BOM Change Manual
BOM Change Manual
BOM Change Manual
Process Change
Parts may be not put in BOM or not deleted from BOM as required etc.
Once the above conditions are satisfied the BOM can be taken up for Change in the system by
following the steps as mentioned below:
1 OF 12
Step 1 :
Change No Creation
Create Change No
Step 2 :
Step 3 :
Step 4 :
2 OF 12
After Entering the Transaction following Screen opens, Fill the relevant details as shown in the
picture & then Press Enter again
3 OF 12
Pressing enter will take you to the next screen where in details like
Change no description
Validity of Change No.
& Reason for assigning the change is to be put
4 OF 12
After putting all the relevant details, press Enter , following screen will get displayed, click the
selections as shown in the picture & press enter twice to activate the Object filed in the screen
(encircled)
5 OF 12
The Object field/Tab in the above picture gets highlighted (becomes active).
Click on the object field to enter a new screen & there click on the MAT BOM tabs as shown in the
picture
6 OF 12
After filling all the details press enter, The Material description will get displayed in the next
columns, check the Nos. once again & description to make sure right Part Nos. have been put.
Press Save Button on toolbar to save the Details
Confirmation of the Change no. Creation will appear in the lower left corner of the main Screen of
Change no. Creation.
the Change No. is now ready to be used to Change material BOMs of Nos. assigned in the
window shown above
7 OF 12
After entering the Change BOM initial display screen fill in the information as mentioned in the
picture below:
Once in the main BOM window, press F6 function key, to goto the BOM header. In this page make
the click on Long Text Tab & put Status as 2 (inactive, i.e BOM will no longer be available for any
further processing except BOM change)
Press Item Tab to go to main BOM screen & ADD/DEL parts nos. as per authorized document.
SAP BOM CHANGE MANUAL
8 OF 12
9 OF 12
After BOM changes are complete save the BOM & come out of the main menu.
10 OF 12
11 OF 12
The detailed comparison sheet will come Press identical comp button & compare the left out
differences with ADD/DEL list, if ok proceed to make the BOM active otherwise follow STE-2 to
correct the same.
To make the BOM active come out of the comparison screen
Again go to BOM change Screen & fill in the details as suggested earlier
GOTO BOM header data & change the BOM Status to 1 to make it active & SAVE the same
The BOM is now active & ready for further processing
Intimate the concerned depts. About the change.
12 OF 12