50
269.25
308.50
297.50
222.50
61.25
257.50
196.50
92.65
1,615.00
Class-A
822.50
41.4
41.3
41.2
40.8
40.7
40.6
40.5
40.4
40.3
40.2
40.1
39.12
39.11
Rate
No.
m
m
Furnishing & installing 20mm dia. PVC pipe line for internal water service including all necessary bends, sockets,
tees etc.
As in Rate No. 41.7, but for 25mm dia. PVC pipe line.
As in Rate No. 41.7, but for 32mm dia. PVC pipe line.
As in Rate No. 41.7, but for 40mm dia. PVC pipe line.
As in Rate No. 41.7, but for 50mm dia. PVC pipe line.
Furnishing & installing 20mm PVC shower rose and 1/2" brass control valve with necessary valve & Faucet
sockets
etc. & installing 20mm brass bibcock with necessary Faucet sockets.
Furnishing
Furnishing & installing 25mm brass stop valve with necessary sockets.
Furnishing & installing 32mm brass stop valve with necessary sockets.
Furnishing & installing 40mm brass gate valve with necessary sockets.
Furnishing & installing 50mm brass gate valve with necessary sockets.
Furnishing & installing 20mm brass stop valve with necessary sockets.
Furnishing & installing 200x100mm half round ceramic Tooth Brush Holder.
Furnishing & installing Chromium plated Towel Rail with ceramic Brackets.
Furnishing & installing 500x400mm (Rectangular or oval shape) Bathroom Mirror with 5mm thick 400x380mm
plate glass shelf fixed to wall with Tray Holders.
41.7
41.8
41.9
41.10
41.11
41.12
41.14
41.15
41.16
41.17
41.18
41.19
41.20
41.21
41.22
41.23
41.24
- 33 -
each
Furnishing & installing 550x380mm ceramic wash basin waste water pipe & with necessary connection to water
supply system.
41.6
41.13
each
Furnishinig & installing 1000x500mm s/s kitchen sink complete with strainer, flushing plug, PVC waste water
pipe etc
41.5
each
each
each
each
each
each
each
each
each
each
2,232.00
1,770.00
957.50
676.00
4,036.00
1,469.00
934.00
4,827.00
3,606.00
1,781.00
1,230.00
796.50
each
each
757.00
822.50
560.00
470.25
194.75
81.75
4,947.00
4,603.00
3,730.00
Basic Unit
Rate(Rs.)
each
each
Unit
Furnishing & installing ceramic squatting pan with trap, foot rests & necessary connection to sewage system,
excluding cistern.
Description of Work
41.4A
Rate
No.
BUILDING WORKS
3,035.00
2,407.00
1,302.00
919.00
5,488.00
1,997.00
1,270.00
6,564.00
4,904.00
2,422.00
1,672.00
1,083.00
1,029.00
1,118.00
761.50
639.50
264.75
111.00
6,727.00
6,260.00
Class-A
5,072.00
2,633.00
2,088.00
1,129.00
797.50
4,763.00
1,733.00
1,102.00
5,696.00
4,255.00
2,102.00
1,451.00
939.50
893.50
970.50
661.00
554.50
229.75
96.45
5,837.00
5,431.00
Cl-B & C
4,401.00
41.24
41.23
41.22
41.21
41.20
41.19
41.18
41.17
41.16
41.15
41.14
41.13
41.12
41.11
41.10
41.9
41.8
41.7
41.6
41.5
41.4A
Rate
No.
Providing Waste water Catch pit with 150x150mm PVC Grating and PVC Lead-away pipe.
Providing Segmental open channel (75mm wide) on concrete or brick paved floor.
Providing 100mm dia. PVC Gulley with "P" or "S" trap and 150x150mm PVC Grating.
Furnishing and installing 50mm dia. PVC Vent pipe, fixed to wall with brackets.
As in Rate No. 41.30 but for 100mm dia. PVC Vent pipe.
Furnishing and installing 50mm dia. PVC Vent pipe, fixed to wall with brackets.
Furnishing and installing 100mm dia. (Type 400) PVC Vent pipe, fixed to wall with brackets.
Construction of 750x750x900mm Man Hole (internal dimensions) in Brick work with 2" thick RCC cover slab.
41.26
41.27
41.28
41.29
41.30
41.31
41.32
41.33
41.34
41.35
each
each
each
each
Providing 5 A. Switched Socket outlet with concealed/semi-concealed Wiring, connections to the main circuit &
Earth leakage system, complete in all respect.
Providing concealed/semi-concealed type Wiring with connections to the main circuit, for Ceiling Fan &
Regulator, including suspension hook, round blocks, switch etc. (Supplying and fixing of Ceiling Fan & Regulator
not included).
