Professional Documents
Culture Documents
Predicting and Tracking The Value of Injection Wellwork For Wets .
Predicting and Tracking The Value of Injection Wellwork For Wets .
Predicting and Tracking The Value of Injection Wellwork For Wets .
Also use
calculated Value
of Water to track
Injector Wellwork
benefits in WETs.
Actually realized to
a 920 bopd increase
associated with
2600 bwpd injection
into F-88i (value of
water = 0.35 bo/bw).
Well Management Masterclass, Oct 30-Nov 3, 2006
Bw
Secondary Recovery
Inj. Water Value = Oil Cut * Bo * Est. Ultimate Recovery
2H 04 F-88i Pattern Parameters:
Plug in
Qo = 975 bopd
Qw = 490 bwpd
Bw = 1.02
1.15
Bo =
RF secondary = 20%
total = 35%
RF
J-10
Total
Fluid
Bw = 1.02
Bo = 1.15
FCO
Total injection
decline due to
fill
RF secondary =
20%
RF total = 35%
Value of
Water = 0.12
bo/bw
For 800 bwpd
increased
injection
shifted
Oil rate
decline
IOR = 100
bopd
Qwi Qw Bw Qo Bo WOR Bo
Bw
Bw
for WOR 0
Bo
OC for Bw / Bo 1
Qwi Qw Bw Qo Bo RFtotal
RFsec ondary
1
WOR
Bo
Bw
RFtotal
Bw RFsec ondary
for WOR 0
Bo RFtotal
RFsec ondary
OC
for Bw / Bo 1
RFtotal