HOUSING

ASSIGNMENT -1

BY-:
M.RAJA KATHIRAVAN
B.ARCH( 7TH SEM)
SHARDA UNIVERSITY

PROJECT NAMES- Silicon City

BUILDER- Amrapali
Sector-76, Noida, Uttarpradesh, INDIA.
39 BLOCKS , 19 FLOORS
Started in MARCH, 2013
STATUS- UNDER CONSTRUCTION

SITE PLAN

3BHK UNIT PLAN

Amenities in Amrapali Silicon City


Garden
Swimming Pool
Play Area
Health Facilities
24Hr Backup
Security
Intercom
Club House
Rain Water Harvesting
Wi-Fi
Cafeteria

Broadband
Internet
Tennis Court
Badminton Court
Gymnasium
Indoor Games
Basket Ball Court
Community Hall
Electricity backup

DATA
Built-up area -1096 square feet
Carpet area - 959 square feet
Inauguration Rate (5600 per sq.ft)
1096- 61,37,600
959- 53,70,400
Difference- 7,67,200
Increase in 100 (0.9824% )
Normal Rate (5700 per sq.ft)
1096- 62,47,200
959- 54,66,300
difference- 7,80,900 (12.5%)

SPECIFICATION:-

Living/Dinning Room
Floors
Vitrified Tiles
Walls
Plastic Paint & one wall with texture paint
Internal Doors
Hard wood frame with skin moulded door shutter
Ceiling
Designer POP
MASTER BEDROOM
Floors
Wooden Laminated

Walls
Internal Doors
Ceiling

Oil Bond Distemper Paint (OBD)


Hard wood frame with flush door/Skin door
Designer POP

TOILETS (Master Bedroom)


Anti Skid ceramic Tiles
Floors
Jaguar or equivalent (Fitting) Granite Counter &
Fixture & Fitting
Hindware or equivalent
Walls
Designer Ceramic Tiles with border up to 7'-0
Internal Doors
Hard wood frame with Flush door shutter
Ceiling
Designer POP Cornices
KITCHEN
Anti Skid Vitrified Tiles
Floors
Modular Woodwork, Jaguar & equivalent (Fitting),
Fixture & Fitting
Counter in Granite Stone, R.O.system.
Designer Ceramic Tiles with border up to 2'-0"
Walls
above Counter
Drainage
Sink with Drain loader
LIFT LOBBIES / CORRIDORS
Combination of different colour of Marble Stone
Floors
Granite Tiles cladding up to 3'-0" Feet & Texture
Walls
Paint above
Ceiling
Designer POP Cornices
External
Permanent Finish

1100
1050
1000

#REF!
AREA

950
900
850
BUILD UP AREA

CARPET AREA

5700
5680
5660
5640

#REF!

5620

COST

5600
5580
5560
5540
Inauguration

NORMAL

6400000
6200000
6000000
5800000
INAGURATION COST

5600000

NORMAL COST

5400000
5200000
5000000
4800000
BUILD-UP AREA

CARPET AREA

DIFFERENCE BETWEEN THE COST IN THE BUILD UP AREA = 1,09,600


DIFFERENCE BETWEEN THE COST IN THE BUILD UP AREA= 95,900