Providing 1m long Earth electrode (Copper) with necessary Wiring and Connection to Earth Leakage Circuit
Breaker.
Supplying & installing single phase 2 way D-Panel with necessary connections to main & branch circuits.
42.3
42.4
42.5
42.6A
42.6B
42.6C
- 34 -
each
42.2
each
each
each
Providing Batten Lamp with concealed/semi-concealed Wiring, connections to main circuit, Switch, Holder,
Shade & Bulb and complete in all respect.
each
each
each
each
each
each
Unit
42.1
(42) ELECTRICIAN
Description of Work
41.25
Rate
No.
BUILDING WORKS
2,797.00
2,246.00
1,788.00
3,233.00
3,668.00
4,658.00
3,509.00
3,368.00
12,474.00
353.75
1,087.00
791.00
1,072.00
628.00
2,148.00
163.75
1,197.00
1,832.00
1,770.00
Basic Unit
Rate(Rs.)
3,803.00
3,054.00
2,431.00
4,396.00
4,988.00
6,334.00
4,772.00
4,580.00
16,964.00
481.00
1,478.00
1,075.00
1,457.00
854.00
2,921.00
222.50
1,627.00
2,491.00
Class-A
2,407.00
3,301.00
2,650.00
2,110.00
3,814.00
4,328.00
5,497.00
4,141.00
3,974.00
14,719.00
417.25
1,283.00
933.50
1,265.00
741.50
2,534.00
193.50
1,413.00
2,162.00
Cl-B & C
2,088.00
42.6C
42.6B
42.6A
42.5
42.4
42.3
42.2
42.1
41.35
41.34
41.33
41.32
41.31
41.30
41.29
41.28
41.27
41.26
41.25
Rate
No.
each
each
each
each
Supplying & installing 40 A Single phase Isolator with necessary connections to main circuit
Supplying & installing 40 A. Single Phase Earth Leakage Circuit Breaker with necessary connections to main
circuit & Earth Electrode etc.
Furnishing 7/044 Electric Cables, 75mm dia. G.I. pipe for intermediate post, G.I brackets with insulators & other
necessary materials and providing Service connection from main supply.
Providing Bracket Lamp with concealed or semi concealed type Wiring, connection to the main circuit, switch,
holder, shade, Bulb etc. and complete in all respect.
As in Rate No. 42.10 but for Ceiling Lamp with round or square type Plastic cover.
As in Rate No. 42.10 but for 20 W, 2 ft long Daylight type Fluorescent lamp.
As in Rate No. 42.10 but for 40 W, 4 ft long Daylight type Fluoerescent lamp.
Providing 15 A Switched Socket Outlet with conealed or semi-concealed type wiring (using 7/036 cables) and
connections to main circuit & Earth Leakage system complete in all respect.
Supplying and installing 56" Sweep Ceiling Fan & Regulator (excluding wiring).
Furnishing and installing Electric Bell & Bell Push, with necessary wiring (concealed or semi-concealed type) and
connection to main circuit.
Furnishing and installing Street Lamp complete with 125 W Mercury Vapour Bulb, Lamp Ballast, 40/0076
connecting cables and 20mm dia. G.I. pipe fixed to lamp post with G.I. brackets
Providing 13 A Square pin Socket Outlet with conealed or semi-concealed type wiring (using 7/029 cables) and
connections to main circuit & Earth Leakage system complete in all respect.
42.7A
42.7B
42.8A
42.8B
42.9
42.10
42.11
42.12
42.13
42.14
42.15
42.16
42.17
42.18
References:
each
42.6F
- 35 -
1. Data for Costing - 1980 : Rates sub Committee appointed by Secretary , Ministry of Mahaweli Development.
2. Unit Rates for Construction Works- Augest 2001 : Ministry of Mahaweli Development.
each
each
each
each
each
each
each
each
each
each
42.6E
each
Unit
Description of Work
42.6D
Rate
No.
BUILDING WORKS
7,559.00
2,853.00
4,140.00
5,838.00
8,751.00
4,705.00
4,123.00
3,775.00
3,484.00
479.75
3,926.00
3,725.00
1,789.00
1,939.00
4,556.00
4,099.00
3,161.00
Basic Unit
Rate(Rs.)
