Detail of Column and Footing Detail of Septic Tank: Section
Detail of Column and Footing Detail of Septic Tank: Section
Detail of Column and Footing Detail of Septic Tank: Section
80 m
VERTICAL BARS
10 MM
TIES SPACING
AT 2-50MM, 2-100 MM,
2-150MM AND THE REST
AT 200 MM O.C.
0.80
1.50 m
4-12MM
NGL
1.00
x
7-12 mm
HOR.
BARS O.C., B.W.
MH
0.25
SECTION
INLET PIPE
1.00
0.30
1.80 m
4-12MM
VERTICAL BARS
MH
10 MM
TIES SPACING
AT 2-50MM , 2-100 MM ,
2-150MM AND THE REST
AT 200 MM O.C.
AIR SPACE
0.30
7-12 mm HOR.
BARS O. C., B.W.
1. 50 m
1.00
INLET
DIGESTIVE
CHAMBER
4.00
PLAN C-1/F1