Regarding steel lining 207 gen rd g175, -171126co l2,
> & Penstock for early generation. Reference
> to drawing Nr 203-GEN-RD-D-119 , ER would like to ask the > Plant contractor > prepare as soon document following below > > 1. > Method statement installation steel lining >& > Penstock and trash rack, Gates > > 2. > Issue first embedded plate for steel lining >& > Penstock for early generation according drawing > 203-GEN-RD-D-119 and > 203-GEN-RD-D-119.01 > > 3. > Start to fabricate first embedded plate for > installation > > 4. > Regarding to transport and installation need > to make > all necessaries structure for this job like transport beam, > lifting beam, overturning > equipment structure, platform for installation and > welding