10,280.00
3,880.00
5,630.00
7,939.00
11,901.00
6,398.00
5,607.00
5,134.00
4,738.00
652.00
5,339.00
5,066.00
2,433.00
2,637.00
6,196.00
5,574.00
Class-A
4,298.00
8,920.00
3,366.00
4,885.00
6,889.00
10,326.00
5,552.00
4,865.00
4,455.00
4,111.00
566.00
4,633.00
4,396.00
2,111.00
2,289.00
5,376.00
4,836.00
Cl-B & C
3,730.00
42.18
42.17
42.16
42.15
42.14
42.13
42.12
42.11
42.10
42.9
42.8B
42.8A
42.7B
42.7A
42.6F
42.6E
42.6D
Rate
No.
Supply and fix Ceramic Sink, 24"x15"x7" complete with mono type, chromium plated long neck
type sink tap - (Momali, Huai or equivalent) - including all necessary fittings.
Supply and fix Angle valve (Momali, Huai or equivalent)
Supply and fix Chromium plated flexible cable (Momali, Huai or equivalent), length 12" or 18".
44
Supply and install 65x65x6 mm angle iron, service bracket, D bracket and Insulator with
necessary nuts and bolts for main wire fixed to wall or roof frame including two coats of
anticorrosive paint and enamel paint- Single Phase
Supply and fix Aluminum window Fixed type, beading stick with silicon gum Brown/Silver
Aluminum members complete to the accepted Engineering standards
Supply and fix Aluminium window Fixed type, beading stick with silicon gum Powder coated
Aluminum members complete to the accepted Engineering standards
Supply and fix Aluminum Casement window with 5mm float glass, rubber beading stick with
silicon gum Brown/Silver Aluminum members complete to the accepted Engineering standards
48
- 35 -
Supply and fix Aluminum Door with 5mm float glass on top and PVC coated 5mm plywood
board at bottom, rubber beading stick with silicon gum Brown/Silver Aluminum members with
lock, stainless steel hingers, stainless steel door handle, door closer and all accessories.
Supply and fix Aluminum Door with 5mm float glass on top and PVC coated 5mm plywood
board at bottom, rubber beading stick with silicon gum Powder coated Aluminum members with
lock, stainless steel hingers, stainless steel door handle, door closer and all accessories.
53
54
Supply and fix Aluminum Casement window with 5mm float glass, rubber beading stick with
silicon gum Powder coated Aluminum members complete to the accepted Engineering standards
52
51
50
49
Manhole with internal dimension 450x450x600mm deep, 150mm thick 1:3:6(40mm) concrete
foundation, 225mm thick brick work in 1:5 ct. sand, 12mm thick cement sand rendering in 1:2 with
forming cannels and 75mm thick R.C.C. slab as per Drawings
47
45
46
Supply and fix Iron grill with 20x6 mm flat iron outer frame and horizontal bracings at 300 mm
intervals complete with 12x6 mm flat iron verticals at 75 mm c/c as instructed including two coats
of anticorrosive paint and enamel paint.
Description of Work
43
Rate
No.
m2
m2
m2
m2
m2
m2
No.
15,584.17
11,342.50
12,822.50
9,620.83
6,214.17
6,510.00
2,936.67
7,833.33
21,194.00
15,425.00
17,438.00
13,084.00
8,451.00
8,853.00
3,993.00
10,653.00
1,026.00
755.00
No.
No.
9,941.00
1,717.00
6,950.00
Class-A
18,389.00
13,384.00
15,130.00
11,352.00
7,332.00
7,681.00
3,465.00
9,243.00
890.50
8,625.00
1,489.00
6,030.00
Cl-B & C
7,310.00
1,262.50
5,110.83
Basic Unit
Rate(Rs.)
No.
No.
m2
Unit
54
53
52
51
50
49
48
47
45
46
44
43
Rate No.
Supply and fix 2.1m height Aluminum Partition using 76x23mm sections with 5mm float glass on
top and PVC coated 5mm plywood board at bottom, rubber beading stick with silicon gum
Brown/Silver Aluminum members complete to the accepted Engineering standards
56
57
- 36 -
Supply and fix Aluminum Partition using 76x23mm sections with 5mm float glass rubber beading
stick with silicon gum Powder coated Aluminum members complete to the accepted Engineering
standards
References: Unit Rates of Provisional Engineering Department - North Central Province
Supply and fix Aluminum Door with 5mm float glass on top and 0.47 mm Zn-Al covered plywood
board at bottom, rubber beading stick with silicon gum Powder coated Aluminum members with
lock, stainless steel hingers, stainless steel door handle, door closer and all accessories.
Description of Work
55
Rate
No.
m2
m2
m2
Unit
7,397.50
4,537.50
17,359.17
Basic Unit
Rate(Rs.)
10,060.00
6,171.00
23,608.00
Class-A
8,729.00
5,354.00
20,483.00
Cl-B & C
57
56
55
Rate No.