Professional Documents
Culture Documents
Mechanical Install
Mechanical Install
Mechanical Install
Mechanical Installation
1.
2.
This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed
in conjunction with the manufacturers instructions, standard
industrial practices, and relevant codes and standards.
1.2.
1.3.
2.2.
2.1.2.
2.1.3.
2.1.4.
2.1.5.
2.1.6.
2.1.7.
Standards
2.2.1.
2.2.2.
2.2.3.
2.2.4.
2.2.5.
2.2.6.
Page -2-
Mechanical Installation
3.
2.2.7.
2.2.8.
2.2.9.
GENERAL REQUIREMENTS
3.1.
3.2.
3.3.
3.4.
3.5.
3.6.
3.7.
3.8.
Page -3-
Mechanical Installation
3.9.
4.
INSTALLATION REQUIREMENTS
4.1.
4.2.
4.3.
4.4.
4.5.
4.6.
4.7.
Page -4-
Mechanical Installation
4.8.
4.9.
4.10.2.
4.10.3.
Contractor's name
4.10.4.
4.10.5.
4.13.2.
4.13.3.
Page -5-
Mechanical Installation
4.13.4.
4.13.5.
5.
4.14.1.
4.14.2.
4.14.3.
4.14.4.
4.14.5.
Page -6-
Mechanical Installation
5.2.
5.3.
5.1.2.
5.1.3.
5.1.4.
Check that all moving parts have safety guards and if not,
Contractor shall provide acceptable field guards.
5.1.5.
5.1.6.
The above shall include all checks and tests which can
be performed without energizing systems.
5.2.2.
5.3.2.
5.3.3.
Page -7-
Mechanical Installation
6.
5.3.4.
5.3.5.
5.3.6.
5.3.7.
5.3.8.
5.3.9.
5.3.10.
5.3.11.
PAINTING
Touch-up painting of installed mechanical equipment shall be in
accordance with the following:
6.1.
Page -8-
Mechanical Installation
6.2.