Drilling and Grouting Works

Toker Dam Project


Owner:

State of Eritrea

Main Contractor:

Keangnam Enterprises Ltd., Seoul/South Korea

Construction Period:

May 1997 to February 1999

Scope of Contract:

Rotary percussion:
Consolidation grouting:
Curtain grouting:
Core drilling:
Foundation drainage holes:
Dam drain holes:
Grouting:
approx.

2,562 m
4,683 m
2,556 m
1,520 m
1,450 m

The Toker Dam Project


The dam is located in the highlands of Eritrea/Africa,
approx. 20 km north east from Asmara, the capital of
Eritrea, in the stream of two seasonal rivers, Toker
River and Menkai River.
Due to two rainy seasons per year the water level of
these rivers varies a lot. In order to have a balanced
water supply for the capital, the construction of the
Toker River Water Supply was decided.
Via pipeline the reservoir is to be connected with a
existing water treatment plant.
To ensure the dam against underflow, a grouting
curtain has to be performed.
Basic Datas:
Total Height:
74 m
Spillway Height:
64 m
Total Width:
264 m
Maximum Offset:
52 m
Capacity:
15 Mio m
Details of Construction: RCC
Spillway for overflow
Stilling basin
Depth of grouting curtain: max. depth = 45 m below
foundation.

BAUER Spezialtiefbau GmbH D-86529 Schrobenhausen Tel. (0 82 52) 97-0 Fax (08252) 97-14 93

TV00023/GBA 09/98