Professional Documents
Culture Documents
Checking Points of BTS
Checking Points of BTS
1. Indoor
1.1 Cable ladder
1.2 Cabinets
If there are two cabinets, height between them should not be more than 2 mm.
Slant of the cabinet should not be more than 3 mm
1.4 Cabling
2. Outdoor
2.1 Feeder system
3 ECB positions
BTS
Room
-
White color cable tie should be used in INDOOR and black color for OUTDOOR